2001-07-30 G-70-191-AA Relating to Language Correction in Existing Executive Order G-70-191

This page last reviewed October 22, 2008


Executive Order G-70-191-AA

 
Executive Order G-70-191-AA
Relating to Language Correction in Existing Executive Order G-70-191
(PDF Format - 610K)
 
The above document is also available below in its 12 subparts:

Legal Language (PDF Format - 233K)
Equipment List (PDF Format - 8K)
Specifications for the Healy ORVR Phase II Vapor Recovery System (PDF Format - 27K)
Ten Gallon Per Minute Requirement (PDF Format - 6K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System with Manifolded Tanks and Three Non-Manifolded Vapor Vent Lines (PDF Format - 196K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System with One Three Inch Diameter Vapor Vent Line (PDF Format - 155K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System with Three Manifolded Vapor Vent Lines (PDF Format - 193K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System with Remote Vapor Adapters and Three Manifolded Vapor Vent Lines (PDF Format - 200K)
Typical Installation of the Healy ORVR Phase II Vapor Recovery System with One Two Inch Diameter Vapor Vent Line (PDF Format - 139K)
Healy Model 600 Nozzle and Healy Model 800 Nozzle (PDF Format - 34K)
Healy/Franklin Electric VP1000 Vapor Pump (PDF Format - 51K)
Healy A/L Adapter for 600 ORVR and 800 Nozzle
(PDF Format - 1,136K)

preload