|
|
|
|
|
|
|
Executive Order G-70-150-AD This page updated July 14, 2004. |
|
|
| Executive Order G-70-150-AD Modification of the Certification of the Gilbarco VaporVac Phase II Vapor Recovery System (Acrobat 818K) The above document is also available below in its 16 subparts: |
| Legal Language (Acrobat 78K) | |
| Equipment List (Acrobat 31K) | |
| OPW Model 11VAI-xx Nozzle (Acrobat 50K) | |
| Husky Model V3-6201xxx Nozzle (Acrobat 26K) | |
| Emco Wheaton Model A4500 Nozzle (Acrobat 59K) | |
| Specifications for the VaporVac Bootless Nozzle System (Acrobat 25K) | |
| Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 57K) | |
| Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 47K) | |
| Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 52K) | |
| Typical Installation of the Gilbarco VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 52K) | |
| Component Parts of the VaporVac System (Acrobat 66K) | |
| VaporVac Dispenser Types (Acrobat 234K) | |
| Static Pressure Integrity Test Underground Storage Tanks (Acrobat 132K) | |
| Pressure Decay Leak Rate Criteria (Acrobat 8K) | |
| Summary of Source Test Results (Acrobat 14K) | |
| Ten Gallon Per Minute Requirement (Acrobat 8K) |
|
|
|
A Department of the California Environmental Protection Agency |