Executive Order VR-201-E

This page Last Revised January 18, 2008


Executive Order VR-201-E

Healy Phase II Enhanced Vapor Recovery (EVR) System Including In-Station Diagnostics (ISD)
System - Full VR-201-E Download [PDF - 2,697K]


Legal Document
Equipment List
System Specifications
Manufacturer Performance Standards and Specifications
Determination of Static Pressure Performance of the
Healy Clean Air Separator
Vapor to Liquid Volume Ratio for
Healy Phase II EVR System
Healy Phase II EVR Limited Warranty,
Veeder-Root Environmental Equipment
Warranty Policy, and FFS/INCON ISD System Warranty Policy
Nozzle Bag Test Procedure
Required Items in Conducting TP-201.3


Installation, Operation and Maintenance Manual (IOM)
Full IOM Download [PDF - 8MB]


Table of Contents
Healy Systems Scheduled Maintenance
Healy 900 Series Nozzle
Installation Instructions for Clean Air Separator
Healy Model 75 Series Inverted Coaxial Hoses
Healy Model CX6 Series Hose Adaptors
Healy Model 8701VV Breakaway
Healy Model 807 Swivel
Healy 1301 Flow Limiter
Healy 1302 Flow Limiter
Gilbarco Encore Dispenser
Gilbarco GasBoy Dispenser
Wayne Harmony Balance Dispenser
Wayne Harmony WayneVac Dispenser
Wayne Ovation Dispenser
Wayne Vista Balance Dispenser
Wayne Global Century, Reliance and Select Dispenser
Healy Universal Manual

Correspondence related to VR-201

April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law.

VP-1000 Design Improvements

September 18, 2007 Letter to Franklin Fueling Systems to implement VP-1000 design improvements.

The superseded version of the above document can be found by clicking on the link below:


preload