SCAQMD RULE 2012-4 PROCESS UNITS/PERIODIC REPORTING AND RULE 219 EQUIPMENT
LAST REVISED 07/12/96

(Amended July 12, 1996)

CHAPTER 4

_______________________________________________________________

PROCESS UNITS - PERIODIC REPORTING

AND RULE 219 EQUIPMENT

TABLE OF CONTENTS

CHAPTER 4 - PROCESS UNITS PERIODIC REPORTING
AND RULE 219 EQUIPMENT

A. Monitoring, Reporting, and Recordkeeping Requirements ...................... 2012A-4-1

B. Emission Calculations for Reporting Data.................... ........................... 2012A-4-2

C. Total Quarterly Emissions Calculation for all NOx Process Units
at the Facility ............................................................................................. 2012A-4-8

D. Reporting Procedures ........................................................................... 2012A-4-8

E. Fuel Meter Sharing ................................................................................ 2012A-4-9

F. Rule 219 Equipment .............................................................................. 2012A-4-9

G. Substitute Data Procedures ................................................................... 2012A-4-10

Process units are one or more pieces of equipment which are listed in Table 1-C. The process units emissions are reported quarterly as shown in Table 4-A and based primarily on fuel consumption or operating time in conjunction with an emission factor. The requirements and procedures for an emission factor and election conditions for an alternative emission factor shall apply to process units. For equipment designated as exempt from permit in Rule 219 emissions shall be determined according to the methodology specified in this Chapter 4, subdivision F.

Process units and equipment exempt from permit as designated in Rule 219 may share fuel meters if each equipment has the same emission factor. This chapter also includes the equations describing the methods used to calculate NOx process unit emissions and the reporting procedures. The interim reporting period does not apply to process units since existing fuel metering equipment or timers shall be used starting January 1, 1994 for Cycle 1 facilities and July 1, 1994 for Cycle 2 facilities.

A. MONITORING, REPORTING, AND RECORDKEEPING
REQUIREMENTS

  1. The category-specific starting emission factor found in Table 1 of Rule 2002 - Allocations for Oxides of Nitrogen (NOx) and Sulfur (SOx) shall be used for quantifying quarterly mass emissions for a NOx process unit.
  2. The Facility Permit holder of a process unit may request a category-specific emission rate that is reliable, accurate, and representative for purposes of calculating NOx emissions. The emission rate shall be determined based on the source testing protocol specified in Chapter 5.
  3. The Facility Permit holder of a process unit shall calculate the mass emissions according to the methodology specified in Paragraph 4.B.2. (totalizing fuel meters) or 4.B.3.a. (timers).
  4. The Facility Permit holder of each NOx Process Unit shall use a totalizing fuel meter or timer as applicable, as specified in the Facility Permit for each NOx process unit to measure and report the variables listed in Tables 4-A and 4-B, respectively, for each NOx process unit.
  5. Fuel flow measuring devices used for obtaining stack flow in conjunction with F-factors shall be tested as installed for relative accuracy using reference methods to determine stack flow.
  6. If the flow device manufacturer has a method or device that permits the fuel flow measuring device to be tested as installed for relative accuracy, the Facility Permit holder shall request approval from the Executive Officer to use the manufacturer's method. Approval will be granted in cases where the Facility Permit holder can demonstrate to the satisfaction of the Executive Officer that no suitable testing location exists in the exhaust stacks or ducts and that it would be an inordinate cost burden to modify the exhaust stack configuration to provide a suitable testing location. The method or device used for relative accuracy testing shall be traceable to NIST standards. This method shall be used only if natural gas, fuel oil, or other fuels can be shown, by the Facility Permit holder to have stable F-factors and gross heating values, or if the Facility Permit holder measures the F-factor and gross heating value of the fuel. A stable F-Factor is defined as not varying by more than +/-2.5% from the constant value used for F-Factor. For the fuels listed in 40 CFR 60, Appendix A, Method 19, Table 19-1, the F-Factors are assumed to be stable at the value cited in Table 19-1. Any F-Factor cited in Regulation XX shall supersede the f-Factor in Table 19-1. For fuels not listed in the citations above, but which the Facility Permit holder can demonstrate that the source-specific F-Factor meets the same stability criteria, periodic reporting of F-Factor may be accepted and the adequacy of the frequency of analyses shall be demonstrated by the facility such that the probability that any given analysis will differ from the previous analysis by more than 5% (relative to the previous analysis) is less than 5%. Analysis records shall be maintained, including all charts and laboratory notes.

  7. Fuel meters and/or timers have to be non-resettable and tamper-proof. They have to have seals installed by the meter/timer manufacturer to prove the integrity of the measuring device.
  8. Meters which are unsealed for maintenance or repairs shall be resealed by an authorized manufacturers representative.

  9. The Facility Permit holder of each NOx process unit shall monitor, report, and maintain the following records on a quarterly basis:
  10. a. Type and quantity of fuel burned, in units of millions of standard cubic feet per quarter (mmscf per quarter) for gaseous fuels or thousand gallons per quarter (mgal per quarter) for liquid fuels, expressed to at least three significant figures; or

    b. Total hours of operation; and

    c. Production/Processing/Feed rate.

