Executive Order VR-202-E

This page last reviewed August 10, 2010


For Netscape users - hold SHIFT key and click the link for download
For Explorer users - right click the link and select "Save Target As..." for download or
Simply click the link to allow the PDF Reader to open the document within the browser

Executive Order VR-202-E

Healy Phase II Enhanced Vapor Recovery (EVR) System Including In-Station Diagnostics (ISD)
System - Full VR-202-E Download [PDF - 2,697K]

Legal Document
Equipment List
System Specifications
Manufacturer Performance Standards and Specifications
Determination of Static Pressure Performance of the
Healy Clean Air Separator
Vapor to Liquid Volume Ratio for
Healy Phase II EVR System
Healy Phase II EVR Limited Warranty,
Veeder-Root Environmental Equipment
Warranty Policy, and FFS/INCON ISD System Warranty Policy
Nozzle Bag Test Procedure
Required Items in Conducting TP-201.3
Veeder-Root ISD Operability Test
FFS INCON ISD Operability Test

Installation, Operation and Maintenance Manual (IOM)
Full IOM Download [PDF - 8MB]

Table of Contents
Healy Systems Scheduled Maintenance
Healy 900 Series Nozzle
Installation Instructions for Clean Air Separator
Healy Model 75 Series Inverted Coaxial Hoses
Healy Model CX6 Series Hose Adaptors
Healy Model 8701VV Breakaway
Healy Model 807 Swivel
Healy 1301 Flow Limiter
Healy 1302 Flow Limiter
Gilbarco Encore Dispenser
Gilbarco GasBoy Dispenser
Wayne Harmony Balance Dispenser
Wayne Harmony WayneVac Dispenser
Wayne Ovation Dispenser
Wayne Vista Balance Dispenser
Wayne Global Century, Reliance and Select Dispenser
Healy Universal Manual
Veeder-Root ISD Install, Setup, & Operation Manual
Veeder-Root ISD Vapor Flow Meter Installation Manual
Veeder-Root ISD Pressure Sensor Installation Guide
INCON Vapor Recovery Monitoring (VRM) Installation, Operation, & Maintenance Manual
INCON Vapor Flow Meter (VFM) Installation Guide
INCON Vapor Pressure Sensor (VPS) Installation Guide

Correspondence related to VR-202

April 29, 2005 letter to WSPA clarifying that the Healy Clean Air Separator is not an Aboveground Storage Tank under CA State Law.

VP-1000 Design Improvements
September 18, 2007 Letter to Franklin Fueling Systems to implement VP-1000 design improvements.

The superseded version of the above document can be found by clicking on the link below:


preload