California Air Resources Board

California Air Resources Board

Executive Order G-70-153-AD

This page updated July 27, 2004.

 


Executive Order G-70-153-AD
Modification to the Certification of the Dresser/Wayne WayneVac Phase II Vapor Recovery System (Acrobat 1,125K)

The above document is also available below in its 24 subparts:
 
Legal, Equipment List & Specifications (Acrobat 115K)
OPW Model 11VAI Nozzle with Vapor Valve (Acrobat 63K)
Husky Model V34 6200-4 Nozzle (Acrobat 39K)
Husky Model V34 6200 Nozzle (Acrobat 51K)
Husky Model V34 6250 Nozzle (Acrobat 50K)
Emco Wheaton A4505 Nozzle (Acrobat 223K)
Catlow ICVN Nozzle (Acrobat 26K)
Richards Astrovac Nozzle (Acrobat 45K)
OPW 12VW Nozzle (Acrobat 33K)
WayneVac Retrofit Gilbarco MPD's (Acrobat 25K)
Dispenser Retrofit Identification (Acrobat 42K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 192K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 152K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 189K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 196K)
Typical Installation of the Dresser Wayne WayneVac Phase II Vapor Recovery System with a Two-Point Phase I System (Acrobat 136K)
Hose Configurations and Possibilities For Vista and Nonvista Dispensers
(Acrobat 43K)
Hose Configuration Option (Acrobat 74K)
Instructions for use of the 6250 A/L Adaptor (Acrobat 62K)
Installation of A/L Adaptor (Acrobat 26K)
Static Pressure Integrity Test (Acrobat 99K)
Summary of Source Test Results (Acrobat 9K)
Pressure Decay Leak Rate Table (Acrobat 4K)
Ten Gallon Per Minute Requirement (Acrobat 5K)
   
 

Top of Page

Executive Orders

 

-----------------------

A Department of the California Environmental Protection Agency