  11. The Facility Permit holder of each NOx process unit shall also provide any other data necessary for calculating the emission rates of nitrogen oxides as determined by the Executive Officer.

B. EMISSION CALCULATION FOR REPORTING DATA

  1. Quarterly Mass Emissions for Interim Periods
  2. Pursuant to Rule 2012 (f) (1), between January 1, 1994 and December 31, 1994 for Cycle 1 facilities, and between July 1, 1994 and June 30, 1995 for Cycle 2 facilities, the monthly emission of each process unit shall be calculated and recorded according to:

    r

    Eip = dj x EFsj (Eq.22)

    j=1

    Note: unable to provide graphic, please contact the District for a copy.

    where:

    Eip = The quarterly mass emission of nitrogen oxides for interim period (lb/quarter).

    dj = The quarterly fuel usage for each type of fuel recorded as mmscf/quarter or mgal/quarter).

    EFsj = The starting emission factor used to calculate unit emissions in the initial allocation, as specified in Table 1 of Rule 2002 - Allocations for Oxides of Nitrogen (NOx) and Sulfur (SOx) (lb/mmscf, lb/mgal).

    r = The number of different types of fuel consumed per quarter.

    j = Each type of fuel.0

    _________________________________________________________________________

    Example calculation: Boiler burning natural gas, rated 6 mmBtu/hr, in compliance with Rule 1146 starting year 1994
    Emission factor = 49.18 lb/mmscf
    Quarterly fuel usage = 1.1 mmscf per quarter

    Eip = (49.18) x (1.1)

    = 54.1 lb/quarter

    Applicable emission factor is also found in Volume II - Supporting Documentation, Appendix II-F - Methodology for NOx and SOx Starting and Ending Allocation Factors, Table 2-4 - Startpoint 1994 Emission Factors for Nitrogen Oxides.

    _________________________________________________________________________

  3. Totalizing Fuel Meter-Based Emission Calculation
  4. The Facility permit holder shall use an emission factor shown in Table 1 of Rule 2002 or in Table 3-D or an approved equipment-specific or category-specific emission rate for each affected NOx Process Unit to calculate the quarterly emissions according to:

    r


    Ek = dj x EFj (Eq.23)

    j=1

    Note: unable to provide graphic, please contact the District for a copy.

    or

    r


    Ek = dj x Vj x ERj (Eq.24)

    j=1

    Note: unable to provide graphic, please contact the District for a copy.

    where:

    Ek = The quarterly emissions of nitrogen oxides (lb/quarter).

    dj = The quarterly fuel usage for each type of fuel recorded by the fuel totalizer (mmscf/quarter or mgal/quarter)

    EFj= The emission factor specified in Table 1 of Rule 2002 - Allocations for Oxides of Nitrogen (NOx) and Sulfur (SOx) or specified in Table 3-D (lb/mmscf, lb/mgal). The emission factor found in Table 1 of Rule 2002 may or may not include the appropriate control efficiency.

    Vj = The higher heating value of each type of fuel (mmBtu/mmscf or mmBtu/mgal) determined by the Facility Permit holder or assigned from Table 3-D.

    ERj = The equipment-specific or category-specific emission rate; fuel-specific emission rate requested by the Facility Permit holder (lb/mmBtu).

    r = The number of different types of fuel consumed per month.

  5. Timer-Based Emission Calculations
  6. a. If the NOx process unit is equipped with a timer, the quarterly fuel usage shall be estimated according to Eq. 25, 26 27, and 28 and the quarterly emissions for each affected NOx process unit shall be calculated according to Eq. 23 and 24.

    If the NOx process unit does not measure fuel with a totalizing fuel meter, the quarterly fuel consumption for each affected equipment shall be estimated according to:

    d = dpu x (H/Hpu) (Eq.25)

    where:

    d = The estimated quarterly fuel consumption of an affected NOx process unit without a dedicated fuel meter (mmscf/quarter or mgal/quarter).

    dpu = The quarterly fuel consumption of all NOx process units at the facility (mmscf/quarter or mgal/quarter).

    H = The quarterly heat input of an affected equipment without a dedicated fuel meter (mmBtu/quarter).

    Hpu = The quarterly heat input of all NOx process units at the facility (mmBtu/quarter).

    _________________________________________________________

    Example Calculation:
    dpu = 1,587 mmscf/quarter
    H = 5,400 mmBtu/quarter
    Hpu = 27,000 mmBtu/quarter
    d = dpu x (H/Hpu)
    d = 1,587 mmscf/qtr x (5,400 mmBtu/qtr
    - 27,000 mmBtu/qtr)
    d = 317.4 mmscf/qtr

    _________________________________________________________

    The quarterly fuel usage for all the NOx process units at the facility (dpu) shall be calculated according to:

    dpu = dfac - (dlarge + dmajor) (Eq.26)

    where:

    dfac = The quarterly fuel usage of all major and large sources and NOx process units at the facility (mmscf/quarter or mgal/quarter).

    dmajor = The quarterly fuel usage of all major NOx sources at the facility (mmscf/quarter or mgal/quarter).

    dlarge = The quarterly fuel usage of all large NOx sources at the facility (mmscf/quarter or mgal/quarter ).

