NORTHERN SONOMA COUNTY AIR POLLUTION CONTROL DISTRICT
APPENDIX B - CONTINUOUS MONITORING
I. INSTALLATION AND START UP
Owners or operators of sources required to have continuous emission monitors shall have installed all necessary
equipment and shall have begun monitoring and recording by October 6, 1978.
II. REPORTING
(a) File of Records
Owners or operators subject to the provisions of these rules and regulations shall maintain for a period of at
least two years a record in a permanent form suitable for inspection and shall make such record available upon
request, to the Air Resources Board and the District. The record shall include:
(b) Quarterly Report
Owners or operators subject to provisions of these rules and regulations shall submit a written report for each
calendar quarter to the Control Officer. The report is due by the 30th day following the end of the calendar quarter
and shall include:
(c) Reports of Violations
Any violation of any emission standard to which the stationary source is required to conform, as indicated by the
records of the monitoring device, shall be reported by the operator of the source to the District within 96 hours
after such occurrence. The District shall, in turn, report the violation to the Air Resources Board within five
working days after receiving the report of the violation from the operator.
III. DATA REDUCTION
Data shall be reduced according to the procedure established in 40 CFR,
Part 51, Appendix P, paragraphs 5.0 through 5.3.3, or by other methods deemed equivalent by joint decision of the
District, Air Resources Board, and Environmental Protection Agency.
IV. STANDARDS OF PERFORMANCE OF MONITORING SYSTEMS
(a) Systems shall be installed, calibrated, maintained, and operated in
accordance with the following sections of 40 CFR:
(b) Calibration gas mixtures shall meet the specifications in 40 CFR, Part 51,
Appendix P, Section 3.3 and Part 60, Appendix B, Performance Specification 2, Section 2.11.
(c) Cycling times shall be those specified in 40 CFR, Part 51, Appendix P, Section 3.4, 3.4.1, and 3.4.2.
(d) The continuous SO2 and NOx monitors shall meet the applicable performance specification requirements in 40
CFR, Part 51, Appendix P, and Part 60, Appendix B.
(e) The continuous CO2 and O2 monitoring systems shall meet the performance specification requirements in CFR 40,
Part 51, Appendix P, and Part 60, Appendix B.
(f) Opacity monitoring systems shall meet the performance specifications of 40 CFR 60, Appendix B, Performance
Specification No. 1.
Equivalent alternate performance specifications may be established by mutual agreement of the Environmental Protection
Agency, Air Resources Board and the District.
V. DEFINITIONS
Definitions shall be those given in 40CFR, Part 51.