1998-03-04 G-70-183 Certification of Healy/Franklin Vacuum Assist Phase II Vapor Recovery System

This page last reviewed August 10, 2010


Executive Order G-70-183


Exhibit 1 & Exhibit 2 Legal, Equipment List & Specifications (PDF Format - 85K)
Exhibit 3 Leak Decay Test, Table and Form (PDF Format - 140K)
Exhibit 4 Ten Gallon Per Minute Requirement (PDF Format - 7K)
Exhibit 5 ORVR Compatibility Nozzle Factory Rebuild Program (PDF Format - 5K)
Figure 2A-1 Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 47K)
Figure 2A-2 Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 45K)
Figure 2A-3 Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 50K)
Figure 2A-4 Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 50K)
Figure 2A-5 Typical Installation of the Healy 600 Phase II Vapor Recovery System with a Franklin Electric VP-1000 Vapor Pump (PDF Format - 40K)
Figure 2B-1 Healy Model 600 Nozzle (PDF Format - 20K)
Figure 2B-2 Franklin Electric VP1000 Vapor Pump (PDF Format - 22K)

preload