Vapor Recovery Certification Phase II
EVR
Executive Orders
| |
|
Executive Order
VR-203-N
This
page last
updated February 19, 2013
|
| Modification
Highlights |
| Executive
Order VR-203-N |
Balance
Phase II Enhanced Vapor Recovery Systems Not-Including In-Station
Diagnostics (ISD)
Full VR-203-N Download [PDF - 10.10MB] |
|
|
|
Legal Document |
|
|
Equipment List |
|
|
System
Specifications |
|
|
Manufacturing
Performance
Specifications and Warranties |
|
|
Required
Items in Conducting TP-201.3 |
|
|
Liquid
Removal Test Procedure |
|
|
Required
Items for Conducting
TP-201.4 |
|
|
Nozzle Bag
Test Procedure |
|
|
VST ECS;
Hydrocarbon Sensor
Verification Test Procedure |
|
|
VST ECS;
Determination of Processor
Activation Pressure |
|
|
Veeder-Root;
Vapor Pressure Sensor Verification Test Procedure |
|
|
Veeder-Root
Vapor Polisher;
Operability Test Prodecure |
|
|
Veeder-Root
Vapor Polisher;
Hydrocarbon Emissions Verification Test Prodecure |
|
|
Hirt VCS 100
Processor; Operability
Test Procedure |
|
|
Franklin
Fueling Systems CAS; Static
Pressure Performance Test Procedure |
|
|
VST Green Machine Compliance Test
Procedure |
|
|
Liquid Condensate Trap Compliance
Test Procedure |
|
|
This Section left intentionally blank |
|
|
Veeder-Root Maintenance Tracker Security Feature |
| Installation, Operaton and
Maintenance Manual (IOM) |
| Full IOM
VR-203-N Download [PDF - 39.89MB] |
|
|
|
|
|
|
|
Contractor
Requirements |
|
|
Weekly Inspections |
|
|
Quarterly
and Annual Inspections |
|
|
Alarm
Troubleshooting Summary |
|
|
Drive-offs
and Other Customer Abuse |
|
|
Phase
II Coaxial Balance EVR
Dripless Nozzles |
|
|
Phase
II Coaxial EVR Nozzle Repair Kits |
|
|
Phase
II Coaxial EVR Balance Fuel
Hose |
|
|
Phase
II Coaxial EVR Balance Safety
Breakaway Device |
|
|
VST ECS
Membrane Processor:
Installation |
|
|
VST ECS
Membrane Processor:
Operation, Maintenance, & Start-Up |
|
|
VST ECS
Membrane Processor:
Veeder-Root Pressure Management Control |
|
|
Veeder-Root Vapor Pressure Sensor
Installation Guide |
|
|
Veeder-Root
Vapor Polisher:
Installation |
|
|
Veeder-Root
Vapor Polisher: Pressure
Management Control |
|
|
Hirt
VCS 100: Vapor Processor and
Indicator Panel |
|
|
Healy
Clean Air Separator:
Installation |
|
|
VST Green Machine Installation and
Maintenance Manual |
|
|
Veeder-Root
TLS RF Wireless 2 System: Installation and Maintenance Guide. |
|
|
Liquid Condensate Trap:
Installation, Operations, and Maintenance Manual |
|
|
Veeder-Root Vapor Pressure Sensor for Vent
Stack: Installation Guide |
|
|
September 22,
2010 Letter to Vapor Systems Technologies (VST) regarding the
addition of a hold-open latch release mechanism on the VST Enhanced Vapor Recovery (EVR)
nozzles.
August 24, 2010 Letter
to Vapor Systems Technologies (VST) regarding the removal of hold-open
latches on the VST Enhanced Vapor Recovery (EVR) nozzles.
December 11, 2007 Letter
to
Vapor Systems Technologies regarding installation of VST EVR Phase II
system without ISD at facilities with
throughputs greater than 600,000 gallons/year.
| |
|
The
superseded version of the above document can be found by clicking on
the link below:
|
Vapor
Homepage