Vapor Recovery Certification Phase II
EVR
Executive Orders
| |
|
Executive Order
VR-203-M
This
page last
updated April 12, 2012
|
| Executive
Order VR-203-M |
VST
Phase II Enhanced Vapor Recovery System Not-Including In-Station
Diagnostics (ISD)
Full VR-203-M Download [PDF - 5.9MB] |
|
|
|
Legal Document |
|
|
Equipment List |
|
|
System
Specifications |
|
|
Manufacturing
Performance
Specifications and Warranties |
|
|
Required
Items in Conducting TP-201.3 |
|
|
Liquid
Removal Test Procedure |
|
|
Required
Items for Conducting
TP-201.4 |
|
|
Nozzle Bag
Test Procedure |
|
|
VST ECS;
Hydrocarbon Sensor
Verification Test Procedure |
|
|
VST ECS;
Determination of Processor
Activation Pressure |
|
|
Veeder-Root;
Vapor Pressure Sensor Verification Test Procedure |
|
|
Veeder-Root
Vapor Polisher;
Operability Test Prodecure |
|
|
Veeder-Root
Vapor Polisher;
Hydrocarbon Emissions Verification Test Prodecure |
|
|
Hirt VCS 100
Processor; Operability
Test Procedure |
|
|
Franklin
Fueling Systems CAS; Static
Pressure Performance Test Procedure |
|
|
This Section left intentionally blank |
|
|
Liquid Condensate Trap Compliance
Test Procedure |
|
|
|
|
| Installation, Operaton and
Maintenance Manual (IOM) |
| Full IOM
VR-203-M Download [PDF - 33.3MB] |
|
|
|
|
|
|
|
Contractor
Requirements |
|
|
Weekly Inspections |
|
|
Quarterly
and Annual Inspections |
|
|
Alarm
Troubleshooting Summary |
|
|
Drive-offs
and Other Customer Abuse |
|
|
Phase
II Coaxial Balance EVR
Dripless Nozzles |
|
|
Phase
II Coaxial EVR Nozzle Repair Kits |
|
|
Phase
II Coaxial EVR Balance Fuel
Hose |
|
|
Phase
II Coaxial EVR Balance Safety
Breakaway Device |
|
|
VST ECS
Membrane Processor:
Installation |
|
|
VST ECS
Membrane Processor:
Operation, Maintenance, & Start-Up |
|
|
VST ECS
Membrane Processor:
Veeder-Root Pressure Management Control |
|
|
VST ECS
Membrane Processor
/Veeder-Root Vapor Polisher: Pressure Sensor Installation Guide |
|
|
Veeder-Root
Vapor Polisher:
Installation |
|
|
Veeder-Root
Vapor Polisher: Pressure
Management Control |
|
|
Hirt
VCS 100: Vapor Processor and
Indicator Panel |
|
|
Healy
Clean Air Separator:
Installation |
|
|
This
section left intentionally blank |
|
|
Veeder-Root
TLS RF Wireless 2 System: Installation and Maintenance Guide. |
|
|
Liquid Condensate Trap:
Installation, Operations, and Maintenance Manual |
|
|
September 22,
2010 Letter to Vapor Systems Technologies (VST) regarding the
addition of a hold-open latch release mechanism on the VST Enhanced Vapor Recovery (EVR)
nozzles.
August 24, 2010 Letter
to Vapor Systems Technologies (VST) regarding the removal of hold-open
latches on the VST Enhanced Vapor Recovery (EVR) nozzles.
December 11, 2007 Letter
to
Vapor Systems Technologies regarding installation of VST EVR Phase II
system without ISD at facilities with
throughputs greater than 600,000 gallons/year.
| |
|
The
superseded version of the above document can be found by clicking on
the link below:
|
Vapor
Homepage