CHOOSE ONE OF THE FOLLOWING:
Recently Completed Reports
Category III Projects
Category II. Short Term Studies to Support
SIP Process
Category I Projects
Field Program Reports
Planning Documents
Recently
Completed Reports
III-3 Update
Integrated Transport Network
Contract: 04-02
Investigators: Alpine Geophysics
On-Site Dairy Emissions Measurement Using
Flux Chambers
Contract: 05-05
Investigator: C.E. Schmidt
Please see three reports posted under
this general title at http://www.arb.ca.gov/ag/caf/caf.htm
III-7 Advanced
Data Analysis - Phase 2
Contract: 01-03
Investigators: UC Davis, DRI
Task 2: Comparison
of Proportions of Species Derived from Ambient Emissions Data
Task 3: Volatile Organic
Compound Source Apportionment using Chemical Mass Balance Receptor
Modeling
III-24 Model
the September 2000 CCOS episode
Contract: 03-01
Investigator: Alpine (AG)
III-32 Data
Validation
Contract: 05-01
Investigator: STI
II-1 Completion
of Project Planning for CCOS
Contract: 00-21
Investigator: DRI
II-2 PAN
and NO2 Data Processing
Contract: 02-04
Investigator: CE-CERT
II-3 Database
Development for CCOS
Contract: 02-03
Investigator: Capitol Data Works
II-4 Analysis
of Remote Sensing Data
Contract: 00-14
Investigator: UC Berkeley
II-5 Analysis
of VOC Data
Contract: 00-14
Investigator: UC Berkeley
II-6 Completion
of Project Planning for CCOS
Contract: n/a
Investigator: Alpine Geophysics
Service Contract -
No Report
II-7 Analysis
of Elevated NOx Plumes
Contract: n/a
(contract to CDC/EPRI) Investigator: TVA
Aircraft Measurements
of Power Plant Plumes During CCOS and Their Use for the Evaluation
of the SCICHEM Model 1007633 - March 2003 -
Please
request copy of report directly from investigator at: www.epri.com
II-8
Characterization of Summertime 2000 Measurement Period in Central
California - Phase 2
Contract: 01-02
Investigator: T&B Systems
II-13
Modification of the SAQM and its Meteorological Preprocessor for
the CCOS Modeling Domain
Contract: 02-05
Investigator: Environ
Service Contract -
No Report
I-1 Validation
of CCOS Data
Contract: 00-21
Investigator: DRI
I-2 Biogenic
Emissions Model Expansion
Contract: 00-16
Investigator: UC Cooperative Extension
I-3 Point
and Area Source Emissions Update
Contract: 00-22
Investigator: UC Davis, STI
I-4 Area
Source Surrogates
Contract: 00-24
Investigator: STI
Revised
Temporal Allocation Factors for Area and Off-Road Emissions Sources
- September 2001 (pdf - 224kb)
I-5 Source
Sampling of Power Plants
Contract: 00-28
Investigator: UC Riverside
Emissions From an
Electrical Power Generating Unit- May 2002
Moss
Landing Unit #1 (pdf - 287 kb)
Pittsburg
Unit #6 (pdf - 293 kb)
I-6 Day-Specific
Traffic Count Data
Contract: n/a
Investigator: UC Davis
I-7 Characterization
of CCOS Episodes - Phase I
Contract: 01-02
Investigator: T&B Systems
I-8 Advanced
Data Analysis - Phase I
Contract: 01-03
Investigator: UC Davis
I-9 Enhancement
of Plume-in-Grid Modeling in Central California
Contract: 01-01
Investigator: EPRI
A Study of Mesoscale
Transport and Boundary Layer Processes in the Central Valley of
California
Contract: 00-01
Investigator: NOAA
Continuous Upper-Air
Meteorological Monitoring Using Four Radar Wind Profilers and
RASS
Contract: 00-03
Investigator: STI
No Report
Ozonesonde Operations for the CCOS
Contract: 00-04
Investigator: T&B Systems
Instrumented Aircraft Measurements
Contract: 00-05
Investigator: STI
Measurements
Made Aloft by Two Aircraft to Support the Central California Ozone
Study - November 2001(pdf - 2416 kb)
Acquisition and Testing
of Air Quality Analyzers for CCOS Supplemental Monitoring Sites
and TDLAS Measurements
Contract: 00-06
Investigator: UC Riverside
No Report
Supplemental Monitoring Setup
Contract: 00-08
Investigator: ENSR
Station Setup - No
Report
Volatile Organic Compounds
Collection and Analysis by the Continuous GC/MS Method
Contract: 00-09
Investigator: DRI
Volatile Organic Compounds
Collection and Analysis by the Canister and Tenax Methods
Contract: 00-10
Investigator: DRI
Supplemental Surface
Measurement Installation and Site Operation
Contract: 00-11
Investigator: DRI
Station Setup - No
Report
Supplemental Site Operation
Contract: 00-12
Investigator: T&B Systems
Station Operation
- No Report
Check Out, Installation,
and Tear Down NOx Analyzers by BAAQMD
Contract: 00-13
Investigator: UC Riverside
Service Contract
- No Report
Meteorological Monitoring
Contract: 00-15
Investigator: PG&E
No Report
Plume Measurements
Using Aircraft
Contract: 00-17
Investigator: TVA
No Report
Planning Study for
Power Plant Plume Measurements
Contract: 00-18
Investigator: AER
Quality Assurance
of CCOS Data
Contract: 00-19
Investigator: Parsons
Measurement of Carbonyl
Compounds
Contract: 00-20
Investigator: AtmAA
Updating Point Source Emission Inventories in
the Sacramento Valley and Mountain Counties using Student Assistants
Contract: 00-22
Investigator: UC Davis
Aircraft Rental for
Power Plant Plume Measurements
Contract: 00-23
Investigator: Twin Otter
Service Contract
- No Report
Surface and Upper-Air
Monitoring in the Bay Area
Contract: 00-27
Investigator: T&B Systems
Mobile Monitoring
Station for CCOS
Contract: 00-29
Investigator: Lewis Potter
Service Contract
- No Report
Contract: 00-30
Investigator: Elight Laser Systems
Sonic Anemometer Measurements of Atmospheric
Turbulence
Contract: 00-31
Investigator: UC Davis
No Report
Contract: 98-718
Investigator: UC Davis
Data
Analysis and Modeling Support Studies for the Central California
Ozone Study (CCOS) – Plan Update (DRI and ARB) - March
7, 2003 (pdf - 349 kb)
The Central California Ozone Study -
Final Report (Summary of Field Operation,
Vol III) (zipped files - 1637 kb)
The Central California Ozone Study -
Comprehensive Plan (pdf - 66 kb ;
doc - 88 kb ) - January 19, 1999
CCOS Plan Documents, version 2 (pdf
format ) - September 7, 1999
CCOS Plan Documents, version 3 (pdf
format ; doc
format ) - November 30, 1999
CCOS Operational Plan , version 2 (pdf
format ; doc
format )- June 28, 2000