MODOC COUNTY AIR POLLUTION CONTROL DISTRICT
RULE 6.1 - STANDARDS FOR PERMITS TO CONSTRUCT
(Amended Date Unknown)
A. General
- The Control Officer shall deny a permit to construct for any new stationary source or modification or any portion
thereof, unless the applicant certifies that all other stationary sources in the state which are owned or operated
by the applicant are in compliance or are on approved schedule for compliance, with all applicable emission limitations
and standards under the Clean Air Act (42 USC 7401 et. seq.) and all applicable emission limitations and standards
which are part of the State Implementation Plan approved by the Environmental Protection Agency.
- The Control Officer shall deny a permit to construct for a new stationary source or modification with a net
increase in emissions as specified in Section B.1. unless all district regulations contained in the State Implementation
Plan approved by the Environmental Protection Agency are being carried out in accordance with that plan.
B. Applicability and Exemptions
- Sections B., C., D., E., F., G., H., and I. shall apply to new stationary sources and modifications which result
in either:
- A net increase in emissions of 250 or more pounds during any day of any pollutant for which there is a national
ambient air quality standard (excluding carbon monoxide), or any precursor of such a pollutant: or
- A net increase in emissions of 2500 or more pounds of carbon monoxide during any day.
- New sources and modifications shall be exempt from the requirement for offsets (Section E.), although BACT
is still required providing the source:
- Will be used exclusively for providing essential public services, such as schools, hospitals, or police and
fire fighting facilities, but specifically excluding sources of electrical power generation other than for emergency
standby use at essential public service facilities.
- Is exclusively a modification to convert from use of a gaseous fuel to a liquid fuel because of a demonstrable
shortage of gaseous fuels, provided the applicant establishes to the satisfaction of the Control Officer that he/she
has made his/her best efforts to obtain sufficient emissions offsets pursuant to Section E. of this rule, that
such efforts had been unsuccessful as of the date the application was filed, and the applicant agrees to continue
to seek the necessary emissions offsets until construction on the new stationary source or modification begins.
This exemption shall only apply if, at the time the permit to operate was issued for the gas burning equipment,
such equipment could have burned the liquid fuel without additional controls and been in compliance with all applicable
district regulations.
- Is portable sandblasting equipment used on a temporary basis within the district.
- Is a cogeneration project, a project using refuse-derived or biomass-derived fuels for energy generation, or
a resource recovery project using municipal wastes, provided the applicant established by modeling that the new
source or modification will not cause a violation or exacerbate an existing violation of any national ambient air
quality standard at the point of maximum ground level impact allowing for the subtraction of any natural background
levels of particulate matter (non-respirable size}.
C. Calculation of Emissions
- In determining the emissions from a proposed new or modified stationary source estimates shall be based on
maximum design capacity, permit limitations on the operation of the new source or modification, or source test
data from identical equipment or estimates based upon a combination of these methods.
- In determining emissions from an existing stationary source emissions shall be based on specific limiting permit
conditions or source test data based upon normal operating conditions or a combination of these methods.
- The net increase in emissions from new stationary sources and modifications which are not seasonal sources
shall be determined using yearly emissions profiles. Yearly emissions profiles for an existing or proposed stationary
source or modification shall be constructed by plotting the daily emissions from such source. A separate profile
shall be constructed for each pollutant emitted.
- The net increase in emissions from new stationary sources and modifications which are seasonal sources shall
be determined using yearly and quarterly emissions profiles. A separate profile shall be constructed for each pollutant
emitted.
- When computing the net increase in emissions for modifications, the Control Officer shall take into account
the cumulative net emissions changes (increases and reductions) which are represented by permits to construct associated
with the existing stationary source and issued pursuant to this rule, excluding any emissions reductions required
to comply with federal, state, or district laws, rules or regulations.
D. Best Available Control Technology (BACT)
New stationary sources and modifications excluding cargo carriers, shall be constructed using best available
control technology.
