SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
RULE 1148 - THERMALLY ENHANCED OIL RECOVERY WELLS
(Adopted November 5, 1982)
(a) Definitions
(A) 250 foot radius of the steam injection well, if the steam injection well is within a 2-1/2 acre or smaller production well pattern; or
(B) 350 foot radius of the steam injection well, if the steam injection well is within a production well pattern of 5 acres or smaller but larger than 2-1/2 acres; or
(C) 500 foot radius of the steam injection well, if the steam injection well is within a production well pattern larger than 5 acres; or
(D) 1,000 foot radius of the steam injection well, if the production well is not in one of the above specified patterns.
(b) Requirements
(c) Compliance
(A) Shall be in full compliance with the provisions of this rule by 19 months after adoption of this rule; and
(B) For any operator who chooses to control the emissions from the well by installing a vapor control system shall comply with the following schedule of increments of progress:
(i) Upon adoption of this rule, submit to the Executive Officer a final control plan which describes, as a minimum the steps, including construction schedules, that will be taken to achieve compliance with the provisions of this rule and an application for authority to construct the proposed vapor control system.
(ii) Three months after adoption of this rule, provide documentation to the Executive Officer that contracts or purchase orders for the control system and component parts have been issued.
(iii) Nine months after adoption of this rule, initiate
on-site construction or installation of the vapor control system.(iv) Seventeen months after adoption of this rule, complete on-site construction of the vapor control system.
(v) Nineteen months after adoption of this rule, demonstrate full compliance with the provisions of this rule.
(d) Exemptions
(A) Steam is injected more frequently than once every 45 days; or
(B) For such wells that are steamed less frequently than once every 45 days, there is no visible vapor plume when the casing vent is open and the ambient air temperature is sixty degrees Fahrenheit (33.3 Celcius degrees) or greater, 45 days after steam injection has ceased; and
(C) Records are made available, upon request, to the Executive Officer of:
(i) date of injection;
(ii) the amount of steam injected expressed as volume of water.