California Air Resources Board

California Air Resources Board

 

Executive Order G-70-150-AE

This page updated July 27, 2004.

 


Executive Order G-70-150-AE
Modification to the Certification of the Marconi Commerce Systems (MCS) Inc. "Formerly Gilbarco" VaporVac Phase II Vapor Recovery System (PDF Format 1.6MB)

The above document is also available below in its 23 subparts:
 
Legal Language (Acrobat 46K)
Equipment List (Acrobat 15K)
EMCO Wheaton Retail Model A4500 Nozzle (Acrobat 59K)
Husky Model V3-6201xxx Nozzle (Acrobat 23K)
OPW Model 11VAI-xx Nozzle (Acrobat 47K)
Catlow Model ICVN Nozzle (Acrobat 41K)
EMCO Wheaton Retail Model A4505 Nozzle (Acrobat 146K)
Husky Model V34 6250 Nozzle (Acrobat 63K)
OPW 12 VW Nozzle (Acrobat 62K)
MCS VaporVac Dispenser Types (Acrobat 235K)
MCS VaporVac Dispenser Types (Acrobat 423K)
Specifications for the MCS VaporVac Bootless Nozzle System (Acrobat 27K)
Typical Installation of the MCS VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 39K)
Typical Installation of the MCS VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 34K)
Typical Installation of the MCS VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 41K)
Typical Installation of the MCS VaporVac Phase II Vapor Recovery System with Two-Point Phase I System (Acrobat 40K)
Component Parts of the MCS VaporVac System (Acrobat 63K)
Installation of A/L Adaptor (Acrobat 25K)
Instructions for use of the 6250 A/L Adaptor (Acrobat 52K)
Static Pressure Integrity Test Underground Storage Tanks (Acrobat 100K)
Pressure Decay Leak Rate Criteria (Acrobat 4K)
Summary of Source Test Results (Acrobat 9K)
Ten Gallon Per Minute Requirement (Acrobat 5K)
   
 

Top of Page

Phase II Executive Orders

-----------------------

A Department of the California Environmental Protection Agency