Executive Order: 2009-05-07 VR-205-A VST Phase II Enhanced Vapor Recovery (EVR) System Not-Including In-Station Diagnostics (ISD)
This page last reviewed August 11, 2010
For Netscape users - hold SHIFT key and click the link for download
For Explorer users - right click the link and select "Save Target As..." for download or
Simply click the link to allow the PDF Reader to open the document within the browser
Executive Order VR-205-A
VST Phase II Enhanced Vapor Recovery System with HIRT VCS 100 Thermal Oxidizer Not-Including
In-Station Diagnostics (ISD)
Full VR-205-A Download [PDF - 1.6MB]
| Legal Document | |
| Equipment List | |
| System Specifications | |
| Performance Standards and Specifications | |
| Required Items in Conducting TP-201.3 | |
| Liquid Removal Test Procedure | |
| Required Items in Conducting TP-201.4 | |
| Nozzle Bag Test Procedure | |
| HIRT VCS 100 Processor with Indicator Panel Operability Test Procedure | |
| Warranty |
Installation, Operaton and Maintenance Manual (IOM)
Full IOM VR-205-A Download [PDF - 1.8MB]
| About VST | |
| Table of Terms and Abbreviations | |
| Contractor Requirements | |
| System Components | |
| Overview EVR Balance Total System | |
| Daily Inspections | |
| Annual Inspections | |
| Alarm Troubleshooting Summary | |
| Drive-Offs and Customer Abuse | |
| Nozzle Installation | |
| Nozzle Repair Kit | |
| Hoses | |
| Breakaway Devices | |
| Hirt VCS 100 Vapor Processor and Indicator Panel |
VST Hanging Hardware Compatibility Approval Letter #07-09
November 27, 2007 letter to Vapor Systems Technologies approving VST's
EVR hanging hardward as replacement components on Pre-EVR balance vapor recovery systems.
December 11, 2007 letter to Vapor Systems Technologies regarding installation of VST EVR Phase II system without ISD at facilities with throughputs greater than 600,000 gallons/year.