E. Mitigation (Offsets)
For new stationary sources and modifications mitigation shall be required for net emissions increases (i.e.
increases after the application of best available control technology):
- Of each pollutant for which a national ambient air quality standard was exceeded three discontinuous times
(for annual standards, one time) within the district within the three years immediately preceding the date when
the application for the permit to construct was filed and for all precursors of such pollutants provided, however,
that mitigation of net emission increases of sulfur oxides, total suspended particulates or carbon monoxide shall
not be required if the applicant demonstrates through modeling that emissions from the new source or modification
will not cause a new violation of any national ambient air quality standard for such pollutants, or make any existing
violation of any such standard worse, at the point of maximum ground level impact.
- Net emissions increases subject to this section shall be mitigated (offset) by reduced emissions from existing
stationary nonstationary sources. Emissions reductions shall be sufficient to offset any net emissions increase
and shall take effect at the times, or before initial operation, of the new source, or within 90 days after initial
operation of a modification and shall continue as long as the new or modified source is operating.
- Emissions offset profiles may be used to determine whether proposed offsets mitigate the net emissions increases
from proposed new sources or modifications. For all offset sources, a yearly emissions offset profile shall be
constructed in a manner similar to that used to construct the yearly emissions profile for the proposed new or
modified source. A separate profile shall be constructed for each pollutant emitted. Seasonal offsets shall not
be used to mitigate the emissions from nonseasonal sources.
- A ratio of emissions offsets to emissions from the new source or modification (offset ratio) of 1.2:1 shall
be required for emissions of offsets located within a 15-mile radius of the proposed new source or modification
and based upon emissions profiles.
- For proposed emission offsets in which the offset ratio is from 1:1 to 1.2:1 the applicant shall conduct modeling
to verify a net air quality benefit in the area affected by emissions from the new source or modification.
- If an applicant certifies that the proposed new source or modification is a replacement for the applicant's
pre-existing source which was shut down or curtailed after February 16, 1979, emissions reductions associated with
such shutdown or curtailment may be used as offsets for the proposed source, subject to the offset provision of
this section.
- Emissions reductions resulting from measures required by adopted federal, state, or district laws, rules or
regulations shall not be allowed as emissions offsets unless a complete application incorporating such offsets
was filed with the district prior to the date of adoption of the laws, rules or regulations.
- The Control Officer may allow emissions reductions which exceed those required by this rule for a new source
or modification to be banked for use in the future by the applicant. Such reductions shall be used only to offset
emissions increases from proposed new sources or modifications owned or operated by the applicant within 15 miles
of the site where the reductions occurred.
- Emissions reductions of one precursor (or primary pollutant) may be used to offset emission increases of another
precursor of the same pollutant. The ratio of emission reductions for interpollutant offsets shall be determined
by the Control Officer based on existing air quality data and subject to approval of the Air Resources Board.
F. Permit Condition Requirements
The Control Officer shall place written conditions on the permits of the new stationary source or modification
and the source(s) used to provide offsets to ensure that all sources are operated in the manner assumed in making
the analysis required to determine compliance with this rule. The permit shall include an emission limitation which
corresponds with the application of BACT. In no event shall the emission rate reflected by the control technique
or limitation exceed the amount allowable under applicable new source performance standards. If offsets are obtained
from a source for which there is no permit to operate, a written contract shall be required between the applicant
and the owner or operator of such source which contract, by its terms, shall be enforceable by the Control Officer.
G. Analysis, Notice, and Reporting
Following acceptance of an application as complete, the Control Officer shall:
- Perform the evaluations required to determine compliance with this rule and make a preliminary written decision
as to whether a permit to construct should be approved, conditionally approved, or disapproved. The decision shall
be supported by a succinct written analysis.
- Within 10 calendar days following such decision, publish a notice by prominent advertisement in at least one newspaper
of general circulation in the district stating the preliminary decision of the Control Officer and where the public
may inspect the required information. The notice shall provide 30 days from the date of publication for the public
to submit written comments on the preliminary decision.
- At the time notice of the preliminary decision is published, make available for public inspection at the District
Office the information submitted by the applicant, the Control Officer's supporting analysis for the preliminary
decision, and the preliminary decision to grant or deny the permit to construct, including any proposed permit
conditions, and the reasons therefor.
