Executive Order G-70-163-AA

This page last reviewed April 19, 2016


Executive Order G-70-163-AA

Modification to the Certification of the OPW VaporEZ Phase II Vapor Recovery System (PDF Format 437K).

The above document is also available below in it's 14 subparts:


Legal Legal & Exhibit 1 Legal, Equipment List & Specifications
(PDF Format 74K)
Figure 1A OPW Model 11VAI-XX Nozzle (PDF Format 13K)
Figure 1B Blackmer Model VRFO Vapor Pump Assembly Options
(PDF Format 35K)
Figure 1C Dispenser Configurations Approved for use with the VaporEZ System (PDF Format 21K)
Exhibit 2 Specifications for the Vapor EZ Bootless Nozzle System (PDF Format 23K)
Figure 2A Component Parts of the VaporEZ System (PDF Format 45K)
Figure 2B-1 Typical Installation of the OPW VaporEZ Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 37K)
Figure 2B-2 Typical Installation of the OPW VaporEZPhase II Vapor Recovery System with Two-Point Phase I System (PDF Format 31K)
Figure 2B-3 Typical Installation of the OPW VaporEZPhase II Vapor Recovery System with Two-Point Phase I System (PDF Format 37K)
Figure 2B-4 Typical Installation of the OPW VaporEZ Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 36K)
Exhibit 3 Leak Decay Test (PDF Format 133K)
Table 3-1 Pressure Decay Leak Rate Table (PDF Format 7K)
Form 3-1 Summary of Source Test Results (PDF Format 12K)
Exhibit 4 Ten Gallon Per Minute Requirement (PDF Format 7K)

preload