|
|
|
Executive Order G-70-188
This page updated May 18, 1999
| Executive Order G-70-188 |
| Certification of the Catlow ICVN Vapor Recovery Nozzle System for use with the Gilbarco VaporVac Vapor Recovery System (PDF Format 517K) |
| The above document is also available below in it's 15 subparts: |
| Legal Language (PDF Format 21K) | |
| Catlow ICVN/VaporVac System Equipment List (PDF Format 23K) | |
| Catlow ICVN Nozzle (PDF Format 13K) | |
| Proper Installation of the A/L Adaptor (PDF Format 13K) | |
| Specifications for the Catlow ICVN/VaporVac System (PDF Format 23K) | |
| Component Parts of the VaporVac System (PDF Format 43K) | |
| VaporVac Dispenser Types (PDF Format 135K) | |
| Typical Installation of the Catlow ICVN Nozzle with Specified Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 26K) | |
| Typical Installation of the Catlow ICVN Nozzle with Specified Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 23K) | |
| Typical Installation of the Catlow ICVN Nozzle with Specified Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 27K) | |
| Typical Installation of the Catlow ICVN Nozzle with Specified Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 27K) | |
| Typical Installation of the Catlow ICVN Nozzle with Specified Phase II Vapor Recovery System with Two-Point Phase I System (PDF Format 20K) | |
| Static Pressure Integrity Test Underground Storage Tanks, Table 3-1, and Form 3-1 (PDF Format 93K) | |
| Ten Gallon Per Minute Limitation Compliance Verification Procedure (PDF Format 5K) | |
| Notification Template to Prospective Customers and Owner/Operators (PDF Format 69K) |
|
Top of page |