- No later than the date of publication of the notice, forward the analysis, the preliminary decision, and copies
of the notice to the Air Resources Board and Regional Office of the Environmental Protection Agency.
- Consider all written comments submitted during the 30-day public comment period.
- Within 180 days after acceptance of the application as complete, take final action on the application after
considering all written comments. The Control Officer shall provide written notice of the final action to the applicant,
the Environmental Protection Agency, and the Air Resources Board; shall publish such notice in a newspaper of general
circulation; and shall make the notice and all supporting documents available for public inspection at the District
Office.
H. Power Plants
All power plants proposed to be constructed in the district and for which a Notice of Intention (NOI) or Application
for Certification (AFC) has been accepted by the California Energy Commission shall be evaluated in accordance
with the ARB/CEC agreement adopted on January 23, 1979. The Control Officer, pursuant to Section 25538 of the Public
Resources Code, may apply for reimbursement of all costs, including lost fees, incurred in order to comply with
the provisions of this section.
I. Definitions
- Best Available Control Technology (BACT)
For any source the more stringent of:
- the most effective emissions control technique which has been achieved in practice, for such category or class
of sources; or
- any other emissions control technique found, after public hearing, by the Control Officer and the Air Resources
Board to be technologically feasible and cost effective for such class or category of sources or for a specific
source; or
- for those pollutants for which the national ambient air quality standards are violated in the district, the
most effective emission limitation which the Environmental Protection Agency certifies is contained in the implementation
plan of any state approved under the Clean Air Act for such class or category of source, unless the owner or operator
of the proposed source demonstrates that such limitations are not achievable.
- Modification
Any physical change in, change in method of operation of, or addition to an existing stationary source, except
that routine maintenance or repair shall not be considered to be a physical change. A change in the method of operation,
unless previously limited by an enforceable permit condition, shall not include:
- An increase in the production rate, if such increase does not exceed the operating design capacity of the source.
- An increase in the hours of operation.
- Change in ownership of a source.
- Stationary Source
Any structure, building, facility, equipment, installation or operation (or aggregation thereof) which is located
on one or more bordering properties within the district and which is owned, operated, or under shared entitlement
to use by the same person. Items of air contaminant-emitting equipment shall be considered aggregated into the
same stationary source, and items of non-air-contaminant-emitting equipment shall be considered associated with
air-contaminant-emitting equipment only if:
- The operation of each item of equipment is dependent upon, or affects the process of, the others; and
- The operation of all such items of equipment involves a common raw material or product.
Emissions from all such aggregated items of air-contaminant-emitting equipment and all such associated items of
non-air-contaminant-emitting equipment of a stationary source shall be considered emissions of the same stationary
source. The emissions from all cargo carriers (excluding motor vehicles) while operating within the district shall
be considered as emissions from the stationary source.
- Precursor
A directly emitted pollutant that, when released to the atmosphere, forms or causes to be formed or contributes
to the formation of a secondary pollutant for which an ambient air quality standard has been adopted, or whose
presence in the atmosphere will contribute to the violation of one or more ambient air quality standards.
| Precursors |
Secondary Pollutants |
| Hydrocarbons and substituted hydrocarbons (reactive organic gases) |
a. Photochemical oxidant (ozone)
b. The organic fraction of suspended particulate matter. |
| Nitrogen oxides (NOx) |
a. Nitrogen dioxide (NO2)
b. The nitrate fraction of suspended particulate matter.
c. Photochemical oxidant (ozone) |
| Sulfur oxides (SOx) |
a. Sulfur dioxide (SO2)
b. Sulfates (SO4)
c. The sulfate fraction of suspended particulate matter. |
- Seasonal Source
Any source with more than 75 percent of its annual operating hours within a consecutive 90-day period.
- Modeling
Using an air quality simulation model, based on specified assumptions and data, which has been approved in writing
by the Executive Officer of the Air Resources Board.
J. Severability
If any portion of this rule is found to be unenforceable, such finding shall have no effect on the enforceability
of the remaining portions of the rule, which shall continue to be in full force and effect.