Workshop Comments Log
Below is the Comment Log for South Coast Air Basin Electric Reliability and Offset Assessment (ab1318-ws).
# | Received From | Subject | Comment Period |
Date/Time Added to Database | Additional |
1 | Gough, Kassandra, Calpine Corporation | Calpine Comments on Draft Final AB 1318 Report | 1st Workshop | 2013-10-31 17:11:36 | |
2 | Lucas, Robert, ClearEdge Power | Comments re AB 1318 Report | 1st Workshop | 2013-11-04 12:56:50 | |
3 | Rubalcava, Sharon , Alston & Bird | Comments on the Draft Final Report: Assembly Bill 1318: Assessment of Electrical Grid Reli | 1st Workshop | 2013-11-06 10:25:21 |
|
4 | Woodruff, Kevin, Consultant to TURN | Comments on Draft AB 1318 Report | 1st Workshop | 2013-11-06 16:49:51 |
|
5 | Rothrock, Dorothy, | CMTA comments on Draft Final AB 1318 Report | 1st Workshop | 2013-11-07 14:44:27 | |
6 | Foster, John, | Comments on the Draft South Coast Air Basin Electric Reliability and Offset Assessment | 1st Workshop | 2013-11-07 15:07:05 | |
7 | Grizard, Erin, Bloom Energy | Bloom Energy Comments on Draft AB 1318 Report | 1st Workshop | 2013-11-07 16:15:09 | |
8 | Martinez, Adrian, | Coalition Comments on the draft AB 1318 Report | 1st Workshop | 2013-11-07 16:24:59 | |
9 | Webb, Michael, City of Redondo Beach | Comments on Draft Final AB1318 Report | 1st Workshop | 2013-11-12 11:25:13 |
Comments posted to ab1318-ws that were presented during the Workshop:
There are no comments posted to ab1318-ws that were presented during the Workshop at this time.
We expect that any written comments received during the Workshop will be posted within one week of the Workshop.
Compilation of all printable comments for ab1318-ws
If you have any questions or comments please contact Office of the Ombudsman at (916) 327-1266.