|
Proposed Changes to Vapor Recovery
Certification and Test Procedures
|
| |
|
Procedure
|
Release Date
|
Staff Contact
|
|
D-200 - Definitions for Vapor Recovery
Procedures
|
August 23, 2002
|
Cindy Castronovo
(916) 322-8957
ccastron@arb.ca.gov
|
|
CP-201 - Certification Procedure for
Vapor Recovery Gasoline Dispensing Facilities
|
September 6, 2002
|
Laura McKinney
(All except ISD)
(916) 327-0900
lmckinne@arb.ca.gov
|
|
CP-201 ISD Appendix
|
September 6, 2002
|
Joe Guerrero (ISD)
(916) 324-9487
jguerrer@arb.ca.gov
|
|
TP-201.1 - Volumetric Efficiency of
Phase I Vapor Recovery Systems
|
August 23, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
TP-201.1B - Static Torque of Rotatable
Phase I Adaptors
|
August 23, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
TP-201.1C Leak Rate of Drop Tube/Drain
Valve Assembly
|
August 23, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
TP-201.1D Leak Rate of Drop Tube
Overfill Prevention Device
|
August 23, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
TP-201.1E (New) - Leak Rate Measurement
of Pressure-Vacuum Vent Valves
|
August 23, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
TP-201.2B Flow and Pressure Measurement
of Vapor Recovery Equipment
|
August 23, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
TP-201.2D - Post-Fueling Drips from
Nozzle Spouts
|
August 30, 2002
|
Neil Nipper
(916) 445-9391
rnipper@arb.ca.gov
|
|
TP-201.2F Pressure Related Fugitive
Emissions
|
August 30, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
TP-201.2G (New) - Bend Radius Determination
for Underground Storage Tank Vapor Return Piping
|
August 23, 2002
|
Paul Thalken
(916) 445-9499
pthalken@arb.ca.gov
|
|
TP-201.2I (New) - Procedures for
Evaluating ISD Systems
|
September 6, 2002
|
Joe Guerrero (ISD)
(916) 324-9487
jguerrer@arb.ca.gov
|
|
TP-201.2J (New) Bench Testing to
Determine Pressure Drop of Components
|
August 23, 2002
|
Jim Watson
(916) 327-1282
jwatson@arb.ca.gov
|
|
TP-201.7 (New) - Equipment for Measuring
Storage Tank Pressure
|
August 23, 2002
|
Joe Fischer
(916) 322-8914
jofische@arb.ca.gov
|
|
Revised EVR Technology Review
Report
|
September 6, 2002
|
Cindy Castronovo
(916) 322-8957
ccastron@arb.ca.gov
|