2001-07-30 G-70-191-AA Relating to Language Correction in Existing Executive Order G-70-191
|
Executive Order G-70-191-AA |
| Executive Order G-70-191-AA |
| Relating to Language Correction in Existing Executive Order G-70-191 (PDF Format - 610K) |
| The above document is also available below in its 12 subparts: |
| Legal Language (PDF Format - 233K) | |
| Equipment List (PDF Format - 8K) | |
| Specifications for the Healy ORVR Phase II Vapor Recovery System (PDF Format - 27K) | |
| Ten Gallon Per Minute Requirement (PDF Format - 6K) | |
| Typical Installation of the Healy ORVR Phase II Vapor Recovery System with Manifolded Tanks and Three Non-Manifolded Vapor Vent Lines (PDF Format - 196K) | |
| Typical Installation of the Healy ORVR Phase II Vapor Recovery System with One Three Inch Diameter Vapor Vent Line (PDF Format - 155K) | |
| Typical Installation of the Healy ORVR Phase II Vapor Recovery System with Three Manifolded Vapor Vent Lines (PDF Format - 193K) | |
| Typical Installation of the Healy ORVR Phase II Vapor Recovery System with Remote Vapor Adapters and Three Manifolded Vapor Vent Lines (PDF Format - 200K) | |
| Typical Installation of the Healy ORVR Phase II Vapor Recovery System with One Two Inch Diameter Vapor Vent Line (PDF Format - 139K) | |
| Healy Model 600 Nozzle and Healy Model 800 Nozzle (PDF Format - 34K) | |
| Healy/Franklin Electric VP1000 Vapor Pump (PDF Format - 51K) | |
| Healy A/L Adapter for 600 ORVR and 800 Nozzle (PDF Format - 1,136K) |