    ___________________________________________________________________

    Example Calculation:
    dfac = 174 mmscf/quarter
    dmajor = 126 mmscf/quarter
    dlarge = 30 mmscf/quarter
    dpu = dfac - (dlarge + dmajor)
    dpu = 174 - (126 + 30)
    dpu = 18 mmscf/quarter

    ___________________________________________________________________

    The quarterly heat input of all the NOx process units at the facility (Hpu) shall be calculated according to:

    n


    Hpu = (Ri x Ti) (Eq.27)

    i=1

    Note: unable to provide graphic, please contact the District for a copy.

    where:

    Ri = The maximum rated fuel capacity of a NOx process unit (mmBtu/hr).

    Ti = The quarterly accumulated operation hours for a NOx process unit (hrs/quarter).

    n = The total number of NOx process units at the facility.

    ____________________________________________________________________

    Example Calculation:
    R1 = 3.5 mmBtu/hr
    R2 = 2.7 mmBtu/hr
    T1 = 480 hr/quarter
    T2 = 120 hr/quarter

    2


    Hpu = (Ri x Ti)

    i = 1

    Note: unable to provide graphic, please contact the District for a copy.


    Hpu = (3.5 x 480) + (2.7 x 120)
    Hpu = 2004 mmBtu/quarter

    ____________________________________________________________________

    The maximum rated heat input capacity of all NOx process units shall be in units of mmBtu/hr. Since internal combustion engines are usually rated in units of brake horse power, the maximum rated heat input capacity of an engine shall be computed as follows:

    R = 0.002545 x bhp / eff (Eq.28)

    where:

    R = The maximum rated heat input capacity

    eff = The manufacturer's rated efficiency @LHV x (LHV/HHV)

    = 0.25, if not provided by the operator

    bhp = The manufacturer's rated shaft output in brake horse power

    ___________________________________________________________________

    Example Calculation:

    eff = 0.25
    bhp = 75 bhp
    R = 0.002545 x bhp / eff
    R = 0.002545 x 75/.25
    R = 0.7635 mmBtu/hr

    ___________________________________________________________________

    If gas turbines are rated in kilowatts, the rating shall be converted to mmBtu/hr by applying the manufacturer's heat rate (in mmBtu/kw-hr). If the manufacturer's heat rate is not available, a default value of 15,000 Btu/kw-hr shall be used.

    ___________________________________________________________________

    Example Calculation:

    Quarterly natural gas fuel usage for an ICE with maximum rated bhp of 90 bhp, 0.25 eff and a boiler rated at 4 mmBtu/hr is being served by one fuel meter reading 10.5 mmscf. The compliance emission rate of both ICE and boiler is 0.3 lb/mmBtu.


    ICE = 90 bhp Boiler= 4 mmBtu/hr
    Fuel meter reading = dpu = 10.5 mmscf


    I.C.E.
    R = 0.002545 x 90/.25 = 0.916 mmBtu/hr
    t = 3 hr/day x 7 days/wk. x 4 wk./mo. x 3 mo/qtr = 252 hr/qtr
    Hice = R x t = 0.916 x 252 = 230.8 mmBtu/ quarter


    Boiler
    Hboiler = 4 mmBtu/hr x 24 hr./day x 7 day/wk. x 4 wk./mo. x 3 mo/qtr
    Hboiler = 8064 mmBtu/quarter
    Hpu = 230.8 + 8064 = 8294.8 mmBtu/qtr


    dice = dpu x (Hice/Hpu)
    = 10.5 mmscf/qtr x (230.8/8294.8)
    = .298 mmscf/qtr


    dboiler = dpu x (Hboiler/Hpu)
    = 10.5 mmscf/qtr x (8064/8294.8)
    = 10.2 mmscf/qtr


    Eice = dice x V x ERc
    = 1050 mmBtu/mmscf x 0.30 lb/mmBtu x .298 mmscf/qtr
    = 93.87 lb/qtr
    Eboiler = dboiler x V x ERc
    = 10.2 mmscf/qtr x 1050 mmBtu/mmscf x 0.3 lb/mmBtu
    = 3213 lb/qtr


    E = Eice + Eboiler = 93.87 + 3213 lb/qtr = 3307 lb/qtr

______________________________________________________________________

C. TOTAL QUARTERLY EMISSIONS CALCULATION FOR ALL NOx PROCESS UNITS AT THE FACILITY

The quarterly NOx emissions of all NOx process units at the facility shall be estimated according to:

n

E = Ei (Eq.29)

i=1

Note: unable to provide equation graphics, please contact the District for a copy.

m

Ei = Ej (Eq. 30)

j=1

where:

E = The total quarterly emissions for all NOx process units

Ei = The quarterly emission of each NOx process unit (lb/quarter)

Ej = The quarterly emission of each NOx process unit per type of fuel (lb/quarter)

i = Each type of affected NOx process unit

j = Each type of fuel

m = The total number of fuels consumed for each affected NOx process unit per quarter

n = The total number of NOx process units at the facility.

___________________________________________________________________

Example Calculation:

E1 = 163.8 lb/quarter
E2 = 78 lb/quarter
E3 = 120 lb/quarter

n


E = Ei = 163.8 + 78 + 120

i=1       Note: unable to provide graphic, please contact the District for a copy.


