Advanced Locomotive Technology Demonstrations

The Air Resources Board (ARB) has funded and participated, with U.S. EPA and local air pollution control districts, in a number of technology demonstrations to determine the technical feasibility, potential emission reductions, costs, and cost effectiveness of advanced technology locomotives (see below) that can further reduce emissions in California.

ARB Locomotive Emission Verifications

The Air Resources Board is also responsible for issuing locomotive emission verifications (see below) to determine eligibility for: 1) 1998 Agreement Ultra-Low Emitting Locomotive (ULEL) credit, and 2) ARB incentive funding programs such as Proposition 1B, Carl Moyer, and AB 118 - Air Quality Improvement Program (AQIP).

Key Program Links:


Advanced Locomotive Technology Demonstrations


  • National Railway Equipment Company (NREC)

    • Tier 4 genset switch locomotive (NREX 2015

      • Tier 4 NOx: 1.3 g/bhp-hr NOx.  Tier 4 PM: 0.03 g/bhp-hr.

    • AB 118 Demonstration

    • Cummins QSX15 engine with EGR (Exhaust Gas Recirculation) and DPF (Diesel Particulate Filter)

    • Demonstration at Richmond Pacific Terminal Railroad at Port of Richmond, CA

    • Project Manager: Bay Area Air Quality Management District

    • $529,810, Fiscal Year 10/2011

  • GT Exhaust (GTE)

    • Tier 4 PM Genset Switch Locomotive

      • Tier 4 PM: 0.03 g/bhp-hr. Existing Genset NOx: < 3.0 g/bhp-hr

    • AB 118 Demonstration

    • DPF retrofit onto an existing genset switch locomotive (BNSF 1284)

    • Demonstration at the BNSF Richmond Railyard in Richmond, CA

    • Project Manager: Bay Area Air Quality Management District

    • $270,190, Fiscal Year 10/2011, Status-Ongoing

    • Final Report June 2013 (PDF - 7.03MB)

  • Electro-Motive Diesel (EMD)

    • Tier 3+ Medium Horsepower Line Haul Locomotive with EGR and DOC (Diesel Oxidation Catalyst)/DPFs (UP 9900)

      • Tier 2+ NOx: 3.5 g/bhp-hr.  Tier 4 PM: 0.03 g/bhp-hr.

    • AB 118 Demonstration

    • $502,865, Fiscal Year 09/2010, Status-Phase 2 Field Demonstration Ongoing

    • Final Report of First Phase Demonstration (September 2012).

    • Sacramento Metropolitan AQMD (Air Quality Management District) funded two-year field demonstration from UP Roseville

    • Project Manager: Sacramento Metropolitan AQMD

    • Final Report August 2012 (PDF - 1.33MB)

  • Johnson Matthey (JM)

    • DPF retrofit onto an existing genset switch locomotive (UPY 2755)

      • Tier 4 PM: 0.03 g/bhp-hr.  Existing Genset NOx: < 3.0 g/bhp-hr.

    • AB 118 Demonstration

    • Demonstration at the UP Dolores Railyard in Carson, CA

    • Project Manager: Ports of Los Angeles/Long Beach

    • $346,178, Fiscal Year 09/2010, Status-Ongoing

    • Final Report December 2013 (PDF - 9.1MB)
  • Caterpillar/Progress Rail (Cat/PR)

    • Demonstration of a Tier 2 engine repower with SCR (2nd generation) and DOC retrofits to achieve Tier 4 emission levels (PRLX 3004)

      • Tier 4 NOx: 1.3 g/bhp-hr. PM: 0.03 g/bhp-hr.

    • U.S. EPA Emerging Technology Grant ($1.2 Million)

    • Demonstration at the Arizona and California Railroad in Parker, Arizona.

    • Project Manager: Mike Jaczola - ARB

    • Final Report Pending

  • Caterpillar/ Progress Rail (CAT/PR)

    • Tier 2 engine repower with SCR (1st Generation) and DOC retrofits to achieve Tier 4 emission levels - (2009-2010) (PRLX 3004).

    • ARB Partial Funding

    • Demonstration at the UP Colton Railyard in Bloomington, CA

    • Project Manager: Mike Jaczola - ARB

    • $585,000, Final Report Issued May 2011

    • Final Report (PDF - 3.04MB)


ARB Locomotive Emission Verifications



Line Haul Locomotives


  • Caterpillar/Progress Rail Tier 4 Emission Level - Tier 2 engine repower with SCR and DOC Retrofits - on an older line haul locomotive to achieve Tier 4 emission levels - February 22, 2011

  • Miratech Diesel Oxidation Catalyst retrofit onto an older line haul locomotive - October 14, 2010

  • General Electric (GE) Locomotive SmartBurn Technology on new line haul locomotives - August 23, 2006

Genset Switch Locomotives

  • Brookville Equipment Company (BEC) - November 23, 2011 (BMEX 259)

  • Caterpillar/Progress Rail - April 6, 2010 (PR22) and November 24, 2010 (PR15B) 

  • Johnson Matthey (JM) - February 25, 2014
  • Motive Power (MP) - September 3, 2008, November 23, 2010

  • National Railway Equipment Company (NREC) - April 13, 2009 (UPY 2701)

  • Railpower (RP - now R.J. Corman) - January 25, 2011 (UPY 896)

Electric Battery Hybrid Switch Locomotives

  • Railpower Battery Hybrid "Green Goat" Switch Locomotive - March 2, 2006 (RPRX 2405)

Liquefied Natural Gas Switch (LNG) Locomotives

  • Morrison Knudsen (Now Motive Power) Liquefied Natural Gas (LNG) Switch Locomotive - May 24, 2010 ( BNSF 1200)

    • ARB Verification Letter -- Broken link removed on 12232013 />   (PDF - 26KB)



Please contact Michael Jaczola, Staff Air Pollution Specialist, at (916) 327-5607 if you have any questions about ARB locomotive demonstration programs or locomotive emission verifications.