Vapor Recovery Certification Phase II EVR Executive Orders

 

Executive Order VR-204-H

This page last updated September 27, 2010



Modification Highlights
Executive Order VR-204-H
VST Phase II Enhanced Vapor Recovery System Including In-Station Diagnostics (ISD)
Full VR-204-H Download [PDF - 2.8MB]

Legal Document
Equipment List
System Specifications
Manufacturing Performance Specifications and Warranties
Required Items in Conducting TP-201.3
Liquid Removal Test Procedure
Required Items For Conducting TP-201.4
Nozzle Bag Test Procedure
VST ECS; Hydrocarbon Sensor Verification Test Procedure
VST ECS; Determination of Processor Activation Pressure
VST ECS / Veeder-Root Vapor Polisher; Vapor Pressure Sensor Verification Test Prodecure
Veeder-Root Vapor Polisher; Operability Test Procedure
Veeder-Root Vapor Polisher; Hydrocarbon Emissions Verification Test Prodecure
  • Exhibit 13
This Section left intentionally blank
  • Exhibit 14
This Section left intentionally blank
  • Exhibit 15
This Section left intentionally blank
  • Exhibit 16
This Section left intentionally blank
Veeder-Root; ISD Vapor Flow Meter Operability Test Procedure

Installation, Operaton and Maintenance Manual (IOM)
Full IOM VR-204-H Download [PDF - 27.2MB]

Contractor Requirements
Daily and Weekly Inspections
Annual Inspections
Alarm Troubleshooting Summary
Drive-offs and Other Customer Abuse
Phase II Coaxial Balance EVR Dripless Nozzles
Phase II Coaxial EVR Nozzle Front-End Kits
Phase II Coaxial EVR Balance Fuel Hose
Phase II Coaxial EVR Balance Safety Breakaway Device
VST ECS Membrane Processor: Installation
VST ECS Membrane Processor: Operation, Maintenance, & Start-Up
Veeder-Root: ISD Installation Manual
Veeder-Root ISD/ VST ECS Membrane Processor/ Veeder-Root Vapor Polisher:
Pressure Sensor Installation Guide
Veeder-Root Vapor Polisher: Installation
Veeder-Root ISD: Flow Meter Installation Guide

The superseded version of the above document can be found by clicking on the link below:

September 22, 2010 Letter to Vapor Systems Technologies (VST) regarding the addition of a hold-open latch release mechanism on the VST Enhanced Vapor Recovery (EVR) nozzles.

August 24, 2010 Letter to Vapor Systems Technologies (VST) regarding the removal of hold-open latches on the VST Enhanced Vapor Recovery (EVR) nozzles.

VST Hanging Hardware Compatibility Approval Letter #07-09
November 27, 2007 letter to Vapor Systems Technologies approving VST's
EVR hanging hardward as replacement components on Pre-EVR balance vapor recovery systems.

 

Vapor Homepage