1998-03-04 G-70-183 Certification of Healy/Franklin Vacuum Assist Phase II Vapor Recovery System
This page last reviewed August 10, 2010
Executive Order G-70-183
Certification of the Healy/Franklin Vacuum Assist Phase II Vapor Recovery System (PDF Format 449K) |
| |
| The above document is also available below in its 11 subparts: |
| |
|
|
Legal, Equipment List & Specifications (PDF Format - 85K) |
|
|
Leak Decay Test, Table and Form (PDF Format - 140K) |
|
|
Ten Gallon Per Minute Requirement (PDF Format - 7K) |
|
|
ORVR Compatibility Nozzle Factory Rebuild Program (PDF Format - 5K) |
|
|
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump
(PDF Format - 47K) |
|
|
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump
(PDF Format - 45K) |
|
|
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump
(PDF Format - 50K) |
|
|
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump
(PDF Format - 50K) |
|
|
Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump
(PDF Format - 40K) |
|
|
Healy Model 600 Nozzle (PDF Format - 20K) |
|
|
Franklin Electric VP1000 Vapor Pump (PDF Format - 22K) |