What's
New:
Approval
Letter #03-13-B Approval letter
changes the manufactures name from Rapac Network International, Inc. to
ORPAK USA, Inc. In addition, allows the use of ORPAKL USA, Inc.
Nozzle Reader (part #800939110) with the Healy Model 900
and the VST Model VST-EVR-NB vapor recovery nozzles.
Executive
Order VR-203-G and VR-204-G
VST Phase II EVR System
Approval
Letter #04-02-B
Approval letter was modified to reference Syn-Tech Systems Inc. for
recommended RF/ID Tag installation instructions.
Advisory
#412
Veeder-Root In-Station Diagnostic Electronic Access Availability of an
RS-232 Port Definition
Cover
Letter and Executive Order G-70-213-B
Modification of operative dates relating to the finding that EVR Phase
I, Phase II vapor recovery systems, and In-station Diagnostics (ISD)
are not commercially available for use with Aboveground Storage Tanks
(AST)
Percent
of gasoline dispensed to vehicles with On-Board Vapor Recovery.
ARB staff projected the fraction of total gasoline that is dispensed to
vehicles with
On-Board Vapor Recovery systems in 2009 and in future years.
Executive
Order VR-201-L and VR-202-L
Healy Phase II EVR System
2009
Vehicle Test Matrices
Included is the 200 vehicle matrix used by ARB staff for conducting
efficiency tests for vapor recovery systems.
Executive
Order VR-301-B
Standing Loss Control Vapor Recovery System for Existing Installations
of Aboveground Storage Tanks (AST) amended to include ConVault
protected AST.
Executive
Order VR-302-B
Standing Loss Control Vapor Recovery System for New Installations
of Aboveground Storage Tanks (AST) amended to include ConVault
protected AST.
Replacement Parts for Pre-EVR balance systems,
Advisory #408
VST, EMCO Wheaton, and Goodyear Phase II EVR components are approved as
replacement for pre-EVR balance systems.
Approval
Letter #09-10
The EMCO Wheaton EVR nozzle, safe break valve and hose swivel are
approved replacement components for pre-EVR balance systems.
Executive Order VR-209-A
VST Phase II EVR System with FFS Clean Air Separator Not Including ISD.
ARB
Letter
Frankling Fueling Systems Request for Spout Modification, New Spout
Epoxy, and Epoxy Curing Procedure
Letter
for Executive Orders VR-205, VR-207, and VR-208
Clarification of the Hirt Indicator Panel
Special
EVR Advisory 405
District Enforcement of ISD Transient Alarms and ISD Overpressure
Alarms
Executive Order VR-102-K
OPW Phase I EVR System
Executive Order VR-103-E
EBW Phase I EVR System
Executive Order VR-104-E
CNI Manufacturing Phase I EVR System
Executive Order VR-105-C
EMCO Wheaton Retail Phase I EVR System
Executive
Order VR-207-A
EMCO Wheaton Retail Phase II EVR System
Executive
Order VR-208-A
EMCO Wheaton Retail Phase II EVR System Including ISD System
Executive Order VR-101-L
Phil-Tite Phase I EVR System
EVR
Enforcement Advisory 402
Information on how air districts will enforce September 1, 2009
In-Station Diagnostics deadline.
Approval Letter
#06-03a
Amended Trak Engineering, Inc. Radio Nozzle Pickup Approved for use
with the Healy Model 900, VST Model VST-EVR-NB and Emco-Wheaton A4005
Series Phase II Vapor Recovery Nozzle
Approval Letter
#08-03c
Roseman Engineering, LTD. Passive Nozzle Tag, also known as the MAXIMUS
and AssetWorks FuelFocus Passive Nozzle Tag Approved for use with
Listed Phase II Balance Vapor Recovery Nozzles
Executive
Order VR-205-B
Revision to the VST Phase II EVR System with HIRT VCS 100 Thermal
Oxidizer not Including In-Station Diagnostics.
Approval
Letter #09-02
As of June 15, 2009, only enhanced vapor recovery (EVR) Phase II
components are approved replacement components for balance Phase II
vapor recovery systems. This approval letter rescinds Approval Letter
#09-01, which temporarily allowed the use of Pre-EVR Phase II
Balance components.
Certification
and Test Procedures for AST
Certification and Test Procedures CP-206, TP-206.1, TP-206.2, and
TP-206.3 have been adopted. D-200 and TP-201.2 have been updated.
Executive Order VR-102-J
OPW Phase I EVR
system
TriTester Use for Executive Order VR-204-C
Letter to Triangle Environmental, Inc. regarding TriTester use for
Exhibit 11of Executive Order VR-204-C. Note: This is
applicable to Exhibit 13 of Executive Order VR-204-D and
sequent.