E = 361.8 lb/quarter

__________________________________________________________________

D. REPORTING PROCEDURES

  1. The emissions data in any facility with an RTU shall be reported to Central Station Computer at the end of any quarter and the data shall be computed to determine the quarterly total emissions for each source using Equations 22 through 28 as appropriate.
  2. The total fuel usage data for all NOx process units in any facility without an RTU shall be recorded in a format approved by the Executive Officer and submitted to the District as part of the Quarterly Certified Report required by Rule 2004.
  3. The Facility Permit holder of NOx process units shall maintain daily records of operation hours or quarterly usage rate for each NOx process unit.
  4. Any changes made in type of fuel used and rated capacity for each source shall be recorded by the Facility Permit holder.
  5. The Facility Permit holder of any NOx process unit that opts to monitor at the large source monitoring level shall meet the requirements set forth in "Chapter 3 Large Sources - Continuous Process Monitoring System (CPMS)".

E. FUEL METER SHARING

  1. A single totalizing fuel meter shall be allowed to measure the cumulative fuel usage for more than one equipment provided that each equipment elects for the same emission rate or emission factor as specified in the Facility Permit and that any equipment in a process unit does not use the annual heat input in order to be categorized from a large source to a process unit.
  2. One or more equipment in a process NOx unit shall be allowed to share the fuel totalizing meter with the equipment in a process NOx unit provided that each equipment elects for the same emission rate or emission factor as specified in the Facility Permit.
  3. Fuel meter sharing for the interim period shall be allowed for those equipment in a process unit with the same emission rate or emission factor.

F. RULE 219 EQUIPMENT

  1. Emission Determination And Reporting Requirements
  2. a. The Facility Permit holder shall determine the emissions for one or more equipment exempt under Rule 219 and report the emissions on a quarterly basis as part of the Quarterly Certified Emissions Report Certification of Emissions required by Rule 2004. The Facility Permit holder shall be allowed to use the existing fuel totalizer, the monthly fuel billing statement, or any other equivalent methodology to estimate their fuel usage for a quarterly period.

    b. Quarterly reporting periods shall start on January 1, 1994 for Cycle 1 Facilities and July 1, 1994 for Cycle 2 facilities.

    c. The Facility Permit holder of each equipment shall maintain the quarterly fuel usage data for all equipment exempt under Rule 219 for three years. Such data shall be made available to District staff upon request.

    d. The fuel usage for equipment exempt under Rule 219 may be used in conjunction with fuel usage for process units provided that they have the same emission factor.

  3. Emission Calculations
  4. The Facility Permit holder shall determine NOx emissions for equipment exempt under Rule 219 as follows :

    n

    E219 = EFRi x di (Eq.31)

    i = 1      Note: unable to provide graphic, please contact the District for a copy.

    where:

    E219 = The total emissions for equipment exempt under Rule 219 estimated over a quarterly period (lb/ per quarter).

    EFRi = The equipment-specific or category-specific emission factor for each equipment exempt under Rule 219 equipment. The emission factor can be found in Table 3-D (lb/mmscf or lb/mgal).

    di = The equipment-specific or category-specific fuel usage (mmscf/ per quarter or mgal/ per quarter).

    n = The number of equipment exempt under Rule 219.

G. SUBSTITUTE DATA PROCEDURES

  1. For each process unit or process units using a common fuel meter, elapsed time meter, or equivalent monitoring device, the Facility Permit holder shall provide substitute data as described below whenever a valid quarter of usage data has not been obtained and recorded. Alternative data, based on a back-up fuel meter, elapsed time meter, or equivalent monitoring device, is acceptable for substitution if the Facility Permit holder can demonstrate to the Executive Officer that the alternative system is fully operational during meter down time and within + or - 2% accuracy. The substitute data procedures are retroactively applicable from the adoption date of the RECLAIM program.
  2. Whenever data from the process monitor is not available or not recorded for the affected equipment or when the equipment is not operated within the parameter range specified in the Facility Permit, the Facility Permit holder shall calculate substitute data for each quarter, when valid data has not been obtained, according to the following procedures.
  3. a. For a missing data period less than or equal to one quarter, substitute data shall be calculated using the process unit(s) average quarterly fuel usage for the previous four quarters. If four quarters of data are not available, substitute data shall be calculated as if the facility has no records.

    b. For a missing data period greater than one quarter, substitute data shall be calculated using the process unit(s) highest quarterly fuel usage data for the previous four quarters. If four quarters of data are not available, substitute data shall be calculated as if the facility has no records.

    c. If the facility has no records, substitute data shall be calculated using 100% uptime during the substitution period and the process unit(s) maximum rated capacity and uncontrolled emission factor for each quarter of missing data.

