REGULATION 11

HAZARDOUS POLLUTANTS

RULE 16

PERCHLOROETHYLENE AND SYNTHETIC SOLVENT

DRY CLEANING OPERATIONS

(Adopted December 21, 1994)

11-16-100 GENERAL

11-16-200 DEFINITIONS

11-16-300 STANDARDS

11-16-400 ADMINISTRATIVE REQUIREMENTS

11-16-500 MONITORING AND RECORDS

11-16-600 MANUAL OF PROCEDURES

11-16-604 Analysis of Solvent Content of Water Repellent Solution and Other Liquid Materials: Samples of water repelling solution as specified in subsection 308.1, samples of waste or other liquid materials shall be analyzed as prescribed in the Manual of Procedures, Volume III, Method 37.

11-16-605 Determination of Cancer Risk: Determination of cancer risk for subsections 301.5 and 302.2.1 shall be conducted using the District's Risk Management Policy for Dry Cleaners (Manual of Procedures, Volume II, Chapter 6, Appendix A).


TABLE 11-16-1. EQUIPMENT REQUIREMENTS AND DATES OF COMPLIANCE FOR REGULATION 11, RULE 16

Column 1 Column 2 Column 3 Column 4 Column 5 Column 6 Column 7 Column 8

Facility Type
Required Dry Cleaning Equipment
Equipment Required by:

Complete Application for Authority to Construct By:

Initial Notification By:

Recordkeeping and Annual Reporting Starting:
Leak check and Repair; Operation and Maintenance Requirements Starting:
Environmental Training Requirements By:
Existing Non-residential Facility (Option 1) Converted Closed-loop Machine, possible Ventilation & Fugitive Control* April 1, 1996 October 1, 1995

(prior to construction)
December 21, 1994 December 21, 1994 December 21, 1994 April 1, 1996
Existing Non-Residential Facility (Option 2) Closed-loop Machine or secondary control, Possible Ventilation & Fugitive Control* October 1, 1998 April 1, 1998

(prior to construction)
December 21, 1994 December 21, 1994 December 21, 1994 April 1, 1996
Relocated Non-residential Facility Closed-loop or Converted Machine; Possible Ventilation & Fugitive Control* Upon commencement of operation Prior to construction Upon application for Authority to Construct Upon commencement of operation Upon commencement of operation Three months after commencement of operation
New Non-residential Facility Closed-loop Machine with Secondary Control; Possible Ventilation & Fugitive Control* Upon commencement of operation Prior to construction Upon application for Authority to Construct Upon commencement of operation Upon commencement of operation Three months after commencement of operation
Existing Co-residential facility; closed-loop machine Closed-loop Machine with choice of Secondary Control or Fugitive Control System; Vapor Barrier Room & Ventilation System; April 1, 1997 October 1, 1996

(prior to construction)
December 21, 1994 December 21, 1994 December 21, 1994 April 1, 1996
Existing Co-residential facility; Non-closed-loop machine Closed-loop Machine with Secondary Control; Vapor Barrier Room & Ventilation System; April 1, 1997 October 1, 1996

(prior to construction)
December 21, 1994 December 21, 1994 December 21, 1994 April 1, 1996
New Co-residential Facility Closed-loop Machine with Secondary Control; Vapor Barrier Room & Ventilation System; Upon commencement of operation Prior to construction Upon application for Authority to Construct Upon commencement of operation Upon commencement of operation Three months after commencement of operation

*Ventilation required unless risk is less than 10 in a million for new facility, relocated facility, additional machine, or increase in perc usage or 100 in a million for existing facility.

Fugitive control system possible risk reduction measure and optional component of ventilation system.