MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DISTRICT


RULE 301 -- PERMIT FEE SCHEDULES

(Adopted 9-1-74) (Revised 9-16-76, 5-31-78, 5-20-81, 8-18-82, 6-13-83, 7-19-84, 12-13-84, 7-17-85, 6-11-86, 12-17-86, 6-10-87, 9-16-87, 6-20-88, 12-14-88, 6-14-89, 6-13-90, 6-26-91, 5- 17-95, 6-21-95 ; 6-18-97; 6-17-98; 6-16-99, 6-21-00, and 6-20-01.)

CONTENTS

Schedule l - Fuel Burning Equipment

Schedule 2 - Incinerators

Schedule 3 - Stationary Containers

Schedule 4 - Internal Combustion Engines

Schedule 5 - Miscellaneous Equipment

Schedule 6 - Gasoline Storage Containers

Schedule 7 - Nonarchitectural Coating and Solvent Applications

Schedule 8 - Gasoline Dispensing Equipment

Schedule 9 - Toxic Air Contaminants

Schedule 10 - Public Notification



Pursuant to Rule 300 (District Fees), fees shall be determined from the subsequent schedules. In the event that more than one alternative fee schedule is applicable to a permit, the governing schedule shall be that which results in the higher fee. Where a group of articles, machines, equipment or other contrivances are included in a single permit, the permit fee shall be based on the total rating of the group. Schedule 9 and 10 fees are in addition to fees from Schedules 1 through 8.

Schedule 1
Fuel Burning Equipment

Any article, machine, equipment or other contrivance in which fuel is burned, with the exception of incinerators which are covered in Schedule 2, shall be assessed a permit fee based upon the design fuel consumption of the article, machine, equipment or other contrivance expressed in thousands of British thermal units (BTUs) per hour using gross heating values of the fuel, in accordance with the following schedule:

1,000 BTUs per hour Fee
less than 150 $167
150 or greater but less than 500 $341
500 or greater but less than 1,500 $506
1,500 or greater but less than 5,000 $675
5,000 or greater but less than 15,000 $1,018
15,000 or greater but less than 65,000 $1,703
65,000 or greater but less than 150,000 $2,751
150,000 or greater but less than 300,000 $4,585
300,000 or greater but less than 500,000 $5,732
500,000 or greater but less than 750,000 $8,024
750,000 or greater but less than 1,000,000 $10,315
1,000,000 or greater $11,460

Schedule 2
Incinerator

Any article, machine, equipment or other contrivance designed and used primarily to dispose of
combustible refuse by wholly consuming the material charged leaving only the ashes or residue
shall be assessed a permit fee based on the following schedule of the maximum horizontal inside
cross sectional area, in square feet, or other primary combustion chamber:

$ = $37.00 (x)


where "x" is the primary chamber area in square feet.

Schedule 3
Stationary Containers

Any stationary tank, reservoir, or other container (other than gasoline containers) shall be
assessed a permit fee based on the following schedule of capacities in gallons or cubic
equivalent:

Gallons Fee
less than 4,000 $167
4,000 or greater but less than 10,000 $355
10,000 or greater but less than 40,000 $527
40,000 or greater $1,770

Schedule 4
Internal Combustion Engines

Any stationary piston type internal combustion engine shall be assessed a permit fee based on the
following schedule of horsepower:

Horsepower Fee
less than 100 $366
100 but less than 200 $891
200 but less than 400 $1,533
400 but less than 750 $2,553
750 or greater $3,832

Schedule 5
Miscellaneous Equipment

Any article, machine, equipment or other contrivance for which a Permit to Operate is required
and which is not included in one of the other schedules shall be assessed a permit fee of $539.
However, if the Air Pollution Control Officer determines that no schedules provided by this Rule
fairly represent the District's costs in processing the subject permit application, the Air Pollution
Control Officer shall assess a permit fee based on the actual costs incurred by the District in
processing the application at a rate of $96 per hour of District staff time expended, which shall be
rounded to the nearest whole hour. Permit fees assessed under this schedule may be appealed to
the District Hearing Board in accordance with Regulation VI - Procedure Before the Hearing
Board provisions.

Schedule 6
Gasoline Storage Container

Any stationary tank, reservoir, or other container located at a gasoline dispensing facility which is
not subject to the Phase II vapor recovery requirements shall be assessed a permit fee based on
the following schedule of capacities in gallons or cubic equivalent. Where more than one tank is
in use at one site, a single Permit to Operate for the total gasoline storage capacity shall be issued
and the resulting fees shall be determined and based on the resulting total gasoline storage
capacity for the facility.

Gallons Fee
250 through 749 $161
750 through 4,499 $328
4,500 through 9,999 $487
10,000 through 39,999 $775
40,000 or greater $1,064

Schedule 7
Nonarchitectural Coating and Solvent Applications

Any facility applying at least five (5) gallons per year of all nonarchitectural coatings and
solvents shall be assessed a permit fee of $443.

Schedule 8
Gasoline Dispensing Equipment

Any gasoline dispensing facility which is subject to the Phase II vapor recovery requirements of
District Rule 1002, Part 3 shall be assessed a permit fee based on the following schedule:

$478 + $55 per nozzle.


Any gasoline dispensing facility which is subject to the Phase II vapor recovery requirements and
is proposing modifications to the Phase I vapor recovery equipment, which do not involve the
disconnection, replacement or addition of Phase II vapor recovery system piping or components,
shall be assessed only a permit fee of $478.


Schedule 9
Toxic Air Contaminants

In addition to other fees required, each permit issued for any equipment/operation which may
emit or has the potential to emit any toxic air contaminant(s) (TACs), as defined in Rule 1000,
shall be assessed a $118 fee for each such Permit to Operate.


Schedule 10
Public Notification

In addition to other fees required, projects for which permits are issued following public notice
published in newspapers shall pay a public notification fee of $358 for the project.

* * * * *