    TABLE 4-A

    MEASURED VARIABLES FOR ALL NOx PROCESS UNITS

    EQUIPMENT MEASURED VARIABLES
    All NOx process units 1. Fuel usage or processing/feed rate or operating time

    2. Production rate;

    TABLE 4-B

    REPORTED VARIABLES FOR ALL NOx PROCESS UNITS

    EQUIPMENT REPORTED VARIABLES
    All NOx process units 1. Quarterly mass emissions


SCAQMD RULE 2012-4 PROC. UNITS-PERIODIC REP. & R219 EQUIP.
LAST REVISED 11/11/11







         C H A P T E R   4



         P R O C E S S   U N I T S  -  P E R I O D I C   R E P O R T I N G

         A N D   R U L E   2 1 9   E Q U I P M E N T


                                  TABLE OF CONTENTS


             CHAPTER 4 - PROCESS UNITS PERIODIC REPORTING
                         AND RULE 219 EQUIPMENT

             A. Monitoring, Reporting, and Recordkeeping Requirements..74
             B. Emission Calculations for Reporting Data...............75
             C. Total Quarterly Emissions Calculation for all NOx Process
                Units at the Facility..................................82
             D. Reporting Procedures...................................82
             E. Fuel Meter Sharing.....................................83
             F. Rule 219 Equipment.....................................83




             Rule 2012
             October 15, 1993
             PROTOCOL FOR RULE 2012


             Process units are one or more pieces of equipment which are
             listed in Table 1-C.  The process units emissions are
             reported quarterly as shown in Table 4-A and based primarily
             on fuel consumption or operating time in conjunction with an
             emission factor.  The requirements and procedures for an
             emission factor and election conditions for an alternative
             emission factor shall apply to process units.  For equipment
             designated as exempt from permit in Rule 219 emissions shall
             be determined according to the methodology specified in this
             Chapter 4, subdivision F.
             Process units and equipment exempt from permit as designated
             in Rule 219 may share fuel meters if each equipment has the
             same emission factor.  This chapter also includes the
             equations describing the methods used to calculate NOx
             process unit emissions and the reporting procedures.  The
             interim reporting period does not apply to process units
             since existing fuel metering equipment or timers  shall be
             used starting January 1, 1994 for Cycle 1 facilities and
             July 1, 1994 for Cycle 2 facilities.
   A.   MONITORING, REPORTING, AND RECORDKEEPING REQUIREMENTS
        1.   The category-specific starting emission factor found in
             Table 1 of Rule 2002 - Allocations for Oxides of Nitrogen
             (NOx) and Sulfur (SOx) shall be used for quantifying
             quarterly mass emissions for a NOx process unit.
        2.   The Facility Permit holder of a process unit may
             request a category-specific emission rate that is reliable,
             accurate, and representative for purposes of calculating NOx
             emissions.  The emission rate shall be determined based on
             the source testing protocol specified in Chapter 5.
        3.   The Facility Permit holder of a process unit  shall
             calculate the mass emissions according to the methodology
             specified in Paragraph 4.B.2. (totalizing fuel meters) or
             4.B.3.a. (timers).
        4.   The  Facility  Permit  holder  of each NOx Process
             Unit shall use a totalizing fuel meter or timer as
             applicable,  as specified in the  Facility  Permit
             for each NOx process  unit  to  measure and report
             the  variables  listed  in  Tables  4-A  and  4-B,
             respectively, for each NOx process unit.

        5.   Fuel  flow  measuring  devices used for  obtaining
             stack flow in conjunction  with F-factors shall be
             tested  as installed for relative  accuracy  using
             reference methods to determine stack flow.

             If the flow  device  manufacturer  has a method or
             device that permits the fuel flow measuring device
             to  be tested as installed for relative  accuracy,
             the Facility  Permit holder shall request approval
             from   the   Executive    Officer   to   use   the
             manufacturer's method.  Approval  will  be granted
             in  cases  where  the  Facility Permit holder  can
             demonstrate to the satisfaction  of  the Executive
             Officer  that no suitable testing location  exists
             in the exhaust  stacks  or ducts and that it would
             be an inordinate cost burden to modify the exhaust
             stack configuration to provide  a suitable testing
             location.  The method or device used  for relative
             accuracy  testing  shall  be  traceable  to   NIST
             standards.   This  method  shall  be  used only if
             natural  gas,  fuel oil, or other fuels which  the
             Facility   Permit   holder   can   show   to   the
             satisfaction  of the Executive Officer have stable
             F-factors and gross  heating  values,  or  if  the
               Facility  Permit holder measurers the F-factor and
             gross heating value of the fuel.
        6.   Fuel  meters   and/or   timers  have  to  be  non-
             resettable and tamper-proof.   They  have  to have
             seals installed by the meter/timer manufacturer to
             prove the integrity of the measuring device.
                Meters  which  are  unsealed  for  maintenance  or
             repairs   shall   be  resealed  by  an  authorized
             manufacturers representative.
        7.   The Facility Permit  holder  of  each  NOx process
             unit  shall  monitor,  report,  and  maintain  the
             following records on a quarterly basis:

             a.   Type and quantity of fuel burned, in units of
                  millions  of standard cubic feet per  quarter
                  (mmscf per  quarter)  for  gaseous  fuels  or
                  thousand   gallons   per  quarter  (mgal  per
                  quarter) for liquid fuels,  expressed  to  at
                  least three significant figures; or

             b.   Total hours of operation; and
             c.   Production/Processing/Feed rate.
        8.   The Facility Permit holder of each NOx process unit
             shall also provide any other data necessary for calculating
             the emission rates of nitrogen oxides as determined by the
             Executive Officer.
   B.   EMISSION CALCULATION FOR REPORTING DATA
        1.   Quarterly Mass Emissions for Interim Periods
                 Pursuant to Rule 2012 (f) (1), between January 1, 1994
             and December 31, 1994 for Cycle 1 facilities, and between
             July 1, 1994 and June 30, 1995 for Cycle 2 facilties, the
             monthly emission of each process unit shall be calculated
             and recorded according to:
                                     r
                            Eip  =   ä    djx   EFsj              (Eq.22)
                                    j=1

                  where:
                            Eip  =    The   quarterly  mass  emission  of
                                      nitrogen  oxides for interim period
                                      (lb/quarter).

