Executive Order VR-203-A
This page last reviewed August 11, 2010
For Netscape users - hold SHIFT key and click the link for download
For Explorer users - right click the link and select "Save Target As..." for download or
Simply click the link to allow the PDF Reader to open the document within the browser
Executive Order VR-203-A
VST Phase II Enhanced Vapor Recovery System Not-Including In-Station Diagnostics (ISD)
Full VR-203-A Download [PDF - 1,117K]
| Legal Document | |
| Equipment List | |
| System Specifications | |
| VST Manufacturing Performance Standards and Specifications | |
| Required Items in Conducting TP-201.3 | |
| Liquid Removal Test Procedure | |
| Hydrocarbon Sensor Verification Test | |
| VST Phase II EVR System Warranty | |
| Vapor Pressure Sensor Verification Test | |
| Determination of VST Processor Activation Pressure | |
| Nozzle Bag Test Procedure |
Installation, Operaton and Maintenance Manual (IOM)
Full IOM VR-203-A Download [PDF - 11MB]
| About VST | |
| Table of Terms and Abbreviations | |
| Contractor Requirements | |
| System Components | |
| Overview EVR Balance Total System | |
| Daily Inspections | |
| Annual Inspections, Replacements, and Compliance Testing | |
| Alarm Troubleshooting Summary | |
| Drive-Offs and Customer Abuse | |
| Nozzle Installation | |
| Nozzle Repair Kit | |
| Hoses | |
| Breakaway Devices | |
| ECS Membrane Processor Installation | |
| ECS Membrane Processor OMS Manual | |
| Pressure Management Control Manual | |
| Pressure Sensor Installation Guide |
VST Hanging Hardware Compatibility Approval Letter #07-09
November 27, 2007 letter to Vapor Systems Technologies approving VST's
EVR hanging hardward as replacement components on Pre-EVR balance vapor recovery systems.
December 11, 2007 letter to Vapor Systems Technologies regarding
installation of VST EVR Phase II system without ISD at facilities with throughputs greater than 600,000 gallons/year.


