California Air Resources Board

California Air Resources Board

 

Executive Order G-70-153-AC

This page updated July 22, 2004.

 


Executive Order G-70-153-AC
Modification to the Certification of the Dresser/Wayne WayneVac Phase II Vapor Recovery System (Acrobat 519K)

The above document is also available below in its 22 subparts:
 
Legal, Equipment List and Specifications (Acrobat 49K)
OPW Model 11VAI Nozzle with Vapor Valve (Acrobat 13K)
Husky Model V34 6200-4 Nozzle (Acrobat 11K)
Husky Model V34 6200 Nozzle (Acrobat 13K)
Husky Model V34 6250 Nozzle (Acrobat 12K)
Emco Wheaton A4505 Nozzle (Acrobat 38K)
Catlow ICVN Nozzle (Acrobat 9K)
Richards Astrovac Nozzle (Acrobat 13K)
WayneVac Retrofit Gilbarco MPD's (Acrobat 8K)
Dispenser Retrofit Identification (Acrobat 13K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 45K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 41K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 45K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 46K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 38K)
Hose Configurations and Possibilities For Vista and Nonvista Dispensers (Acrobat 11K)
Instructions for use of the 6250 A/L Adaptor (Acrobat 12K)
Installation of A/L Adaptor (Acrobat 26K)
Static Pressure Integrity Test (Acrobat 133K)
Summary of Source Test Results (Acrobat 12K)
Pressure Decay Leak Rate Table (Acrobat 7K)
Ten Gallon Per Minute Requirement (Acrobat 7K)
   
 

Top of Page

Executive Orders

 

-----------------------

A Department of the California Environmental Protection Agency