Executive Order: 2009-05-07 VR-205-B* VST Phase II Enhanced Vapor Recovery (EVR) System Not-Including In-Station Diagnostics (ISD)

This page last reviewed November 9, 2011

Executive Order VR-205-B

VST Phase II Enhanced Vapor Recovery System with HIRT VCS 100 Thermal Oxidizer Not-Including In-Station Diagnostics (ISD)
Full VR-205-B Download [PDF - 1.6MB]

Legal Document
Equipment List
System Specifications
Performance Standards and Specifications
Required Items in Conducting TP-201.3
Liquid Removal Test Procedure
Required Items in Conducting TP-201.4
Nozzle Bag Test Procedure
HIRT VCS 100 Processor with Indicator Panel Operability Test Procedure
Warranty

Installation, Operaton and Maintenance Manual (IOM)

Full IOM VR-205-B Download [PDF - 1.9MB]

About VST
Table of Terms and Abbreviations
Contractor Requirements
System Components
Overview EVR Balance Total System
Daily Inspections
Annual Inspections
Alarm Troubleshooting Summary
Drive-Offs and Customer Abuse
Nozzle Installation
Nozzle Repair Kit
Hoses
Breakaway Devices
Hirt VCS 100 Vapor Processor and Indicator Panel

Modification Highlights

* Executive Order VR-205-B issued on July 2, 2009 is superseded by Executive Order VR-203-H or subsequent revisions. 
VST Phase II EVR Systems certified under Executive Order VR-205-A through B may remain in use at existing installations up to four years after the expiration date of the Executive Order.

September 22, 2010 Letter to Vapor Systems Technologies (VST) regarding the addition of a hold-open latch release mechanism on the VST Enhanced Vapor Recovery (EVR) nozzles.

August 24, 2010 Letter to Vapor Systems Technologies (VST) regarding the removal of hold-open latches on the VST Enhanced Vapor Recovery (EVR) nozzles.

October 14, 2009 Letter to Hirt Combustion Engineers to clarify placement of the Hirt Indicator Panel in Exhibit 2.

VST Hanging Hardware Compatibility Approval Letter #07-09 November 27, 2007 letter to Vapor Systems Technologies approving VST's EVR hanging hardward as replacement components on Pre-EVR balance vapor recovery systems.

December 11, 2007 letter to Vapor Systems Technologies regarding installation of VST EVR Phase II system without ISD at facilities with throughputs greater than 600,000 gallons/year.

The superseded version of the above document can be found by clicking on the link below:


preload