California Air Resources Board

California Air Resources Board

 

Executive Order G-70-186

This page updated October 26, 1998.

 

 
Executive Order G-70-186
Certification of the Healy 400 ORVR Vacuum Assist Phase II Vapor Recovery System (PDF Format - 924K)
 
The above document is also available below in it's 27 subparts:
 
Legal Language (PDF Format 291K)
Healy Model 400 ORVR Nozzle System Equipment List (PDF Format - 7K)
Specifications for the Healy Model 400 ORVR Nozzle System (PDF Format - 32K)
  • Exhibit 2 Figures
 
Healy 400 ORVR Nozzle (PDF Format - 47K)
9000-01 Mini-Jet Installation with Red Jacket Pump (PDF Format - 43K)
9000-01 Mini-Jet Installation with FE Petro Pump (PDF Format - 53K)
9000-02 Mini-Jet Installation with Red Jacket Pump (PDF Format - 44K)
9000-01 Mini-Jet Installation with Red Jacket Pump (Dedicated STP) (PDF Format   40K) 
VP500 Central Vacuum Vane Pump (Typical Sump Installation) (PDF Format   50K)
Healy Monitoring System Layout (PDF Format - 35K)
System Monitor Control Box (SMCB) (PDF Format - 42K)
6299 Intrinsically Safe Module  (PDF Format - 27K)
93928 Vacuum Monitor Pressure Switch (PDF Format - 25K)
Vent Piping Detail (PDF Format - 22K)
Vent Manifold Assembly  (PDF Format - 28K)
6275 System Monitor Vent Sensor (PDF Format - 22K)
Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the Healy Model 9000 Mini-Jet Pump with Two-Point Phase I System (PDF Format   54K) 
Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 55K)
Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 49K)
Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 48K)
Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K)
Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K)
Monitor Maintenance Log Sheet  (PDF Format - 6K)
Static Pressure Integrity Test Underground Storage Tanks, Table 3-1 and Form 3-1 (PDF Format - 109K)
Vapor Return Line Vacuum Integrity Test for the Healy Model 400 ORVR System (PDF Format - 9K)
Fillneck Vapor Pressure Regulation Fueling Test (PDF Format - 18K)
Ten Gallon Per Minute Limitation Compliance Verification Procedure (PDF Format   5K)     
   
 

Top of Page

Executive Orders

-----------------------
A Department of the California Environmental Protection Agency