SJUAPCD RULE 3020 PERMIT FEE SCHEDULES
LAST REVISED 12/17/92



RULE 3020 - PERMIT FEE SCHEDULES

(Adopted May 21, 1992, Amended July 16, 1992, Amended December 17, 1992)

It is hereby determined that the cost of maintaining an active and effective program, issuing permits, performing inspections pertaining to such issuance, and responding to requests exceeds the fees prescribed herein. In determining the fees to be charged, the applicable equipment within each process that requires a permit will be totalled for each schedule. In the event that more than one fee schedule is applicable to a Permit to Operate, the governing schedule shall be that which results in the higher fee with the exception of service stations where Schedule 11 applies.

SCHEDULE 1

ELECTRIC MOTOR HORSEPOWER SCHEDULE

Any equipment which may cause the emission of air contaminants where an electric motor is used as the power supply shall be assessed a permit fee based on the total rated motor horsepower of all electric motors included in any source operation, in accordance with the following schedule:

Horsepower Fee
Up to and Including 25 $ 70
Greater than 25 but Less Than 50 $ 95
50 or Greater but Less Than 100 $160
100 or Greater but Less Than 200 $255
200 or Greater but Less Than 400 $335
400 or Greater but Less Than 800 $495
800 or Greater but Less Than 1,600 $665
1,600 or Greater $840



SCHEDULE 2

FUEL BURNING EQUIPMENT SCHEDULE

Any equipment which may cause the emission of air contaminants in which fuel is burned, with the exception of incinerators which are covered in Schedule 4 and electric power generating facilities which are covered in Schedule 8, shall be assessed a permit fee based upon the design fuel consumption of the equipment expressed in thousands of BTUs per hour using gross heating values of the fuel in accordance with the following schedule:

1,000 BTU Per Hour Fee
Up to and Including 150 $ 70
Greater Than 150 but Less Than 400 $ 95
400 or Greater but Less Than 650 $160
650 or Greater but Less Than 1,500 $255
1,500 or Greater but Less Than 2,500 $335
2,500 or Greater but Less Than 5,000 $495
5,000 or Greater but Less Than 15,000 $665
15,000 or Greater $840



SCHEDULE 3

ELECTRIC ENERGY SCHEDULE

Any equipment which may cause the emission of air contaminants and which uses electric energy, with the exception of electric motors covered in Schedule 1, shall be assessed a permit fee based on the total kilovolt ampere (KVA) rating, in accordance with the following schedule:

Kilovolt Amperes Fee
Up to and Including 45 $ 70
Greater than 45 but Less Than 145 $ 95
145 or Greater but Less Than 450 $160
450 or Greater but Less Than 1,450 $205
1,450 or Greater but Less Than 4,500 $295
4,500 or Greater but Less Than 14,500 $495
14,500 or Greater $840



SCHEDULE 4

INCINERATOR SCHEDULE

Any equipment designed and used primarily to dispose of combustible refuse by wholly consuming the material charged and leaving only the ashes or residue shall be assessed a permit fee based on the following schedule of the maximum horizontal inside cross-sectional area, in square feet, of the primary combustion chamber:

Area in Square Feet Fee
Up to and Including 8 $ 70
Greater Than 8 but Less Than 16 $ 95
16 or Greater but Less Than 27 $120
27 or Greater but Less Than 47 $185
47 or Greater but Less Than 90 $255
90 or Greater $375



SCHEDULE 5

STATIONARY CONTAINER SCHEDULE

Any stationary tank, reservoir, or other container, the contents of which may emit an air contaminant, except those owned or operated by a small producer as defined in Rule 1020 (Definitions) shall be assessed a permit fee based on the following schedule of capacities in gallons or cubic equivalent:

Gallons Fee
Up to 5,000 $ 60
5,000 or Greater but Less Than 20,000 $ 75
20,000 or Greater but Less Than 50,000 $110
50,000 or Greater but Less Than 100,000 $150
100,000 or Greater but Less Than 500,000 $200
500,000 or Greater but Less Than 1,000,000 $245
1,000,000 or Greater $310



Any stationary tank, reservoir, or other container, owned and operated by a small producer, as defined in Rule 1020 (Definitions), the contents of which may emit an air contaminant shall be assessed a permit fee based on the following schedule of capacities in gallons or cubic equivalent:

Gallons Fee
Up to and Including 5,000 $ 25
Greater than 5,000 but Less Than 20,000 $ 35
20,000 or Greater but Less Than 50,000 $ 50
50,000 or Greater but Less Than 100,000 $ 60
100,000 or Greater but Less Than 500,000 $ 80
500,000 or Greater but Less Than 1,000,000 $105
1,000,000 or Greater $150



SCHEDULE 6

MISCELLANEOUS SCHEDULE

Any source operation which may cause the issuance of air contaminants as defined in Rule 1020 (Definitions) , which is not included in other schedules shall be assessed a permit fee of $85 per source operation.



