Off-Road Large Spark-Ignition Equipment-Documents
This page last reviewed August 07, 2008.
|
All documents are provided in chronological order in Adobe Acrobat (PDF), unless otherwise indicated. |
||
| Meeting Presentations | |||
|
Verified Devices |
|||
| Title | Date | ||
|
|
Frequently asked questions for Large Spark Ignition (LSI) Engine Fleet Requirements | July 31, 2008 |
|
|
|
Formal Regulatory Documents for the 2006 LSI Rulemaking: |
February 1, 2007 | |
|
|
Formal Regulatory Documents for the 2006 LSI Rulemaking: |
December 8, 2006 | |
|
|
Formal Regulatory Documents for the 2006 LSI Rulemaking: |
December 1, 2006 | |
|
|
Formal Regulatory Documents for the 2006 LSI Rulemaking:
|
April 26, 2006 | |
|
|
Formal Regulatory Documents for the 2006 LSI Rulemaking:
|
March 3, 2006 | |
|
|
Formal Regulatory Documents for the 2005 LSI Rulemaking:
|
May 6, 2005 | |
|
|
The Interim Verification Procedure For Retrofit Systems To Reduce Hydrocarbon And Oxides Of Nitrogen Emissions From Off-Road Large Spark-Ignition Engines And Equipment Greater Than 25 Horsepower
|
April 18, 2005 | |
|
|
Updated Draft Proposal to Reduce Emissions from Off-Road Large Spark-Ignition Equipment Greater Than 25 Horsepower | March 16, 2005 | |
|
|
Corrected Manufacturers Advisory Correspondence (MAC) 2005-01
|
March 16, 2005 | |
|
|
Draft Proposal
to Reduce Emissions from Off-Road Large Spark-Ignition Equipment Greater Than 25 Horsepower
(Updated due to typographical changes on page 14.) |
August 19, 2004 | |
|
|
Draft Proposal for a Retrofit Verification Protocol for Off-Road Large Spark-Ignition Equipment Greater Than 25 Horsepower: |
August 17, 2004 | |
|
|
Draft Retrofit Verification Protocol | May 21, 2004 | |
|
|
Draft Proposed Regulatory Concepts | May 17, 2004 | |
|
|
LSI Regulatory Options | April 2004 | |
|
|
LSI Site Visits | April 2004 | |
|
|
Refinement of Selected Fuel-Cycle Emissions Analyses | April 20, 2001 | |
|
|
LSI Emissions Inventory Methodology and Input Factors (MSC #98-27) | 1998 | |


