This page last reviewed January 25, 2010
Certification and Test Procedures
Stationary Source Test Methods, Volume 2, Certification and Test Procedures for Gasoline Vapor Recovery Systems, can be downloaded in two formats MS Word and Adobe Acrobat. The links in the table below provide access to individual sections of Volume 2 in uncompressed MS Word or Adobe Acrobat (.PDF) format.
The May 25, 2006 version of Volume 2 was superseded by the May 2, 2008 version, which became effective July 12, 2008. The difference between the 2006 and 2008 version are the changes in D-200, TP-201.2, and new certification procedure CP-206 and test prodecures TP-206.1, TP-206.2, and TP-206.3. You can access archived versions of old Volume 2 Test Methods by clicking here.
For questions
or comments related to these documents, or to request a bound hard copy
volume, please contact Kevin Mongar of the Engineering and
Certification Branch at (916) 322-2502 or via e-mail at kmongar@arb.ca.gov.
![]()
|
Test
Method |
Test Method Title |
MS Word |
PDF |
Date of Adoption or Amendment |
|
D-200 |
Definitions for Vapor Recovery |
May 2, 2008 |
||
|
CP-201 |
Certification
Procedure for Vapor Recovery Systems at Dispensing Facilities |
May 25, 2006 |
||
|
TP-201.1 |
Volumetric Efficiency for Phase I Systems |
October 8, 2003 |
||
|
TP-201.1A |
Emission Factor for Phase I Systems at Dispensing Facilities |
February 1, 2001 |
||
|
TP-201.1B |
Static Torque of Rotatable Phase I Adaptors |
October 8, 2003 |
||
|
TP-201.1C |
Leak Rate of Drop Tube/Drain Valve Assembly |
October 8, 2003 |
||
|
TP-201.1D |
Leak Rate of Drop Tube Overfill Protection Devices and Spill Container Drain Valves |
October 8, 2003 |
||
|
TP-201.1E |
Leak Rate and Cracking Pressure of Pressure/Vacuum Vent Valves |
October 8, 2003 |
||
|
TP-201.1E CERT |
Leak Rate and Cracking Pressure of Pressure/Vacuum Vent Valves |
May 25, 2006 |
||
|
TP-201.2 |
Efficiency and Emission Factor for Phase II Systems |
May 2, 2008 |
||
|
TP-201.2 |
Figures |
October 8, 2003 |
||
|
TP-201.2A |
Determination of Vehicle Matrix for Phase II Systems |
February 1, 2001 |
||
|
TP-201.2B |
Flow and Pressure Measurement of Vapor Recovery Equipment |
October 8, 2003 |
||
|
TP-201.2C |
Spillage from Phase II Systems |
February 1, 2001 |
||
|
TP-201.2D |
Post-Fueling Drips from Nozzles |
October 8, 2003 |
||
|
TP-201.2E |
Gasoline Liquid Retention in Nozzles and Hoses |
February 1, 2001 |
||
|
TP-201.2F |
Pressure-Related Fugitive Emissions |
October 8, 2003 |
||
|
TP-201.2G |
Bend Radius Determination for Underground Storage Tank Vapor Return Piping |
May 25, 2006 |
||
|
TP-201.2H |
Determination of Hazardous Air Pollutants from Vapor Recovery Processors |
February 1, 2001 |
||
|
TP-201.2I |
Test Procedure for In-Station Diagnostic Systems |
May 25, 2006 |
||
|
TP-201.2J |
Pressure Drop Bench Testing of Vapor Recovery Components |
October 8, 2003 |
||
|
TP-201.3 |
Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities |
March 17, 1999 |
||
|
TP-201.3A |
Determination of 5 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities |
April 12, 1996 |
||
|
TP-201.3B |
Determination of Static Pressure of Vapor Recovery Systems of Dispensing Facilities with Above-Ground Storage Tanks |
April 12, 1996 |
||
|
TP-201.3C |
Determination of Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test) |
March 17, 1999 |
||
|
TP-201.4 |
Dynamic Back Pressure |
July 3, 2002 |
||
|
TP-201.5 |
Air to Liquid Volume |
February 1, 2001 |
||
|
TP-201.6 |
Determination of Liquid Removal of Vapor Recovery Systems of Dispensing Facilities |
April 28, 2000 |
||
|
TP-201.6C |
Compliance Determination of Liquid Removal Rate |
July 3, 2002 |
||
|
TP-201.7 |
Continuous Pressure Monitoring |
October 8, 2003 |
||
|
CP-202 |
Certification Procedure for Vapor Recovery Systems of Bulk Plants |
March 17, 1999 |
||
|
TP-202.1 |
Determination of Emission Factors of Vapor Recovery Systems of Bulk Plants |
March 17, 1999 |
||
|
CP-203 |
Certification Procedure for Vapor Recovery Systems of Terminals |
March 17, 1999 |
||
|
TP-203.1 |
Determination of Emission Factors of Vapor Recovery Systems of Terminals |
March 17, 1999 |
||
|
CP-204 |
Certification Procedure for Vapor Recovery Systems of Cargo Tanks |
March 17, 1999 |
||
|
TP-204.1 |
Determination of Five Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks |
March 17, 1999 |
||
|
TP-204.2 |
Determination of One Minute Static Pressure Performance of Vapor Recovery Systems of Cargo Tanks |
March 17, 1999 |
||
|
TP-204.3 |
Determination of Leaks |
March 17, 1999 |
||
|
CP-205 |
Certification Procedure for Vapor Recovery Systems of Novel Facilities |
March 17, 1999 |
||
|
TP-205.1 |
Determination of Efficiency of Phase I Vapor Recovery Systems of Novel Facilities |
March 17, 1999 |
||
|
TP-205.2 |
Determination of Efficiency of Phase II Vapor Recovery Systems of Novel Facilities |
March 17, 1999 |
||
|
CP-206 |
Certification Procedure for Vapor Recovery Systems at Gasoline Dispensing Facilities Using Aboveground Storage Tanks |
May 2, 2008 |
||
|
TP-206.1 |
Determination of Emission Factor for Standing Loss Control Vapor Recovery Systems Using Temperature Attenuation Factor at Gasoline Dispensing Facilities Using Aboveground Storage Tanks |
May 2, 2008 |
||
|
TP-206.2 |
Determination of Emission Factor for Standing Loss Control Vapor Recovery Systems Using Processors at Gasoline Dispensing Facilities Using Aboveground Storage Tanks |
May 2, 2008 |
||
|
TP-206.3 |
Determination of Static Pressure Performance of Vapor Recovery Systems at Gasoline Dispensing Facilities Using Aboveground Storage Tanks |
May 2, 2008 |
|
|


