Executive Order G-70-196

This page last reviewed April 19, 2016


Executive Order G-70-196

Certification of the Saber Technologies, LLC SaberVac VR Phase II Vapor Recovery System (PDF Format 272K)

The above document is also available below in it's 11 subparts:


Legal Legal Language (Acrobat 9.6K)
Exhibt 1 Equipment List (Acrobat 5K)
Figure 1A Husky V1 Model 605104 (Acrobat 47K)
Figure 1B SaberVac(R) Vapor Pump (Acrobat 10K)
Exhibit 2 Specifications for the SaberVac VR Phase II Vapor Recovery System (Acrobat 16K)
Figure 2A-1 High-Hang Coaxial Hose Configuration With Liquid Removal System For New and Existing Installations [Single Hose Multi-product Dispensers Included] (Acrobat 17K)
Figure 2A-2 High-Hang Coaxial Hose Configuration With Retractor For New and Existing or New Installations [Single Hose Multi-product Dispensers Included] (Acrobat 30K)
Figure 2A-3 High-Retractor Dispenser New and Existing Installations [Single Hose Multi-product Dispensers Included] (Acrobat 41K)
Figure 2A-4 Coaxial Hose Side-Mount High-Retractor Configuration For New and Existing Installations (Acrobat 15K)
Figure 2B Instruction for Use of the A/L Adaptor (Acrobat 53K)
Exhibit 3 Ten Gallon Per Minute Requirement (Acrobat 5K)

preload