TRU Compliance Extensions
This page last reviewed September 6, 2012.
The following applications in the table below are used to apply for extensions to the December 31, 2012 compliance deadline for specific circumstances as provided for in the 2011 Amendments of the TRU ATCM. Both excel and pdf versions of the applications are available.
The
excel applications can only be submitted with all
supporting documentation by e-mail to arber@arb.ca.gov.
The pdf applications can either be submitted with all supporting
documentation by e-mail to
arber@arb.ca.gov
OR
by mail to:
California Air Resources Board
Stationary Source Division (ARBER/TRU)
PO Box 2815
Sacramento, CA 95812
Information
submitted must be true, accurate, and complete. Within 30
days of
a change in ownership or compliance status, the new information must be
entered in the ARBER system. This includes updates to the
company
profile and primary contact information. Failure to report
updates or submittal of false information is a violation of state law
subject to civil and criminal penalties.
|
Application for Compliance Extension for In-Use Performance Standards Based on Delays Due to Equipment Manufacture Delays, Installer Delays or Private Financing. (Excel version) (PDF version) |
This
application can be used for a one-time extension of up to four (4) months for delays in compliance provided documentation for the delay and the application are submitted prior to December 31, 2012 for model year 2005. (See 13 CCR 2477.5 (l)). The owner must have ordered the compliance technology no later than two months before the compliance date (October 31, 2012) for VDECS retrofit compliance technologies and no later than four months before the compliance date (August 31, 2012) for engine replacments, unit replacements, and trailer replacements. The purchase order must be consistent with these dates. |
|
Application for Compliance Extension for In-Use Performance Standards Based on Unavailability of Compliance Technology. (Excel version) (PDF version) |
This application can be used for a extension of one (1) year for unavailability of compliance technology provided documentation for the demonstration is submitted. The application is required to be submitted six (6) months prior to the compliance date for the engine, however applications for engines with 2012 compliance dates will be accepted until October 15, 2012 because of the late effective date of the 2011 Amendments. (See 13 CCR 2477.5 (k)). |
|
Safe Passage for Noncompliant Equipment Traveling in California. (PDF version) |
This application can be
used for a safe passage permit if the purpose for the TRU travelling in California is to take the noncompliant TRU to a dealer or installer to bring the equipment into compliance. The TRU shall not be operating in a noncompliant state in California and no temperature-sensitive products shall be transported in a vehicle with a noncompliant TRU. (See 13 CCR 2477.5 (n)). |
If you have any questions related to completing these forms, please contact our toll-free helpline at 1-888-878-2826.


