MARIPOSA COUNTY AIR POLLUTION CONTROL DISTRICT
RULE 602 - PERMIT FEE SCHEDULES
SCHEDULE I
ELECTRIC MOTOR HORSEPOWER SCHEDULE.V
Any equipment which may cause the emission of air contaminants where an electric motor is used as the power supply shall be assessed a permit fee based on the total rated motor horsepower of all electric motors included in any article, machine, equipment, or other contrivance, in accordance with the following schedule:
| HORSEPOWER | FEE |
| (A) Less than 50 | $ 55.00 |
| (B) 50 or greater but less than 100 | $110.00 |
| (C) 100 or greater but less than 200 | $ 165.00 |
| (D) 200 or greater but less than 300 | $ 220.00 |
| (E) 300 or greater but less than 400 | $ 275.00 |
| (F) 400 or greater but less than 500 | $ 330.00 |
| (G) 500 or greater but less than 600 | $ 385.00 |
| (H) 600 or greater | $ 440.00 |
SCHEDULE II
FUEL BURNING EQUIPMENT SCHEDULE
Any equipment which may cause the emission of air contaminants in which fuel is burned, with the exception of incinerators which are covered in Schedule 4, shall be assessed a permit fee based upon the design of the equipment expressed in British Thermal Units (BTU) per hour in accordance with the following schedule:
| 1,000 BTU PER HOUR | FEE |
| (A) Less than 1,500 | $ 55.00 |
| (B) 1,500 or greater but less than 5,000 | $ 165.00 |
| (C) 5,000 or greater but less than 15,000 | $ 220.00 |
| (D) 15,000 or greater but less than 50,000 | $ 385.00 |
| (E) 50,000 or greater but less than 100,000 | $ 660.00 |
| (F) 100,000 or greater but less than 200,000 | $ 990.00 |
| (G) 200,000 or greater | $ 1265.00 |
SCHEDULE III
ELECTRICAL ENERGY SCHEDULE
Any equipment which may cause the emission of air contaminants which uses electrical energy, with the exception of electric motors covered in Schedule I, shall be assessed a permit fee based upon the total kilovolt ampere (KVA) ratings, in accordance with the following schedule:
| KILVOLT AMPERES | FEE |
| (A) Less than 50 | $ 55.00 |
| (B) 150 or greater but less than 450 | $ 110.00 |
| (C) 450 or greater but less than 4.500 | $ 165.00 |
| (D) 4,500 or greater but less than 14,500 | $ 220.00 |
| (E) 14,500 or greater but less than 45,000 | $ 275.00 |
| (F) 45 000 or greater | $ 330.00 |
SCHEDULE IV
INCINERATOR SCHEDULE
Any equipment designed and used primarily to dispose of combustible refuse by wholly consuming the material charge leaving only the ashes or residue shall be assessed a permit fee based on the following schedule of the maximum horizontal inside cross sectional area, in square feet, of the primary combustion chamber:
| AREA IN SQUARE FEET | FEE |
| (A) Less than 10 | $ 55.00 |
| (B) 10 or greater but less than 15 | $ 110.00 |
| (C) 15 or greater but less than 25 | $ 165.00 |
| (D) 25 or greater but less than 40 | $ 220.00 |
| (E) 40 or greater but less than 100 | $ 330.00 |
| (F) 100 or greater |
SCHEDULE V
STATIONARY CONTAINER SCHEDULE
Any stationary tank, reservoir, or other container, with the exception of stationary storage tanks covered in Schedule 6 herein, shall be assessed a permit fee on the following schedule of capacities in Gallons or cubic equivalent:
| GALLONS | FEE |
| (A) Less than 40,000 | $ 55.00 |
| (B) 40,000 or greater but less than 100, 000 | $ 110.00 |
| (C) 100,000 or greater but less than 400,000 | $ 165.00 |
| (D) 400,000 or greater but less than 1,000,000 | $ 220.00 |
| (E) 1,000,000 or greater but less than 1,500,000 | $ 275.00 |
| (F) 1,500,000 or greater | $ 330.00 |
SCHEDULE VI
GASOLINE FUELING EQUIPMENT SCHEDULE
Any gasoline fueling equipment, at a single location including stationary gasoline storage tanks and dispensers, required to have a vapor recovery system shall be assessed an annual permit fee based on the number of gasoline dispensing nozzles, in accordance with the following schedule:
Nozzles
| Each | . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. . . .. . . . . . . . .. . . . . . | $ 15.00 |
SCHEDULE VII
MISCELLANEOUS SCHEDULE
Any article, machine, equipment, or other contrivance which may cause the issuance of air contaminants as defined in Rule 102 of the Rules and Regulations which is not included in the preceding schedules shall be assessed a permit fee of 525.00.
SCHEDULE VIII
EMISSION FEE SCHEDULE
Each ton (rounded to the nearest ton ) for any one of the following air contaminants: gaseous sulfur compounds (expressed as sulfur dioxide), total organic gases, oxides of nitrogen (expressed as nitrogen dioxide), or particulate matter; and in excess of 10 tons per year (rounded to the nearest ton) for carbon monoxide shall be assessed a fee as set forth in the following schedule:
| AIR CONTAMINANT |
DOLLARS PER TON |
| Organic gases |
$ 20.00 |
| Carbon monoxide |
$ 3.50 |
| Oxides of nitrogen (expressed as nitrogen dioxide) |
$ 8.00 |
| Gaseous sulfur compounds (expressed as sulfur dioxide) |
$ 48.00 |
| Particulate matter |
$ 33.00 |
SCHEDULE IX
OPEN BURNING
Burns less than 100 acres. . . . . . . . . . . . .$ 15.00
Burns 100 acres or greater . . . . . . . . . . .$ 25.00