California Air Resources Board

California Air Resources Board

Gasoline Vapor Recovery Test Methods
OLD VOLUME 2 - Dated August 6, 2004

This page updated April 8, 2005


The August 6, 2004 version of Volume 2 (which was incorrectly dated July 22, 2004 or August 12, 2004 at times) was superseded by the February 9, 2005 version, which became effective March 24, 2005. The difference between the 2004 and 2005 version are the changes in EVR implementation dates in section 2 of CP-201. The 2004 procedures are provided to support system certifications issued under these procedures.

Stationary Source Test Methods, Volume 2, Certification and Test Procedures for Gasoline Vapor Recovery Systems, can be downloaded in two formats MS Word and Adobe Acrobat.  The links in the table below provide access to individual sections of Volume 2 in uncompressed MS Word or Adobe Acrobat (.PDF) format. The hypertext links in the table indicate the size of each file.


Test Method
Number

Test Method Title

MS Word

PDF
Format

Date of Adoption or Amendment

D-200

Definitions for Vapor Recovery

128K

305K

October 8, 2003

CP-201

Certification Procedure for Vapor Recovery Systems at Dispensing Facilities
* See EO G-70-203 and G-70-205 for Revisions to EVR Phase II Operative Dates


441K


112

August 6, 2004

TP-201.1

Volumetric Efficiency for Phase I Systems

1,023K

161K

October 8, 2003

TP-201.1A

Emission Factor for Phase I Systems at Dispensing Facilities

1,014K

154K

February 1, 2001

TP-201.1B

Static Torque of Rotatable Phase I Adaptors

121K

128K

October 8, 2003

TP-201.1C

Leak Rate of Drop Tube/Drain Valve Assembly

200K

197K

October 8, 2003

TP-201.1D

Leak Rate of Drop Tube Overfill Protection Devices and Spill Container Drain Valves

278K

221K

October 8, 2003

TP-201.1E

Leak Rate and Cracking Pressure of Pressure/Vacuum Vent Valves

169K

128K

October 8, 2003

TP-201.2

Efficiency and Emission Factor for Phase II Systems

141K

150K

October 8, 2003

TP-201.2

Figures

3,465K

885K

October 8, 2003

TP-201.2A

Determination of Vehicle Matrix for Phase II Systems

62K

23K

February 1, 2001

TP-201.2B

Flow and Pressure Measurement of Vapor Recovery Equipment

1,046K

570K

October 8, 2003

TP-201.2C

Spillage from Phase II Systems

197K

110K

February 1, 2001

TP-201.2D

Post-Fueling Drips from Nozzles

314K

156K

October 8, 2003

TP-201.2E

Gasoline Liquid Retention in Nozzles and Hoses

120K

43K

February 1, 2001

TP-201.2F

Pressure-Related Fugitive Emissions

98K

129K

October 8, 2003

TP-201.2G

Bend Radius Determination for Underground Storage Tank Vapor Return Piping

1,440K

139K

October 8, 2003

TP-201.2H

Determination of Hazardous Air Pollutants from Vapor Recovery Processors

256K

73K

February 1, 2001

TP-201.2I

Test Procedure for In-Station Diagnostic Systems

116K

136K

October 8, 2003

TP-201.2J

Pressure Drop Bench Testing of Vapor Recovery Components

498K

201K

October 8, 2003

TP-201.3

Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities

322K

62K

March 17, 1999

TP-201.3A

Determination of 5 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities

80K

107K

April 12, 1996

TP-201.3B

Determination of Static Pressure of Vapor Recovery Systems of Dispensing Facilities with Above-Ground Storage Tanks

93K

118K

April 12, 1996

TP-201.3C

Determination of Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test)

54K

  87K

March 17, 1999

TP-201.4

Dynamic Back Pressure

1,182K

107K

July 3, 2002

TP-201.5

Air to Liquid Volume

1,453K

123K

February 1, 2001

TP-201.6

Determination of Liquid Removal of Vapor Recovery Systems of Dispensing Facilities

54K

27K

April 28, 2000

TP-201.6C

Compliance Determination of Liquid Removal Rate

180K

50K

July 3, 2002

TP-201.7

Continuous Pressure Monitoring

182K

98K

October 8, 2003

CP-202

Certification Procedure for Vapor Recovery Systems of Bulk Plants

87K

221K

March 17, 1999

TP-202.1

Determination of Emission Factors of Vapor Recovery Systems of Bulk Plants

145K

239K

March 17, 1999

CP-203

Certification Procedure for Vapor Recovery Systems of Terminals

87K

226K

March 17, 1999

TP-203.1

Determination of Emission Factors of Vapor Recovery Systems of Terminals

147K

233K

March 17, 1999

CP-204

Certification Procedure for Vapor Recovery Systems of Cargo Tanks

153K

339K

March 17, 1999

TP-204.1

Determination of Five Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks

106K

135K

March 17, 1999

TP-204.2

Determination of One Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks

505K

1,020K

March 17, 1999

TP-204.3

Determination of Leaks

840K

220K

March 17, 1999

CP-205

Certification Procedure for Vapor Recovery Systems of Novel Facilities

122K

185K

March 17, 1999

TP-205.1

Determination of Efficiency of Phase I Vapor Recovery Systems of Novel Facilities

259K

370K

March 17, 1999

TP-205.2

Determination of Efficiency of Phase II Vapor Recovery Systems of Novel Facilities

303K

362K

March 17, 1999

Top of page 

Gasoline Vapor Recovery Systems Test Methods
-----------------------
A department of the California Environmental Protection Agency