GBUAPCD RULE 301 PERMIT FEE SCHEDULES
LAST REVISED 11/11/11

RULE 301. Permit Fee Schedules

Each permit shall be assessed an initial permit fee according to the following applicable schedule. It is hereby determined that the cost of issuing permits, and of inspections pertaining to such issuance exceeds the fees prescribed herein. In the event that more than one fee schedule is applicable to an initial permit fee or annual permit renewal fee, the governing schedule shall be that which results in the higher fee.

SCHEDULE I


ELECTRIC MOTOR HORSEPOWER SCHEDULE


Any article, machine, equipment or other contrivance where an electric motor is used as the power supply shall be assessed a permit fee based on the total rated motor horsepower of all such electric motors included in any such article, machine, equipment or other contrivance, in accordance with the following schedule:

AUTHORITY ANNUAL

TO CONSTRUCT PERMIT

HORSEPOWER INITIAL PERMIT FEE RENEWAL FEE

up to and including 5..............$ 70.00 $ 35.00

greater than 5 but less

than 15............................$ 135.00 $ 70.00

15 or greater but less

than 45............................$ 275.00 $ 90.00

45 or greater but less

than 65............................$ 695.00 $205.00

65 or greater but less

than 125...........................$1100.00 $240.00

125 or greater but less

than 200...........................$1455.00 $290.00

200 or greater but less

than 400...........................$1850.00 $420.00

400 or greater.....................$2530.00 $690.00









SCHEDULE 2


FUEL BURNING EQUIPMENT SCHEDULE


Any article, machine, equipment or other contrivance in which fuel is burned, with the exception of incinerators which are covered in Schedule 4, shall be assessed a permit fee based upon the design fuel consumption of the article, machine, equipment or other contrivance expressed in thousands of British Thermal Units (BTU) per hours, using gross heating values of the fuel, in accordance with the following schedule:

AUTHORITY ANNUAL

1000 BRITISH THERMAL UNITS TO CONSTRUCT PERMIT

PER HOUR INITIAL PERMIT FEE RENEWAL FEE

up to and including 150.............$ 70.00 $ 35.00

greater than 150 but less

than 400............................$ 135.00 $ 70.00

400 or greater but less

than 650............................$ 275.00 $ 70.00

650 or greater but less

than 1500...........................$ 695.00 $ 205.00

1500 or greater but less

than 5000...........................$1100.00 $ 275.00

5,000 or greater but less

than 15,000.........................$1455.00 $ 415.00

15,000 or greater but less

than 50,000.........................$1850.00 $ 690.00

50,000 or greater but less

than 100,000........................$2645.00 $1190.00

100,000 or greater but less

than 200,000........................$3795.00 $1985.00

200,000 or greater..................$5060.00 $2645.00











SCHEDULE 3


ELECTRICAL ENERGY SCHEDULE


Any article, machine, equipment or other contrivance which uses electrical energy, with the exception of electric motors covered in Schedule 1, shall be assessed a permit fee based on the total kilovolt ampere (KVA) ratings, in accordance with the following schedule:

AUTHORITY TO ANNUAL

CONSTRUCT INITIAL PERMIT

KILOVOLT AMPERE PERMIT FEE RENEWAL FEE

up to and including 20.............$ 70.00 $ 40.00

greater than 20 but less

than 40............................$ 135.00 $ 70.00

40 or greater but less

than 145...........................$ 275.00 $ 70.00

145 or greater but less

than 450...........................$ 695.00 $ 205.00

450 or greater but less

than 4,500.........................$1100.00 $ 205.00

4,500 or greater but less

than 14,500........................$1455.00 $ 415.00

14,500 or greater but less

than 45,000........................$1850.00 $ 415.00

45,000 or greater..................$2645.00 $ 690.00



























SCHEDULE 4


INCINERATOR SCHEDULE


Any article, machine, equipment or other contrivance designed and used primarily to dispose of combustible refuse by wholly consuming the material charged leaving only the ashes or residue shall be assessed a permit fee based on the following schedule of the maximum horizontal inside cross sectional area, in square feet, of the primary combustion chamber:

