|
|
|
|
|
Executive Order VR-202-K This page updated October 23, 2009 |
|
|
| For Netscape users - hold SHIFT key and click the link for download For Explorer users - right click the link and select "Save Target As..." for download or Simply click the link to allow the PDF Reader to open the document within the browser |
|
|
| Healy Phase II Enhanced Vapor Recovery System Modification Highlights Executive Order VR-202-K Full VR-202-K Download [ PDF - 8.6 MB ] |
| Legal Document | |
| Equipment List | |
| System Specifications | |
| Manufacturing Performance Standards and Specifications | |
| Determination of Static Pressure Performance of the Healy Clean Air Separator | |
| Vapor to Liquid Volume Ratio | |
| Healy Warranty | |
| Nozzle Bag Test Procedure | |
| Required Items in Conducting TP-201.3 | |
| Veeder-Root ISD Operability Test | |
| FFS INCON ISD Operability Test |
| Installation, Operation and Maintenance Manual (IOM) Full IOM VR-202-K Download [PDF - 20.8MB] |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|