MBUAPCD RULE 301 PERMIT FEE SCHEDULES
LAST REVISED 06/21/95


RULE 301.  PERMIT FEE SCHEDULES


(Adopted 9-1-74; Revised 9-16-76, 5-31-78, 5-20-81, 8-18-82,
6-13-83, 7-19-84, 12-13-84, 7-17-85, 6-11-86, 12-17-86, 6-10-87,
9-16-87, 6-20-88, 12-14-88, 6-14-89, 6-13-90, 6-26-91,  5-17-95,
and 6/21/95.)


                                 CONTENTS

          Schedule l - Fuel Burning Equipment

          Schedule 2 - Incinerators

          Schedule 3 - Stationary Containers

          Schedule 4 - Internal Combustion Engines

          Schedule 5 - Miscellaneous Equipment

          Schedule 6 - Gasoline Storage Containers

          Schedule 7 - Solid Waste Disposal Sites

          Schedule 8 - Nonarchitectural Coating Applications

          Schedule 9 - Gasoline Dispensing Equipment

          Schedule 10 - Toxic Air Contaminants

          Schedule 11 - Public Notification



Pursuant to Rule 300 (Permit Fees), fees shall be determined from
the subsequent schedules.  In the event that more than one
alternative fee schedule is applicable to a permit, the governing
schedule shall be that which results in the higher fee.  Where a
group of articles, machines, equipment or other contrivances are
included in a single permit, the permit fee shall be based on the
total rating of the group.  Schedule 10 and 11 fees are in
addition to fees from Schedules 1 through 9.


                                Schedule 1
                          Fuel Burning Equipment


Any article, machine, equipment or other contrivance in which
fuel is burned, with the exception of incinerators which are
covered in Schedule 2, shall be assessed a permit fee based upon
the design fuel consumption of the article, machine, equipment or
other contrivance expressed in thousands of British thermal units
(BTUs) per hour using gross heating values of the fuel, in
accordance with the following schedule:


     1,000 BTUs per hour                                        
Fee

up to and including 150                             $  140.00
greater than 150 but less than 500                  $  286.00
500 or greater but less than 1,500                  $  425.00
1,500 or greater but less than 5,000                $  567.00
5,000 or greater but less than 15,000               $  854.00
15,000 or greater but less than 65,000              $1,430.00
65,000 or greater but less than 150,000             $2,309.00
150,000 or greater but less than 300,000            $3,849.00
300,000 or greater but less than 500,000            $4,812.00
500,000 or greater but less than 750,000            $6,736.00
750,000 or greater but less than 1,000,000          $8,661.00
1,000,000 or greater                                $9,622.00



                                Schedule 2
                                Incinerator

Any article, machine, equipment or other contrivance designed and
used primarily to dispose of combustible refuse by wholly
consuming the material charged leaving only the ashes or residue
shall be assessed a permit fee based on the following schedule of
the maximum horizontal inside cross sectional area, in square
feet, or other primary combustion chamber:

                          $ =  $32.00 (x)   

Where "x" is the primary chamber area in square feet.


                                Schedule 3
                           Stationary Containers

Any stationary tank, reservoir, or other container (other than
gasoline containers) shall be assessed a permit fee based on the
following schedule of capacities in gallons or cubic equivalent:


       Gallons                                             Fee

up to and including 4,000                           $  140.00
greater than 4,000 but less than 10,000             $  298.00
10,000 or greater but less than 40,000              $  443.00
40,000 or greater                                   $1,486.00



                                Schedule 4
                        Internal Combustion Engines

Any stationary piston type internal combustion engine of greater
than 100 brake horsepower shall be assessed a permit fee based on
the following schedule of horsepower:


         Horsepower                                        Fee

greater than 50 but less than 100                   $  308.00
greater than 100 but less than 200                  $  749.00
greater than 200 but less than 400                  $1,286.00
greater than 400 but less than 750                  $2,143.00
greater than 750                                    $3,218.00



                                Schedule 5
                          Miscellaneous Equipment

Any article, machine, equipment or other contrivance for which a
Permit to Operate is required and which is not included in the
preceding schedules shall be assessed a permit fee of $453.00. 
However, if the Air Pollution Control Officer determines that no
schedules provided by this Rule fairly represent the District's
costs in processing the subject permit application, the Air
Pollution Control Officer shall assess a permit fee based on the
actual costs incurred by the District in processing the
application at a rate of $80.00 per hour of District staff time
expended, which shall be rounded to the nearest whole hour.
Permit fees assessed under this schedule may be appealed to the
District Hearing Board in accordance with Regulation VI -
Procedure Before the Hearing Board provisions.

                                Schedule 6
                        Gasoline Storage Container


Any stationary tank, reservoir, or other container used for the
storage of gasoline shall be assessed an initial permit fee in
addition to the application filing fee based on the following
schedule of capacities in gallons or cubic equivalent.  Where
more than one tank is in use at one site, a single permit to
operate for the total gasoline storage capacity shall be issued
and the resulting fees shall be determined and based on the
resulting total gasoline storage capacity for the facility.

    Gallons                                                Fee

250 through 749                                     $   12.00
750 through 4,449                                   $  140.00 
4,500 through 9,999                                 $  286.00
10,000 through 39,999                               $  425.00
40,000 or greater                                     $1,430.00



                                Schedule 7
                        Solid Waste Disposal Sites

Any place, location, tract of land, area, or premises in use or
which has been used for landfill disposal purposes shall be
assessed the following fees:  A SWAT evaluation fee, as set forth
below, and the actual costs for analyses of any sample(s)
collected by the District as determined necessary for
evaluation.  Sample analyses costs shall be in addition to the
SWAT evaluation fee. 

  Type of Work                                         Fee

  Sample Analysis                               Actual Costs

  Testing Observations
  and Evaluation Costs                          $80.00/hour

  Private Consultation                          $80.00/hour with
    minimum 1 hour billing






                                Schedule 8
                   Nonarchitectural Coating Applications


Any facility applying at least five (5) gallons per year of any
nonarchitectural coating shall be assessed a permit fee based on
the following schedule of maximum annual coating usage:


      Annual Coating Usage    Fee
           
        5 -  50 gal/yr            $  88.00
        over 50 gal/yr            $ 371.00



                            Schedule 9
                  Gasoline Dispensing Equipment


Any gasoline dispensing facility which is required to install
Phase II vapor recovery equipment shall be assessed a permit fee
based on the following schedule:

        400.00 + $ 46.00 per nozzle

Facilities which are proposing gasoline dispenser modifications
with Phase II vapor recovery equipment installed shall be
assessed a permit fee of $46.00 per additional nozzle.



                                Schedule 10
                          Toxic Air Contaminants


In addition to other fees required, each permit issued for any
equipment/operation which may emit or has the potential to emit
any toxic air contaminant(s) (TACs), as defined in Rule 1000,
shall be assessed a $100.00 fee for each such Permit to Operate.


                                Schedule 11
                            Public Notification

In addition to other fees required, projects for which permits
are issued following public notice published in newspapers shall
pay a public notification fee of $300.00 for the project.

                               *  *  *  *  *