|
|
|
|
|
|
|
Executive Order G-70-186 |
|
This page updated October 26, 1998. |
| Executive Order G-70-186 |
| Certification of the Healy 400 ORVR Vacuum Assist Phase II Vapor Recovery System (PDF Format - 924K) |
| The above document is also available below in it's 27 subparts: |
| Legal Language (PDF Format 291K) | |
| Healy Model 400 ORVR Nozzle System Equipment List (PDF Format - 7K) | |
| Specifications for the Healy Model 400 ORVR Nozzle System (PDF Format - 32K) | |
|
|
| Healy 400 ORVR Nozzle (PDF Format - 47K) | |
| 9000-01 Mini-Jet Installation with Red Jacket Pump (PDF Format - 43K) | |
| 9000-01 Mini-Jet Installation with FE Petro Pump (PDF Format - 53K) | |
| 9000-02 Mini-Jet Installation with Red Jacket Pump (PDF Format - 44K) | |
| 9000-01 Mini-Jet Installation with Red Jacket Pump (Dedicated STP) (PDF Format |
|
| VP500 Central Vacuum Vane Pump (Typical Sump Installation) (PDF Format |
|
| Healy Monitoring System Layout (PDF Format - 35K) | |
| System Monitor Control Box (SMCB) (PDF Format - 42K) | |
| 6299 Intrinsically Safe Module (PDF Format - 27K) | |
| 93928 Vacuum Monitor Pressure Switch (PDF Format - 25K) | |
| Vent Piping Detail (PDF Format - 22K) | |
| Vent Manifold Assembly (PDF Format - 28K) | |
| 6275 System Monitor Vent Sensor (PDF Format - 22K) | |
| Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the Healy Model 9000 Mini-Jet
Pump with Two-Point Phase I System (PDF Format |
|
| Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 55K) | |
| Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 49K) | |
| Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 48K) | |
| Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K) | |
| Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K) | |
| Monitor Maintenance Log Sheet (PDF Format - 6K) | |
| Static Pressure Integrity Test Underground Storage Tanks, Table 3-1 and Form 3-1 (PDF Format - 109K) | |
| Vapor Return Line Vacuum Integrity Test for the Healy Model 400 ORVR System (PDF Format - 9K) | |
| Fillneck Vapor Pressure Regulation Fueling Test (PDF Format - 18K) | |
| Ten Gallon Per Minute Limitation Compliance Verification Procedure (PDF Format |
|
|
|