NCUAQMD RULE 1-3-310 PERMIT FEE SCHEDULES
LAST REVISED 11/11/11

RULE 310 - PERMIT FEE SCHEDULES

It is hereby determined that the cost of reviewing permit applications, issuing authorizations, and of inspections, testing and monitoring pertaining to such issuance, exceeds the fees prescribed herein. In determining the fees to be charged, identical or like equipment within each process unit that requires a permit may be totaled for each schedule. In the event that more than one fee schedule is applicable to an Authority to Construct or Permit to Operate, the governing schedule shall be that which results in the highest fee. The CPI adjustment factor shall be applied to the initial fee, as well as the annual fee.

SCHEDULE 1

ELECTRIC MOTOR HORSEPOWER SCHEDULE

Any stationary source of air contaminant emissions for which an Authority to Construct or a Permit to Operate is required, where an electric motor or equivalent drive unit is used as the power supply, shall be assessed a permit fee based on the total rated horsepower of all such drive units, or their horsepower equivalent in kilovolt amperes (1 KVA=1.34 HP), included in such stationary source in accordance with the following schedule.

INITIAL ANNUAL

HORSEPOWER FEE RENEWAL

Less than 25 .............................. $ 20.00 $ 10.00

25 or greater but less than 50 ............ 40.00 20.00

50 or greater but less than 100 ............ 100.00 50.00

100 or greater but less than 300 ........... 200.00 100.00

300 or greater but less than 1,000 ......... 300.00 150.00

1,000 or greater............................ 400.00 200.00

SCHEDULE 2

FUEL BURNING AND POWER GENERATION EQUIPMENT SCHEDULE

Any stationary source of air contaminant emissions, for which an Authority to Construct or Permit to Operate is required, in which fuel may at any time be burned or in which power may be generated, with the exception of incinerators or refuse burners which are covered in Schedule 3, shall be assessed a permit fee based upon its rated design capacity of heat input expressed in millions of British Thermal Units (BTU) per hour, using gross heating value of the fuel or its equivalent, in accordance with the following schedule:

INITIAL ANNUAL

MILLION BRITISH THERMAL UNITS PER HOUR FEE RENEWAL

Less than 1 ............................... $ 40.00 $ 20.00

1 or greater but less than 5 .............. 100.00 50.00

5 or greater but less than 20 ............. 200.00 100.00

20 or greater but less than 50 ............ 400.00 200.00

50 or greater but less than 100 ........... 600.00 300.00

100 or greater but less than 250 .......... 800.00 400.00

250 or greater but less than 500 .......... 2000.00 1000.00

500 or greater but less than 1000 ......... 3000.00 1500.00

1000 or greater ........................... 4000.00 2000.00

SCHEDULE 3

INCINERATOR AND REFUSE BURNER SCHEDULE

Any stationary source of air contaminant emissions, for which an Authority to Construct or Permit to Operate is required, for the disposal of approved combustibles by burning, shall be assessed a permit fee based on the maximum horizontal inside cross sectional area of the primary combustion chamber, in accordance with the following schedule.

INITIAL ANNUAL

AREA, SQUARE FEET FEE RENEWAL

Less than 12 ............................... $ 20.00 $ 10.00

12 or greater but less than 100 ............ 40.00 20.00

100 or greater but less than 400 ........... 100.00 50.00

400 or greater but less than 1,000 ......... 300.00 150.00

1,000 or greater but less than 3,000 ....... 600.00 300.00

3,000 or greater ........................... 1000.00 500.00

SCHEDULE 4

STATIONARY CONTAINER SCHEDULE

Any stationary tank, reservoir, or other container for which an Authority to Construct or Permit to Operate is required, shall be assessed a permit fee based on capacities in gallons or cubic equivalent, in accordance with the following schedule. An annual renewal fee shall not be assessed for this equipment category, except for sources which are subject to compliance with federal new source performance standards.

INITIAL ANNUAL NSPS

GALLONS FEE RENEWAL RENEWAL

250 or greater but less than 4,000 .... $ 20.00 None None

4,000 or greater but less than 40,000 .. 40.00 None None

40,000 or greater but less than 400,000. 100.00 None 50.00

400,000 or greater ..................... 200.00 None 100.00



SCHEDULE 5

PROCESS WEIGHT SCHEDULE

Any stationary source of air contaminant emissions, for which an Authority to Construct or Permit to Operate is required, shall be assessed a permit fee based upon the annual average process weight rate calculated in pounds per hour.

INITIAL ANNUAL

AVERAGE POUNDS PER HOUR FEE RENEWAL

less than 5,000............................ $ 40.00 $ 20.00

5,000 or greater but less than 20,000....... 100.00 50.00

20,000 or greater but less than 50,000...... 200.00 100.00

50,000 or greater but less than 100,000...... 300.00 150.00

100,000 or greater but less than 200,000..... 500.00 250.00

200,000 or greater but less than 400,000..... 700.00 350.00

400,000 or greater.......................... 1000.00 500.00

SCHEDULE 6

MISCELLANEOUS SCHEDULE

Any stationary source of air contaminant emissions, for which an Authority to Construct or Permit to Operate is required, shall be assessed a permit fee based upon the volumetric exhaust rate from the source, expressed in actual cubic feet per minute.

INITIAL ANNUAL

VOLUME EXHAUSTED(CFM) FEE RENEWAL

up to and including 2,000.................. $ 20.00 $ 10.00

2,000 or greater but less than 5,000....... 40.00 20.00

5,000 or greater but less than 20,000...... 100.00 50.00

20,000 or greater but less than 50,000..... 200.00 100.00

50,000 or greater but less than 100,000.... 400.00 200.00

100,000 or greater but less than 200,000... 800.00 400.00

200,000 or greater......................... 1200.00 600.00

SCHEDULE 7

GEOTHERMAL DEVELOPMENT SCHEDULE

Any stationary source of air contaminant emissions relative to the production or utilization of geothermal steam, for which an Authority to Construct or Permit to Operate is required, shall be assessed a permit fee in accordance with the following schedule.

INITIAL ANNUAL

GEOTHERMAL SOURCES FEE RENEWAL

Geothermal Well........................... $ 300.00 $ 150.00

Geothermal Well Air Pollution Control Device . 40.00 --

Power Plant Unit.......................... -- 2350.00

Power Plant Unit Air Pollution Control Device.240.00 --