Vapor Recovery Certification Phase II EVR Executive Orders

 

Executive Order VR-203-K

This page last updated June 29, 2011



Modification Highlights
Executive Order VR-203-K
VST Phase II Enhanced Vapor Recovery System Not-Including In-Station Diagnostics (ISD)
Full VR-203-K Download [PDF - 5.5MB]

Legal Document
Equipment List
System Specifications
Manufacturing Performance Specifications and Warranties
Required Items in Conducting TP-201.3
Liquid Removal Test Procedure
Required Items for Conducting TP-201.4
Nozzle Bag Test Procedure
VST ECS; Hydrocarbon Sensor Verification Test Procedure
VST ECS; Determination of Processor Activation Pressure
Veeder-Root; Vapor Pressure Sensor Verification Test Procedure
Veeder-Root Vapor Polisher; Operability Test Prodecure
Veeder-Root Vapor Polisher; Hydrocarbon Emissions Verification Test Prodecure
Hirt VCS 100 Processor; Operability Test Procedure
Franklin Fueling Systems CAS; Static Pressure Performance Test Procedure
  • Exhibit 15
This Section left intentionally blank
Liquid Condensate Trap Compliance Test Procedure

Installation, Operaton and Maintenance Manual (IOM)
Full IOM VR-203-K Download [PDF - 32.4MB]

Contractor Requirements
Daily and Weekly Inspections
Quarterly and Annual Inspections
Alarm Troubleshooting Summary
Drive-offs and Other Customer Abuse
Phase II Coaxial Balance EVR Dripless Nozzles
Phase II Coaxial EVR Nozzle Repair Kits
Phase II Coaxial EVR Balance Fuel Hose
Phase II Coaxial EVR Balance Safety Breakaway Device
VST ECS Membrane Processor: Installation
VST ECS Membrane Processor: Operation, Maintenance, & Start-Up
VST ECS Membrane Processor: Veeder-Root Pressure Management Control
VST ECS Membrane Processor /Veeder-Root Vapor Polisher: Pressure Sensor Installation Guide
Veeder-Root Vapor Polisher: Installation
Veeder-Root Vapor Polisher: Pressure Management Control
Hirt VCS 100: Vapor Processor and Indicator Panel
Healy Clean Air Separator: Installation
  • Section 18
This section left intentionally blank
Veeder-Root TLS RF Wireless 2 System: Installation and Maintenance Guide.
Liquid Condensate Trap: Installation, Operations, and Maintenance Manual

September 22, 2010 Letter to Vapor Systems Technologies (VST) regarding the addition of a hold-open latch release mechanism on the VST Enhanced Vapor Recovery (EVR) nozzles.


August 24, 2010 Letter to Vapor Systems Technologies (VST) regarding the removal of hold-open latches on the VST Enhanced Vapor Recovery (EVR) nozzles.

December 11, 2007 Letter to Vapor Systems Technologies regarding installation of VST EVR Phase II system without ISD at facilities with throughputs greater than 600,000 gallons/year.


 

The superseded version of the above document can be found by clicking on the link below:

 

Vapor Homepage