Each permit shall be assessed an initial permit fee according to the following applicable schedule. It is hereby determined that the cost of issuing permits, and of inspections pertaining to such issuance exceeds the fees prescribed herein. In the event that more than one fee schedule is applicable to an initial permit fee or annual permit renewal fee, the governing schedule shall be that which results in the higher fee.

SCHEDULE I

ELECTRIC MOTOR HORSEPOWER SCHEDULE

Any article, machine, equipment or other contrivance where an electric motor is used as the power supply shall be assessed a permit fee based on the total rated motor horsepower of all such electric motors included in any such article, machine, equipment or other contrivance, in accordance with the following schedule:

HORSEPOWER

AUTHORITY TO CONSTRUCT

INITIAL PERMIT FEE

ANNUAL PERMIT RENEWAL FEE

up to and including 5

$ 70.00

$ 35.00

greater than 5 but less than 15

$ 135.00

$ 70.00

15 or greater but less than 45

$ 275.00

$ 90.00

45 or greater but less than 65

$ 695.00

$205.00

65 or greater but less than 125

$1100.00

$240.00

125 or greater but less than 200

$1455.00

$290.00

200 or greater but less than 400

$1850.00

$420.00

400 or greater

$2530.00

$690.00

SCHEDULE 2

FUEL BURNING EQUIPMENT SCHEDULE

Any article, machine, equipment or other contrivance in which fuel is burned, with the exception of incinerators which are covered in Schedule 4, shall be assessed a permit fee based upon the design fuel consumption of the article, machine, equipment or other contrivance expressed in thousands of British Thermal Units (BTU) per hours, using gross heating values of the fuel, in accordance with the following schedule:

1000 BRITISH THERMAL

UNITS PER HOUR

AUTHORITY TO CONSTRUCT

INITIAL PERMIT FEE

ANNUAL PERMIT RENEWAL FEE

up to and including 150

$ 70.00

$ 35.00

greater than 150 but less than 400

$ 135.00

$ 70.00

400 or greater but less than 650

$ 275.00

$ 70.00

650 or greater but less than 1500

$ 695.00

$ 205.00

1500 or greater but less than 5000

$1100.00

$ 275.00

5,000 or greater but less than 15,000

$1455.00

$ 415.00

15,000 or greater but less than 50,000

$1850.00

$ 690.00

50,000 or greater but less than 100,000

$2645.00

$1190.00

100,000 or greater but less than 200,000

$3795.00

$1985.00

200,000 or greater

$5060.00

$2645.00

SCHEDULE 3

ELECTRICAL ENERGY SCHEDULE

Any article, machine, equipment or other contrivance which uses electrical energy, with the exception of electric motors covered in Schedule 1, shall be assessed a permit fee based on the total kilovolt ampere (KVA) ratings, in accordance with the following schedule:

KILOVOLT AMPERE

AUTHORITY TO CONSTRUCT

INITIAL PERMIT FEE

ANNUAL PERMIT RENEWAL FEE

up to and including 20

$ 70.00

$ 40.00

greater than 20 but less than 40

$ 135.00

$ 70.00

40 or greater but less than 145

$ 275.00

$ 70.00

145 or greater but less than 450

$ 695.00

$ 205.00

450 or greater but less than 4,500

$1100.00

$ 205.00

4,500 or greater but less than 14,500

$1455.00

$ 415.00

14,500 or greater but less than 45,000

$1850.00

$ 415.00

45,000 or greater

$2645.00

$ 690.00

SCHEDULE 4

INCINERATOR SCHEDULE


Any article, machine, equipment or other contrivance designed and used primarily to dispose of combustible refuse by wholly consuming the material charged leaving only the ashes or residue shall be assessed a permit fee based on the following schedule of the maximum horizontal inside cross sectional area, in square feet, of the primary combustion chamber:

AREA IN SQUARE FEET

AUTHORITY TO CONSTRUCT

INITIAL PERMIT FEE

ANNUAL PERMIT RENEWAL FEE

up to and including 3

$ 70.00

$ 40.00

greater than 3 but less than 4

$ 135.00

$ 70.00

4 or greater but less than 7

$ 275.00

$ 70.00

7 or greater but less than 10

$ 695.00

$ 135.00

10 or greater but less than 15

$1100.00

$ 135.00

15 or greater but less than 23

$1455.00

$ 205.00

23 or greater but less than 40

$1850.00

$ 205.00

40 or greater

$2645.00

$ 275.00

SCHEDULE 5

STATIONARY CONTAINER SCHEDULE

Any stationary tank, reservoir or other container shall be assessed a permit fee based on the following schedule of capacities in gallons or cubic equivalent:

GALLONS

AUTHORITY TO CONSTRUCT

INITIAL PERMIT FEE

ANNUAL PERMIT RENEWAL FEE

up to and including 4,000

$ 70.00

$ 40.00

greater than 4000 but less than 10,000

$ 135.00

$ 70.00

10,000 or greater but less than 40,000

$ 275.00

$ 70.00

40,000 or greater but less than 100,000

$ 695.00

$135.00

100,000 or greater but less than 400,000

$1100.00

$205.00

400,000 or greater but less than 1,000,000

$1455.00

$275.00

1,000,000 or greater but less than 1,500,000

$1850.00

$415.00

1,500,000 or greater

$2645.00

$550.00

SCHEDULE 6

MISCELLANEOUS SCHEDULE

Any article, machine, equipment or other contrivance for which a permit to operate is required and which is not included in the preceding schedules shall be assessed a permit fee as follows:

1. Net Emission Increase less than 250 lb/day

1a. Initial Permit Fee is $600.00

1b. Annual Permit Renewal Fee is $200.00

2. Net Emission Increase greater than or equal to 250 lb/day

2a. Initial Permit Fee is $1,800.00

2b. Annual Permit Renewal Fee is $600.00

SCHEDULE 7

GEOTHERMAL DEVELOPMENT SCHEDULE

Any stationary source of air contaminant emissions relative to the production or utilization of geothermal resources, for which an Authority to Construct or Permit to Operate is required, shall be assessed a permit fee in accordance with the following schedule:

GEOTHERMAL SOURCE

AUTHORITY TO CONSTRUCT

INITIAL PERMIT FEE

ANNUAL PERMIT RENEWAL FEE

Geothermal Well

$ 800.00

$ 500.00

Geothermal Well within an RMP

$1600.00

$1000.00

Geothermal Fluid Transmission Line

$1200.00

$ 800.00

Power Plant Unit

$3000.00

$2000.00

Binary Power Plant Unit

$1500.00

$1000.00

SCHEDULE 8

COMMERCIAL BUILDING SCHEDULE

Any secondary source consisting of a commercial building or structure shall be assessed a permit fee based on the total square footage of all such buildings or structures, in accordance with the following schedule:

1. Initial Fee .25 per square foot

1a. The minimum fee per source is $100.00

1b. The maximum fee per source is $10,000.00

SCHEDULE 9

COMMERCIAL PARKING SCHEDULE

Any secondary source utilizing a commercial parking lot or structure shall be assessed a permit fee based on the number of parking spaces, in accordance with the following schedule:

1. Initial Fee $30.00 per parking space

1a. The minimum fee per source is $100.00

1b. The maximum fee per source is $10,000.00

SCHEDULE 10

HOUSING UNIT SCHEDULE

Any secondary source consisting of housing spaces or units greater than four family units shall be assessed a permit fee based on the number of family spaces or units, in accordance with the following schedule:

1. Initial Fee $150.00 per unit

1a. the minimum fee per source is $750.00

1b. The maximum fee per source is $10,000.00