Executive Order G-70-186

This page last reviewed April 27, 2016


Executive Order G-70-186

Certification of the Healy 400 ORVR Vacuum Assist Phase II Vapor Recovery System (PDF Format - 924K)

The above document is also available below in it's 27 subparts:


Legal Language Legal Language (PDF Format 291K)
Exhibit 1 Healy Model 400 ORVR Nozzle System Equipment List (PDF Format - 7K)
Exhibit 2 Specifications for the Healy Model 400 ORVR Nozzle System (PDF Format - 32K)
Exhibit 2 Figures
Figure 1 Healy 400 ORVR Nozzle (PDF Format - 47K)
Figure 2A 9000-01 Mini-Jet Installation with Red Jacket Pump (PDF Format - 43K)
Figure 2B 9000-01 Mini-Jet Installation with FE Petro Pump (PDF Format - 53K)
Figure 2C 9000-02 Mini-Jet Installation with Red Jacket Pump (PDF Format - 44K)
Figure 2D 9000-01 Mini-Jet Installation with Red Jacket Pump (Dedicated STP) (PDF Format 40K)
Figure 3 VP500 Central Vacuum Vane Pump (Typical Sump Installation) (PDF Format 50K)
Figure 4A Healy Monitoring System Layout (PDF Format - 35K)
Figure 4B System Monitor Control Box (SMCB) (PDF Format - 42K)
Figure 4C 6299 Intrinsically Safe Module (PDF Format - 27K)
Figure 4D 93928 Vacuum Monitor Pressure Switch (PDF Format - 25K)
Figure 4E Vent Piping Detail (PDF Format - 22K)
Figure 4F Vent Manifold Assembly (PDF Format - 28K)
Figure 4G 6275 System Monitor Vent Sensor (PDF Format - 22K)
Figure 5A Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the Healy Model 9000 Mini-Jet Pump with Two-Point Phase I System (PDF Format 54K)
Figure 5B Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 55K)
Figure 5C Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 49K)
Figure 5D Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 48K)
Figure 5E Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K)
Figure 5F Typical Installation of the Healy 400 ORVR Phase II Vapor Recovery System Utilizing the VP-500 Vane Pump with Two-Point Phase I System (PDF Format - 46K)
Figure 6 Monitor Maintenance Log Sheet (PDF Format - 6K)
Exhibit 3 Static Pressure Integrity Test Underground Storage Tanks, Table 3-1 and Form 3-1 (PDF Format - 109K)
Exhibit 4 Vapor Return Line Vacuum Integrity Test for the Healy Model 400 ORVR System (PDF Format - 9K)
Exhibit 5 Fillneck Vapor Pressure Regulation Fueling Test (PDF Format - 18K)
Exhibit 6 Ten Gallon Per Minute Limitation Compliance Verification Procedure (PDF Format - 5K)

preload