AUTHORITY TO ANNUAL

CONSTRUCT INITIAL PERMIT

AREA IN SQUARE FEET PERMIT FEE RENEWAL FEE

up to and including 3............$ 70.00 $ 40.00

greater than 3 but less

than 4...........................$ 135.00 $ 70.00

4 or greater but less

than 7...........................$ 275.00 $ 70.00

7 or greater but less

than 10..........................$ 695.00 $ 135.00

10 or greater but less

than 15..........................$1100.00 $ 135.00

15 or greater but less

than 23..........................$1455.00 $ 205.00

23 or greater but less

than 40..........................$1850.00 $ 205.00

40 or greater....................$2645.00 $ 275.00

























SCHEDULE 5


STATIONARY CONTAINER SCHEDULE


Any stationary tank, reservoir or other container shall be assessed a permit fee based on the following schedule of capacities in gallons or cubic equivalent:

AUTHORITY TO ANNUAL

CONSTRUCT INITIAL PERMIT

GALLONS PERMIT FEE RENEWAL FEE

up to and including 4,000.........$ 70.00 $ 40.00

greater than 4000 but less

than 10,000.......................$ 135.00 $ 70.00

10,000 or greater but less

than 40,000.......................$ 275.00 $ 70.00

40,000 or greater but less

than 100,000......................$ 695.00 $135.00

100,000 or greater but less

than 400,000......................$1100.00 $205.00

400,000 or greater but less

than 1,000,000....................$1455.00 $275.00

1,000,000 or greater but less

than 1,500,000....................$1850.00 $415.00

1,500,000 or greater..............$2645.00 $550.00































SCHEDULE 6


MISCELLANEOUS SCHEDULE


Any article, machine, equipment or other contrivance for which a permit to operate is required and which is not included in the preceding schedules shall be assessed a permit fee as follows:

1. Net Emission Increase less than 250 lb/day

1a. Initial Permit Fee is $600.00

1b. Annual Permit Renewal Fee is $200.00

2. Net Emission Increase greater than or equal to 250 lb/day

2a. Initial Permit Fee is $1,800.00

2b. Annual Permit Renewal Fee is $600.00



SCHEDULE 7


GEOTHERMAL DEVELOPMENT SCHEDULE


Any stationary source of air contaminant emissions relative to the production or utilization of geothermal resources, for which an Authority to Construct or Permit to Operate is required, shall be assessed a permit fee in accordance with the following schedule:

AUTHORITY TO ANNUAL

CONSTRUCT INITIAL PERMIT

GEOTHERMAL SOURCE PERMIT FEE RENEWAL FEE

Geothermal Well...................$ 800.00 $ 500.00

Geothermal Fluid

Transmission Line.................$1200.00 $ 800.00

Power Plant Unit..................$3000.00 $2000.00

Binary Power Plant Unit...........$1500.00 $1000.00











SCHEDULE 8


COMMERCIAL BUILDING SCHEDULE


Any secondary source consisting of a commercial building or structure shall be assessed a permit fee based on the total square footage of all such buildings or structures, in accordance with the following schedule:

1. Initial Fee .25 per square foot

1a. The minimum fee per source is $100.00

1b. The maximum fee per source is $10,000.00



SCHEDULE 9


COMMERCIAL PARKING SCHEDULE


Any secondary source utilizing a commercial parking lot or structure shall be assessed a permit fee based on the number of parking spaces, in accordance with the following schedule:

1. Initial Fee $30.00 per parking space

1a. The minimum fee per source is $100.00

1b. The maximum fee per source is $10,000.00



SCHEDULE 10


HOUSING UNIT SCHEDULE


Any secondary source consisting of housing spaces or units greater than four family units shall be assessed a permit fee based on the number of family spaces or units, in accordance with the following schedule:

1. Initial Fee $150.00 per unit

1a. the minimum fee per source is $750.00

1b. The maximum fee per source is $10,000.00