1998-03-04 G-70-183 Certification of Healy/Franklin Vacuum Assist Phase II Vapor Recovery System

This page last reviewed August 10, 2010


Executive Order G-70-183


Certification of the Healy/Franklin Vacuum Assist Phase II Vapor Recovery System (PDF Format   449K)
 
The above document is also available below in its 11 subparts:
 
Legal, Equipment List & Specifications (PDF Format - 85K)
Leak Decay Test, Table and Form (PDF Format - 140K)
Ten Gallon Per Minute Requirement (PDF Format - 7K)
ORVR Compatibility Nozzle Factory Rebuild Program (PDF Format - 5K)
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 47K)
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 45K)
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 50K)
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 50K)
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 40K)
Healy Model 600 Nozzle (PDF Format - 20K)
Franklin Electric VP1000 Vapor Pump (PDF Format - 22K)

preload