2001-06-29 G-70-183-AA Healy Systems, Inc.; Relating to Language Correction in Existing Executive Order G-70-183
This page last reviewed August 10, 2010
| Executive Order G-70-183-AA |
| Relating to Language Correction in Existing Executive Order G-70-183 (PDF Format - 453K) |
|
The above document is also available below in its 11 subparts:
|
| Legal Language (PDF Format - 149K) | |
| Equipment List (PDF Format - 9K) | |
| Specifications for the Healy/Franklin System (PDF Format - 30K) | |
| Ten Gallon Per Minute Requirement (PDF Format - 6K) | |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Manifolded Tanks and Three Non-Manifolded Vapor Vent Lines (PDF Format - 192K) | |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor
Pump with One Three Inch Diameter Vapor Vent Line (PDF Format - 152K) |
|
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor
Pump with Three Manifolded Vapor Vent Lines (PDF Format - 189K) |
|
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor Pump with Remote Vapor Adapters and Three Manifolded Vapor Vent Lines (PDF Format - 196K) | |
| Typical Installation of the Healy Model 600 Phase I Vapor Recovery System with Franklin Electric VP-1000 Vapor
Pump with One Two Inch Diameter Vapor Vent Line (PDF Format - 137K) |
|
| Healy Model 600 Nozzle (PDF Format - 15K) | |
| Healy/Franklin Electric VP1000 Vapor Pump (PDF Format - 50K) |