EVR
Enforcement Advisory 385
Information on how air districts will enforce April 1, 2009 EVR Phase
II deadline.
Cover Letter and Executive Order G-70-213
Modification of Operative Dates Relating to the Finding that EVR
Standing Loss Control Phase I, Phase II Vapor Recovery Systems, and
In-Station Diagnostics (ISD) Are Not Commercially Available for Use
with Aboveground Storage Tanks (AST)
November
2008 Report: Progress Towards April 2009 Deadline for Enhanced Vapor
Recovery Phase II Systems
In-Station Diagnostic Evaluation Field Study Report
Comments due December 1, 2008 to Fred
Medina
Draft
Report October 31, 2008
Appendices
for Report
Approval
Letter #08-04a
Husky Model 5885 P/V vent valve will be the required replacement valve
beginning October 1, 2008
Executive Orders VR-201-H
and VR-202-H
Summary
of Revision H Changes
Proposed
Operator Actions for Veeder-Root ISD Alarms
Comment Period Extended to September 3, 2008
Executive
Order G-70-212
Extends the EVR Phase II deadline for E85 Dispensers
ARB Study of ORVR Vehicle Emissions
Measurement of
Gasoline Vapor Emissions from Vehicles Equipped with On-Board Vapor
Recovery, July, 2008
Appendices for Report
2007
ISD Cost Analysis Report
Modification Highlights
Executive Order VR-105-B (EMCO Wheaton)
Modification Highlights
Executive Order VR-104-D (CNI)
Modification Highlights
Executive Order VR-103-D (EBW)
Modification Highlights
Executive Order VR-102-I (OPW)
Executive
Order VR-202-G
Healy Phase II EVR System Including ISD
Executive
Order VR-201-G
Healy Phase II EVR System
Executive Order VR-203-C
VST Phase II EVR System Without ISD
Executive Order VR-204-C
VST Phase II EVR System Including ISD
Executive
Order VR-101-K
Phil-Tite Phase I Vapor Recovery System
Hanging Hardware Replacement Parts for
Balance Systems
Approval
Letter
Advisory
374
Executive
Order VR-101-J
Phil-Tite Phase I Vapor Recovery System
Executive Orders G-70-210 and G-70-211
Modification of Operative and Effective Dates for Enhanced Vapor
Recovery (EVR) Phase II and In-Station Diagnostics on Gasoline
Dispensing Facilities with Liquid Condensate Traps and/or Bulk Plants.
EVR Progress Report Presentation at June Board Meeting
May 14, 2008 EVR Meeting in Sacramento
Presentation
Meeting Notice
Meeting Agenda
Parking Map
Progress Towards April 2009 Deadline for
EVR Phase II Systems
Staff
Report
Appendices
April 22, 2008 Sacramento County EVR
Permitting Workshop
Workshop
Notice
Workshop
Agenda
ARB Letter
Franklin Fueling Systems Request to Use New Vendor for Their Model 900
EVR Nozzle Casting
Advisory 373
Enhanced Vapor Recovery Phase II System Update and Penalties for April
2009 Deadline
April 2 EVR Outreach in City of Riverside
Meeting Notice
Meeting Agenda
ARB Letter
Encouraging Air Districts to Adopt Phase II Vapor Recovery Exemptions
for ORVR Fleets and E85 Dispensing
Presentation
from February 14, 2008 SCAQMD EVR Conference Now Available
Advisory 372
Enhanced Vapor Recovery Phase II System Update
December 11, 2007 Letter to VST
Guidance regarding installation of VST EVR Phase II system without ISD
at facilities with gasoline annual throughputs exceeding 600,000
gallons/year
New EVR Website for Local Permit Agencies
go to www.evrhome.org
Approval Letter #07-09
VST Phase II EVR Hanging Hardware Compatibility Approval for Pre-EVR
Vapor Recovery Systems
Approval Letter #07-08
Catlow CTMVA Cam Twist Breakaway Approval
December 5, 2007 EVR/ISD Public
Information Meeting in San Diego
Meeting Notice
Meeting Agenda
ARB
Presentation
Approval Letter #07-07
Hill-Vac Vapor Recovery System for Cargo Tank Motor Vehicle Fueling
System Approval
Approval Letter #07-06
Innovative Petroleum Product (IPP) Semi-Rigid Piping
Advisory 359
April 2009 EVR Phase II System Deadline
Recommended ISD
Enforcement Policy
|