Vapor Recovery Certification Phase II EVR Executive Orders

Executive Order VR-201-M

This page last reviewed August 31, 2011

Healy Phase II Enhanced Vapor Recovery System
Modification Highlights

Executive Order VR-201-M

Full VR-201-M Download [ PDF - 5.04MB]
black bullet Legal Legal Document
black bullet Exhibit 1 Equipment List
black bullet Exhibit 2 System Specifications
black bullet Exhibit 3 Manufacturing Performance Standards and Specifications
black bullet Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator
black bullet Exhibit 5 Vapor to Liquid Volume Ratio
black bullet Exhibit 6 Healy Warranty
black bullet Exhibit 7 Nozzle Bag Test Procedure
black bullet Exhibit 8 Required Items in Conducting TP-201.3
black bullet Exhibit 9 Liquid Condensate Trap Compliance Test

Installation, Operation and Maintenance Manual (IOM)
Full IOM VR-201-M Download [PDF - 33.51MB]
black bullet IOM1 Table of Contents
black bullet IOM2 Healy Systems Scheduled Maintenance
black bullet IOM3 Healy 900 Series Nozzle
black bullet IOM4 Installation Instructions for Clean Air Separator
black bullet IOM5 Healy Model 75 Series Inverted Coaxial Hoses
black bullet IOM6 Healy Model CX6 Series Hose Adaptors
black bullet IOM7 Healy Model 8701VV Breakaway
black bullet IOM8 Healy Model 807 Swivel Breakaway
black bullet IOM9 Healy 1301 Flow Limiter
black bullet IOM10 Healy 1302 Flow Limiter
black bullet IOM11 Gilbarco Encore Dispenser
black bullet IOM12 Gilbarco GasBoy Dispenser
black bullet IOM13 Wayne Harmony Balance Dispenser
black bullet IOM14 Wayne Harmony WayneVac Dispenser
black bullet IOM15 Wayne Ovation Dispenser
black bullet IOM16 Wayne Vista Balance Dispenser
black bullet IOM17 Wayne Global Century, Reliance and Select Dispenser
black bullet IOM18 Healy Universal Manual
black bullet IOM19 Liquid Condensate Trap

New EasyGrip Reconnection Clamp
July 14, 2011 Letter to GA Ninety to use the EasyGrip reconnection clamp to reconnect the Healy 8701VV Breakaway

Modified Healy 795 Reconnection Clamp
June 22, 2011 Letter to Franklin Fueling Systems to implement design change to the Healy 795 Reconnection Clamp

ARB Letter
Franklin Fueling Systems Request for Spout Modification, New Spout Epoxy and Epoxy Curing Procedure.

900 EVR Nozzle and VP-1000 Design Modifications
January 23,2009 Letter to Franklin Fueling Systems to implement design changes to model 900 EVR nozzle and VP-1000 vacuum pump.

ARB Letter
Franklin Fueling Systems Request to Use New Vendor for Their Model 900 EVR Nozzle Casting

VP-1000 Design Improvements
September 18, 2007 Letter to Franklin Fueling Systems to implement VP-1000 design improvements.

Clean Air Separator Paint Colors
August 2, 2007 letter clarifying that the Healy Clean Air Separator may be painted any color.

Correspondence related to VR-201
April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law.


The superseded version of the above document can be found by clicking on the link below :
preload