Comment 32 for Public Workshop on the 2022 Scoping Plan Update – Initial Modeling Results Workshop (sp22-modelresults-ws) - 1st Workshop.


First Name: Phil
Last Name: Birkhahn
Email Address: pbirkhahn@outlook.com
Affiliation: Co-Chair Transportation Com San Diego350

Subject: ELECTRICITY TO MAKE HYDROGEN IS HIDDEN
Comment:

ELECTRICITY TO MAKE HYDROGEN IS HIDDEN

by Phil Birkhahn, Co-Chair Transportation Committee, San Diego 350

E3 Slides 25 and 26

The two slides, E3 25 and 26, hide the massive environmental impact of hydrogen fuel cells.  In addition to the fuel cell capacity, renewable electricity capacity of 55 GW is required for other electricity hogging steps before hydrogen is pumped into a fuel cell.  It is shown in my edit of your graphic.

Only one-third of the electricity used to make and deliver hydrogen is regenerated by the fuel cells.  That low efficiency of just 33% must be carefully considered and all other options exhausted before the desperate move to hydrogen is made.

Just saying the “loads . . . . will be provided by off-grid renewables” on E3 Slide 24 is a cop out.  Vast amounts of land will be required for the solar panels and maybe some wind turbines.

The huge demand for land for solar farms, is on the same order as the entire generating capacity of California today.  Think three times more solar panels in the desert.

Competition for the land will surely drive up the cost of all electricity used in California. 

Question:  Why do columns for Alternatives in E3 Slides 25 and 26 show no fuel cell capacity.  Other slides in the E3 presentation indicate substantial demand and use of hydrogen.  Will of that hydrogen be burned?


Attachment: www.arb.ca.gov/lists/com-attach/35-sp22-modelresults-ws-AnJTewRaUWBXOFAi.pdf

Original File Name: P. Birkhahn CARB Comment April 4 2022.pdf

Date and Time Comment Was Submitted: 2022-04-04 15:42:25