§ 1236 Projects exempt from regional emissions analyses.

Notwithstanding the other requirements of this rule, highway and transit projects of the types listed in Table 3 are exempt from regional emissions analysis requirements. The local effects of these projects with respect to CO or PM10 concentrations must be considered to determine if a hot-spot analysis is required prior to making a project-level conformity determination. These projects may then proceed to the project development process even in the absence of a conforming transportation plan and TIP. A particular action of the type listed in Table 3 is not exempt from regional emissions analysis if the MPO in consultation with other agencies (see 1206(c)(1)(iii)), the EPA, and the FHWA (in the case of a highway project) or the FTA (in the case of a transit project) concur that it has potential regional impacts for any reason.

Table 3.

Projects Exempt from Regional Emissions Analyses


Intersection channelization projects

Intersection signalization projects at individual intersections

Interchange reconfiguration projects

Changes in vertical and horizontal alignment

Truck size and weight inspection stations

Bus terminals and transfer points