                            dj   =    The quarterly   fuel usage for each
                                      type    of    fuel   recorded    as
                                      mmscf/quarter or mgal/quarter).

                            EFsj =    The starting emission  factor  used
                                      to  calculate unit emissions in the
                                      initial allocation, as specified in
                                      Table  1 of Rule 2002 - Allocations
                                      for Oxides  of  Nitrogen  (NOx) and
                                      Sulfur (SOx) (lb/mmscf, lb/mgal).

                            r    =    The  number  of different types  of
                                      fuel consumed per quarter.

                            j    =    Each type of fuel.0

             Example calculation:Boiler burning natural gas, rated 6
             mmBtu/hr, in compliance with Rule 1146 starting year 1994

                         Emission factor = 49.18 lb/mmscf
                         Quarterly fuel usage =  1.1 mmscf per quarter

                  Eip  =      (49.18) x (1.1)
                       =      54.1 lb/quarter

             Applicable emission factor is also found in Volume II -
             Supporting Documentation, Appendix II-F - Methodology for
             NOx and SOx Starting and Ending Allocation Factors, Table 2-
             4 - Startpoint 1994 Emission Factors for Nitrogen Oxides.

        2.   Totalizing Fuel Meter-Based Emission Calculation
             The Facility permit holder shall use an emission factor
             shown in Table 1 of Rule 2002 or in Table 3-D or an approved
             equipment-specific or category-specific emission rate for
             each affected NOx Process Unit to calculate the quarterly
             emissions according to:
                                     r
                            Ek    =   ä   dj   x   EFj           (Eq.23)
                                    j=1

                            or

                                   r
                            Ek =   ä   dj  x  Vj  x  ERj          (Eq.24)
                                  j=1

                            where:

                            Ek = The  quarterly  emissions   of  nitrogen
                                 oxides (lb/quarter).

                            dj = The quarterly fuel usage for  each  type
                                 of  fuel  recorded by the fuel totalizer
                                 (mmscf/quarter or mgal/quarter)

                            EFj=The emission  factor specified in Table 1
                                 of Rule 2002 - Allocations for Oxides of
                                 Nitrogen  (NOx)   and  Sulfur  (SOx)  or
                                 specified   in  Table   3-D   (lb/mmscf,
                                 lb/mgal).  The  emission factor found in
                                 Table  1 of Rule 2002  may  or  may  not
                                 include    the    appropriate    control
                                 efficiency.

                            Vj = The higher heating value of each type of
                                 fuel    (mmBtu/mmscf    or   mmBtu/mgal)
                                 determined by the Facility Permit holder
                                 or assigned from Table 3-D.

                            ERj= The   equipment-specific  or   category-
                                 specific  emission  rate;  fuel-specific
                                 emission rate requested by the  Facility
                                 Permit holder (lb/mmBtu).

                            r  = The  number  of different types of  fuel
                                 consumed per month.


             3.   Timer-Based Emission Calculations
                       a.   If the NOx process  unit  is  equipped with a
                            timer,  the  quarterly  fuel usage  shall  be
                            estimated according to Eq.  25, 26 27, and 28
                            and the quarterly emissions for each affected
                            NOx   process   unit   shall   be  calculated
                            according to Eq. 23 and 24.

                      If the NOx process unit does not measure fuel with a
                  totalizing fuel meter, the quarterly fuel consumption for
                  each affected equipment shall be estimated according to:

                              d   =  dpu x (H/Hpu)                (Eq.25)

                              where:

                              d  =   The    estimated   quarterly    fuel
                                     consumption   of   an  affected  NOx
                                     process  unit  without  a  dedicated
                                     fuel    meter   (mmscf/quarter    or
                                     mgal/quarter).

                              dpu=   The quarterly  fuel  consumption  of
                                     all   NOx   process   units  at  the
                                     facility      (mmscf/quarter      or
                                     mgal/quarter).

                              H  =   The  quarterly  heat   input  of  an
                                     affected    equipment   without    a
                                     dedicated         fuel         meter
                                     (mmBtu/quarter).

                              Hpu =  The quarterly heat  input of all NOx
                                     process   units   at  the   facility
                                     (mmBtu/quarter).


             Example Calculation:
                       dpu  =    1,587 mmscf/quarter
                       H    =    5,400 mmBtu/quarter
                       Hpu  =    27,000 mmBtu/quarter
                       d    =    dpu x (H/Hpu)
                       d    =    1,587 mmscf/qtr x (5,400 mmBtu/qtr
                                  ö 27,000 mmBtu/qtr)
                       d    =    317.4 mmscf/qtr


                            The  quarterly  fuel usage for  all  the  NOx
                            process units at  the facility (dpu) shall be
                            calculated according to:

                            dpu  =    dfac  -  (dlarge  +  dmajor)(Eq.26)

                            where:

                            dfac =    The quarterly  fuel  usage  of  all
                                      major  and  large  sources  and NOx
                                      process   units   at  the  facility
                                      (mmscf/quarter or mgal/quarter).