SCHEDULE 7

RESOURCE RECOVERY SCHEDULE

Any equipment which may cause the emission of air contaminants from the combustion of tires or other waste material used for the generation of electric power shall be assessed a permit fee based on the gross output of the electric generating equipment in accordance with the following schedule:

Kilowatts Fee
Up to and Including 1,000 $ 2,670
Greater than 1,000 but Less Than 5,000 $ 4,460
5,000 or Greater but Less Than 10,000 $11,000
10,000 or Greater but Less Than 20,000 $23,310
20,000 or Greater $44,620





SCHEDULE 8

ELECTRIC GENERATION SCHEDULE

Any equipment which may cause the emission of air contaminants from the combustion of fossil or wood-derived fuel (including agricultural waste or biomass) for the generation of electric power shall be assessed a permit fee based on the gross output of the electric generating equipment in accordance with the following schedule:

Kilowatts Fee
Up to and Including 500 $ 210
Greater than 500 but Less Than 1,000 $ 625
1,000 or Greater but Less Than 5,000 $1,250
5,000 or Greater but Less Than 10,000 2,500
10,000 or Greater but Less Than 20,000 4,170
20,000 or Greater but Less Than 35,000 6,670
35,000 or Greater 8,340



SCHEDULE 9

STEAM-ENHANCED CRUDE OIL PRODUCTION WELL SCHEDULE

Steam-enhanced crude oil production wells, except those owned by a small producer, shall be assessed a permit fee of $7.50 per well. A single permit authorizing 150 or more steam-enhanced crude oil production wells not served by a vapor recovery system and not owned by a small producer shall be assessed a permit fee of $1,125.

Steam-enhanced crude oil production wells owned by a small producer shall be assessed a permit fee of $3.75 per well. A single permit authorizing 150 or more steam-enhanced crude oil production wells owned by a small producer and not served by a vapor recovery system shall be assessed a permit fee of $562.50.

SCHEDULE 10

INTERNAL COMBUSTION ENGINE SCHEDULE

Any stationary piston type internal combustion engine of greater than 50 brake horsepower shall be assessed a permit fee based on the following schedule of horsepower:

Brake Horsepower Fee
Greater than 50 but Less Than 100 $ 65
100 or Greater but Less Than 200 $ 95
200 or Greater but Less Than 400 $195
400 or Greater but Less Than 800 $390
800 or Greater but Less Than 1,000 $490
1,000 or Greater but Less Than 5,000 $610
5,000 or Greater but Less Than 10,000 $735
10,000 or Greater $850





SCHEDULE 11

FUEL DISPENSING EQUIPMENT SCHEDULE

Any fuel dispensing equipment (including stationary fuel storage tanks, dispensers, and associated piping) established at a single location which is primarily used for the purpose of fueling vehicles and equipment shall be assessed a permit fee based on the number of fuel dispensing nozzles at a fee of $27 per nozzle.



SCHEDULE 12

COMMERCIAL OFFSITE MULTIUSER HAZARDOUS AND

NONHAZARDOUS WASTE DISPOSAL FACILITIES

Each affected facility shall be assessed a permit fee based upon the size of the facility as specified in the conditional use permit issued by the appropriate city or county planning department or based upon the maximum potential size of the facility as determined by the APCO. In determining this fee, the following schedule shall be utilized:

Acres Fee
Up to and Including 5 $650
Greater than 5 but Less Than 10 $720
10 or Greater but Less Than 15 $ 785
15 or Greater but Less Than 20 $ 850
20 or Greater but Less Than 25 $ 915
25 or Greater but Less Than 30 $ 985
30 or Greater but Less Than 35 $1,050
35 or Greater but Less Than 40 $1,120
40 or Greater but Less Than 45 $1,185
45 or Greater but Less Than 50 $1,250
50 or Greater but Less Than 55 $1,320
55 or Greater but Less Than 60 $1,385
60 or Greater but Less Than 65 $1,450
65 or Greater but Less Than 70 $1,520
70 or Greater but Less Than 75 $1,585
75 or Greater but Less Than 80 $1,650
80 or Greater but Less Than 85 $1,720
85 or Greater but Less Than 90 $1,785
90 or Greater but Less Than 95 $1,850
95 or Greater but Less Than 100 $1,920



For facilities 100 acres or greater, the fee shall be increased at $80 increments for each additional five (5) acre increase beyond that provided above.