2001-06-29 G-70-183-AA Healy Systems, Inc.; Relating to Language Correction in Existing Executive Order G-70-183

This page last reviewed August 10, 2010


Executive Order G-70-183-AA
Relating to Language Correction in Existing Executive Order G-70-183 (PDF Format - 453K)
 

The above document is also available below in its 11 subparts:

Legal Language (PDF Format - 149K)
Equipment List (PDF Format - 9K)
Specifications for the Healy/Franklin System (PDF Format - 30K)
Ten Gallon Per Minute Requirement (PDF Format - 6K)
Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Manifolded Tanks and Three Non-Manifolded Vapor Vent Lines (PDF Format - 192K)
Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with One Three Inch Diameter Vapor Vent Line
(PDF Format - 152K)
Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Three Manifolded Vapor Vent Lines
(PDF Format - 189K)
Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Remote Vapor Adapters and Three Manifolded Vapor Vent Lines (PDF Format - 196K)
Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with One Two Inch Diameter Vapor Vent Line
(PDF Format - 137K)
Healy Model 600 Nozzle (PDF Format - 15K)
Healy/Franklin Electric VP1000 Vapor Pump (PDF Format - 50K)