|
|
|
This page created September 22, 2004
|
The October 8, 2003 version of Volume 2 was superseded by the July 22, 2004 version, which became effective August 12, 2004. The 2003 procedures are provided to support system certifications issued under these procedures.
Stationary Source Test Methods, Volume 2, Certification and Test Procedures
for Gasoline Vapor Recovery Systems, can be downloaded in two formats MS Word and Adobe
Acrobat. The links in the table below provide access to individual sections of Volume 2 in uncompressed
MS Word or Adobe Acrobat (.PDF) format. The hypertext links in the table indicate the size of each
file.
|
|
Test Method Number |
Test Method Title | MS Word |
PDF Format |
Date of Adoption or Amendment |
| D-200 | Definitions for Vapor Recovery | 128K | 305K | October 8, 2003 |
| CP-201 | Certification Procedure for Vapor Recovery Systems at Dispensing Facilities * See EO G-70-203 for Revisions to EVR Phase II Operative Dates |
441K |
112 |
October 8, 2003 |
| TP-201.1 | Volumetric Efficiency for Phase I Systems | 1,023K | 161K | October 8, 2003 |
| TP-201.1A | Emission Factor for Phase I Systems at Dispensing Facilities | 1,014K | 154K | February 1, 2001 |
| TP-201.1B | Static Torque of Rotatable Phase I Adaptors | 121K | 128K | October 8, 2003 |
| TP-201.1C | Leak Rate of Drop Tube/Drain Valve Assembly | 200K | 197K | October 8, 2003 |
| TP-201.1D | Leak Rate of Drop Tube Overfill Protection Devices and Spill Container Drain Valves | 278K | 221K | October 8, 2003 |
| TP-201.1E | Leak Rate and Cracking Pressure of Pressure/Vacuum Vent Valves | 169K | 128K | October 8, 2003 |
| TP-201.2 | Efficiency and Emission Factor for Phase II Systems | 141K | 150K | October 8, 2003 |
| TP-201.2 | Figures | 3,465K | 885K | October 8, 2003 |
| TP-201.2A | Determination of Vehicle Matrix for Phase II Systems | 62K | 23K | February 1, 2001 |
| TP-201.2B | Flow and Pressure Measurement of Vapor Recovery Equipment | 1,046K | 570K | October 8, 2003 |
| TP-201.2C | Spillage from Phase II Systems | 197K | 110K | February 1, 2001 |
| TP-201.2D | Post-Fueling Drips from Nozzles | 314K | 156K | October 8, 2003 |
| TP-201.2E | Gasoline Liquid Retention in Nozzles and Hoses | 120K | 43K | February 1, 2001 |
| TP-201.2F | Pressure-Related Fugitive Emissions | 98K | 129K | October 8, 2003 |
| TP-201.2G | Bend Radius Determination for Underground Storage Tank Vapor Return Piping | 1,440K | 139K | October 8, 2003 |
| TP-201.2H | Determination of Hazardous Air Pollutants from Vapor Recovery Processors | 256K | 73K | February 1, 2001 |
| TP-201.2I | Test Procedure for In-Station Diagnostic Systems | 116K | 136K | October 8, 2003 |
| TP-201.2J | Pressure Drop Bench Testing of Vapor Recovery Components | 498K | 201K | October 8, 2003 |
| TP-201.3 | Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities | 322K | 62K | March 17, 1999 |
| TP-201.3A | Determination of 5 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities | 80K | 107K | April 12, 1996 |
| TP-201.3B | Determination of Static Pressure of Vapor Recovery Systems of Dispensing Facilities with Above-Ground Storage Tanks | 93K | 118K | April 12, 1996 |
| TP-201.3C | Determination of Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test) | 54K | 87K | March 17, 1999 |
| TP-201.4 | Dynamic Back Pressure | 1,182K | 107K | July 3, 2002 |
| TP-201.5 | Air to Liquid Volume | 1,453K | 123K | February 1, 2001 |
| TP-201.6 | Determination of Liquid Removal of Vapor Recovery Systems of Dispensing Facilities | 54K | 27K | April 28, 2000 |
| TP-201.6C | Compliance Determination of Liquid Removal Rate | 180K | 50K | July 3, 2002 |
| TP-201.7 | Continuous Pressure Monitoring | 182K | 98K | October 8, 2003 |
| CP-202 | Certification Procedure for Vapor Recovery Systems of Bulk Plants | 87K | 221K | March 17, 1999 |
| TP-202.1 | Determination of Emission Factors of Vapor Recovery Systems of Bulk Plants | 145K | 239K | March 17, 1999 |
| CP-203 | Certification Procedure for Vapor Recovery Systems of Terminals | 87K | 226K | March 17, 1999 |
| TP-203.1 | Determination of Emission Factors of Vapor Recovery Systems of Terminals | 147K | 233K | March 17, 1999 |
| CP-204 | Certification Procedure for Vapor Recovery Systems of Cargo Tanks | 153K | 339K | March 17, 1999 |
| TP-204.1 | Determination of Five Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks | 106K | 135K | March 17, 1999 |
| TP-204.2 | Determination of One Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks | 505K | 1,020K | March 17, 1999 |
| TP-204.3 | Determination of Leaks | 840K | 220K | March 17, 1999 |
| CP-205 | Certification Procedure for Vapor Recovery Systems of Novel Facilities | 122K | 185K | March 17, 1999 |
| TP-205.1 | Determination of Efficiency of Phase I Vapor Recovery Systems of Novel Facilities | 259K | 370K | March 17, 1999 |
| TP-205.2 | Determination of Efficiency of Phase II Vapor Recovery Systems of Novel Facilities | 303K | 362K | March 17, 1999 |
| Top of page
|