                             dmajor=  The  quarterly fuel  usage  of  all
                                      major  NOx  sources at the facility
                                      (mmscf/quarter or mgal/quarter).

                             dlarge=  The quarterly  fuel  usage  of  all
                                      large  NOx  sources at the facility
                                      (mmscf/quarter or mgal/quarter ).

             Example Calculation:
                            dfac      =    174 mmscf/quarter
                            dmajor    =    126 mmscf/quarter
                            dlarge    =    30 mmscf/quarter
                            dpu       =    dfac  -  (dlarge  +  dmajor)
                            dpu       =    174 - (126 + 30)
                            dpu       =    18 mmscf/quarter


                            The  quarterly  heat input  of  all  the  NOx
                            process units at  the facility (Hpu) shall be
                            calculated according to:

                                          n
                            Hpu  =    ä (Ri x Ti)                 (Eq.27)
                                          i=1

                            where:

                            Ri   =    The maximum  rated fuel capacity of
                                      a NOx process unit (mmBtu/hr).

                            Ti   =    The quarterly accumulated operation
                                      hours  for  a  NOx   process   unit
                                      (hrs/quarter).

                            n    =    The  total  number  of  NOx process
                                      units at the facility.


             Example Calculation:
                            R1   =    3.5 mmBtu/hr
                            R2   =    2.7 mmBtu/hr
                            T1   =    480 hr/quarter
                            T2   =    120 hr/quarter

                                           2
                            Hpu  =    ä (Ri x Ti)
                                           i = 1

                            Hpu  =    (3.5 x 480) + (2.7 x 120)
                            Hpu  =    2004 mmBtu/quarter


                            The maximum rated heat input capacity  of all
                            NOx  process  units  shall  be  in  units  of
                            mmBtu/hr.   Since internal combustion engines
                            are usually rated  in  units  of  brake horse
                            power, the maximum rated heat input  capacity
                            of an engine shall be computed as follows:

                            R    =    0.002545 x bhp / eff        (Eq.28)

                            where:

                            R    =    The   maximum   rated   heat  input
                                 capacity

                            eff  =    The manufacturer's rated efficiency
                                      @LHV x (LHV/HHV)

                                 =    0.25,   if  not  provided  by   the
                                 operator

                            bhp  =    The  manufacturer's   rated   shaft
                                      output in brake horse power

             Example Calculation:

                            eff  =    0.25
                            bhp  =    75 bhp
                            R    =    0.002545 x bhp / eff
                            R    =    0.002545 x 75/.25
                            R    =    0.7635 mmBtu/hr

                  If gas turbines are rated in kilowatts, the rating
                  shall be converted to mmBtu/hr by applying the
                  manufacturer's heat rate (in mmBtu/kw-hr).  If the
                  manufacturer's heat rate is not available, a default value
                  of 15,000 Btu/kw-hr shall be used.

             Example Calculation:

                 Quarterly natural gas fuel usage for an ICE with maximum
                 rated bhp of 90 bhp, 0.25 eff and a boiler rated at 4
                 mmBtu/hr is being served by one fuel meter reading  10.5
                 mmscf.  The compliance emission rate of both ICE and
                 boiler is 0.3 lb/mmBtu.

                      ICE = 90 bhpBoiler= 4 mmBtu/hr
                      Fuel meter reading = dpu = 10.5 mmscf

                      I.C.E.
                       R = 0.002545 x 90/.25 = 0.916 mmBtu/hr
                       t = 3 hr/day x 7 days/wk. x 4 wk./mo. x 3 mo/qtr =
                           252 hr/qtr
                      Hice = R x t = 0.916 x 252 = 230.8 mmBtu/ quarter

                      Boiler
                       Hboiler = 4 mmBtu/hr x 24 hr./day x 7 day/wk. x 4
                                 wk./mo. x 3 mo/qtr
                       Hboiler = 8064 mmBtu/quarter
                       Hpu =  230.8 + 8064 = 8294.8 mmBtu/qtr

                      dice = dpu x (Hice/Hpu)
                       = 10.5 mmscf/qtr x (230.8/8294.8
                       = .298 mmscf/qtr

                      dboiler = dpu x (Hboiler/Hpu)
                       = 10.5 mmscf/qtr x (8064/8294.8)
                       = 10.2 mmscf/qtr

                      Eice = dice x V x ERc
                        = 1050 mmBtu/mmscf x 0.30 lb/mmBtu x .298
                          mmscf/qtr
                        = 93.87 lb/qtr
                      Eboiler = dboiler x V x ERc
                        = 10.2 mmscf/qtr x 1050 mmBtu/mmscf x 0.3
                          lb/mmBtu
                        = 3213 lb/qtr

                      E = Eice + Eboiler = 93.87 + 3213 lb/qtr = 3307
                          lb/qtr

             C.   TOTAL QUARTERLY EMISSIONS CALCULATION FOR ALL NOx
                  PROCESS UNITS AT THE FACILITY

                  The quarterly NOx emissions of all NOx process units at
                  the facility shall be estimated according to:


