1999-08-08 G-70-191 Healy Model 600 ORVR/800 Nozzle With H/F VP-1000 Vapor Pump Phase II VR System

This page last reviewed October 22, 2008



Executive Order G-70-191

 
Executive Order G-70-191
Certification of the Healy Model 600 ORVR/800Nozzle With The Healy/Franklin VP-1000 Vapor Pump Phase II Vapor Recovery System   (PDF Format - 482K)
 
The above document is also available below in its 13 subparts:

Legal Language (PDF Format - 49K)
Healy ORVR Phase II Vapor Recovery System Equipment List (PDF Format - 6K)
Healy ORVR Phase II Vapor Recovery System Specifications (PDF Format - 27K)
Static Pressure Integrity Test Underground Storage Tanks for Healy ORVR Phase II Vapor Recovery System (PDF Format - 107K)
Ten Gallon Per Minute Limitation Compliance Verification Procedure for Healy ORVR Phase II Vapor Recovery System (PDF Format - 5K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System
(PDF Format - 39K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System
(PDF Format - 34K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System
(PDF Format - 41K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System
(PDF Format - 40K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System
(PDF Format - 30K)
Healy ORVR Phase II Vapor Recovery System (PDF Format - 43K)
Healy/Franklin Electric VP-1000 Vapor Pump (PDF Format - 37K)
Healy A/L Adapter For 600 ORVR and 800 Nozzle Healy Part #8034
(PDF Format - 43K)


Executive Orders

preload