|
|
|
|
|
|
Gasoline Vapor Recovery Certification
and Test Procedures
OLD VOLUME 2 - DATED JULY 3, 2002
This page created February 27, 2004
|
The July 3, 2002 version of Volume 2 was superseded by the October 8, 2003 version, which was effective January 4, 2004. The 2002 procedures are provided to support system certifications issued under these procedures. Stationary Source Test Methods, Volume 2, Certification and Test Procedures for Gasoline Vapor Recovery Systems, can be downloaded in three formats MS Word, WordPerfect, and Adobe Acrobat. The links in the table below provide access to individual sections of Volume 2 in uncompressed MS Word, WordPerfect, or Adobe Acrobat (PDF) format. The hypertext links in the table indicate the size of each file. |
|
Test Method |
Test Method Title |
MS Word/WP |
PDF |
Date of Adoption or Amendment |
|
D-200 |
Definitions for Vapor Recovery |
July 3, 2002 |
||
|
CP-201 |
Certification Procedure for Vapor Recovery Systems at Dispensing Facilities - ISD Appendix |
July 1, 2003 |
||
|
TP-201.1 |
Volumetric Efficiency for Phase I Vapor Recovery Systems |
February 1, 2001 |
||
|
TP-201.1A |
Emission Factor for Phase I Systems at Dispensing Facilities |
February 1, 2001 |
||
|
TP-201.1B |
Static Torque of Rotatable Phase I Adaptors |
July 3, 2002 |
||
|
TP-201.1C |
Pressure Integrity of Drop Tube Drain Valve Assembly |
July 3, 2002 |
||
|
TP-201.1D |
Pressure Integrity of Drop Tube Overfill Protection Devices |
July 3, 2002 |
||
|
TP-201.2 |
Efficiency and Emission Factor for Phase II Systems |
July 25, 2001 |
||
|
TP-201.2 |
Figures |
July 25, 2001 |
||
|
TP-201.2A |
Determination of Vehicle Matrix for Phase II Systems |
February 1, 2001 |
||
|
TP-201.2B |
Pressure Integrity Vapor Recovery Equipment |
February 1, 2001 |
||
|
TP-201.2C |
Spillage from Phase II Systems |
February 1, 2001 |
||
|
TP-201.2D |
Post-Fueling Drips from Nozzle Spouts |
February 1, 2001 |
||
|
TP-201.2E |
Gasoline Liquid Retention in Nozzles and Hoses |
February 1, 2001 |
||
|
TP-201.2F |
Pressure-Related Fugitive Emissions |
February 1, 2001 |
||
|
TP-201.2H |
Determination of Hazardous Air Pollutants from Vapor Recovery Processors |
February 1, 2001 |
||
|
TP-201.3 |
Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities |
March 17, 1999 |
||
|
TP-201.3A |
Determination of 5 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities |
April 12, 1996 |
||
|
TP-201.3B |
Determination of Static Pressure of Vapor Recovery Systems of Dispensing Facilities with Above-Ground Storage Tanks |
April 12, 1996 |
||
|
TP-201.3C |
Determination of Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test) |
March 17, 1999 |
||
|
TP-201.4 |
Dynamic Back Pressure |
July 3, 2002 |
||
|
TP-201.5 |
Air to Liquid Volume |
February 1, 2001 |
||
|
TP-201.6 |
Determination of Liquid Removal of Vapor Recovery Systems of Dispensing Facilities |
April 28, 2000 |
||
|
TP-201.6C |
Compliance Determination of Liquid Removal Rate |
July 3, 2002 |
||
|
CP-202 |
Certification Procedure for Vapor Recovery Systems of Bulk Plants |
March 17, 1999 |
||
|
TP-202.1 |
Determination of Emission Factors of Vapor Recovery Systems of Bulk Plants |
March 17, 1999 |
||
|
CP-203 |
Certification Procedure for Vapor Recovery Systems of Terminals |
March 17, 1999 |
||
|
TP-203.1 |
Determination of Emission Factors of Vapor Recovery Systems of Terminals |
March 17, 1999 |
||
|
CP-204 |
Certification Procedure for Vapor Recovery Systems of Cargo Tanks |
March 17, 1999 |
||
|
TP-204.1 |
Determination of Five Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks |
March 17, 1999 |
||
|
TP-204.2 |
Determination of One Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks |
March 17, 1999 |
||
|
TP-204.3 |
Determination of Leaks |
March 17, 1999 |
||
|
CP-205 |
Certification Procedure for Vapor Recovery Systems of Novel Facilities |
March 17, 1999 |
||
|
TP-205.1 |
Determination of Efficiency of Phase I Vapor Recovery Systems of Novel Facilities |
March 17, 1999 |
||
|
TP-205.2 |
Determination of Efficiency of Phase II Vapor Recovery Systems of Novel Facilities |
March 17, 1999 |
|
|