                              n
                   E    =     ä Ei                                (Eq.29)
                           i=1

                              m
                   Ei   =ä   Ej                                   (Eq. 30
                              j=1

                   where:

                  E    =   The  total  quarterly  emissions  for  all NOx
                               process units

                  Ei   =   The  quarterly  emission  of  each NOx process
                               unit (lb/quarter)

                  Ej   =   The  quarterly  emission of each  NOx  process
                               unit per type of fuel (lb/quarter)

                  i    =   Each type of affected NOx process unit

                  j    =   Each type of fuel

                  m    =   The total number  of  fuels  consumed for each
                               affected NOx process unit per quarter

                  n    =   The total number of NOx process  units  at the
                               facility.
             Example Calculation:

                            E1   =    163.8 lb/quarter
                            E2   =    78 lb/quarter
                            E3   =    120 lb/quarter
                                           n
                            E        =     ä   Ei  = 163.8 + 78 + 120
                                           i=1
                            E        =     361.8 lb/quarter

   D.   REPORTING PROCEDURES
        1.   The emissions data in any facility with an RTU shall be
             reported to Central Station Computer at the end of any
             quarter and the data shall be computed to determine the
             quarterly total emissions for each source using Equations 22
             through 28 as appropriate.
        2.   The total fuel usage data for all NOx process units in
             any facility without an RTU shall be recorded in a format
             approved by the Executive Officer and submitted to the
             District as part of the Quarterly Certified Report required
             by Rule 2004.
        3.   The Facility Permit holder of NOx process units shall
             maintain daily records of operation hours or quarterly usage
             rate for each NOx process unit.
        4.   Any changes made in type of fuel used and rated
             capacity for each source shall be recorded by the Facility
             Permit holder.
        5.   The Facility Permit holder of any NOx process unit that
             opts to monitor at the large source monitoring level shall
             meet the requirements set forth in "Chapter 3 Large Sources
             - Continuous Process Monitoring System (CPMS)".
   E.   FUEL METER SHARING
        1.   A single totalizing fuel meter shall be allowed to
             measure the cumulative fuel usage for more than one
             equipment provided that each equipment elects for the same
             emission rate or emission factor as specified in the
             Facility Permit and that any equipment in a process unit
             does not use the annual heat input in order to be
             categorized from a large source to a process unit.
        2.   One or more equipment in a process NOx unit shall be
             allowed to share the fuel totalizing meter with the
             equipment in a process NOx unit provided that each equipment
             elects for the same emission rate or emission factor as
             specified in the Facility Permit.
        3.   Fuel meter sharing for the interim period shall be
             allowed for those equipment in a process unit with the same
             emission rate oremission factor.
   F.   RULE 219 EQUIPMENT
        1.   Emission Determination And Reporting Requirements
             a.   The Facility Permit holder shall determine the
              emissions for one or more equipment exempt under Rule 219
              and report the emissions on a quarterly basis as part of the
              Quarterly Certified Emissions Report Certification of
              Emissions required by Rule 2004.  The Facility Permit holder
              shall be allowed to use the existing fuel totalizer, the
              monthly fuel billing statement, or any other equivalent
              methodology to estimate their fuel usage for a quarterly
              period.
             b.   Quarterly reporting periods shall start on January 1,
              1994 for Cycle 1 Facilities and July 1, 1994 for Cycle 2
              facilities.
             c.   The Facility Permit holder of each equipment shall
              maintain the quarterly fuel usage data for all equipment
              exempt under Rule 219 for three years.  Such data shall be
              made available to District staff upon request.
             d.   The fuel usage for equipment exempt under Rule 219 may
              be used in conjunction with fuel usage for process units
              provided that they have the same emission factor.
  B.   Emission Calculations
             The Facility Permit holder shall determine NOx
             emissions for equipment exempt under Rule 219 as follows :
                            n
                  E219 =    ä    EFRi xdi                         (Eq.31
                            i = 1

                  where:

                  E219 =     The  total  emissions  for  equipment exempt
                             under  Rule 219 estimated over  a  quarterly
                             period (lb/ per quarter).

                  EFRi =     The equipment-specific  or category-specific
                             emission  factor for each  equipment  exempt
                             under  Rule  219  equipment.   The  emission
                             factor can  be  found in Table 3-D (lb/mmscf
                             or lb/mgal).

                  di   =     The equipment-specific  or category-specific
                             fuel usage (mmscf/ per quarter  or mgal/ per
                             quarter).

                  n    =     The  number  of equipment exempt under  Rule
                             219.





                                      TABLE 4-A

                     MEASURED VARIABLES FOR ALL NOx PROCESS UNITS

         EQUIPMENT                      |         MEASURED VARIABLES
                        All NOx         | 1.Fuel usage or processing/feed
             rate or operating time
                   process units        | 2.Production rate;
                                        |












                                      TABLE 4-B

                    REPORTED VARIABLES FOR ALL  NOx PROCESS UNITS

          EQUIPMENT                 |          REPORTED VARIABLES
             All NOx                  1. Quarterly mass emissions
             process units