First Name: | Gail |
---|---|
Last Name: | Sevrens |
Email Address: | gsevr@parks.ca.gov |
Affiliation | California State Parks |
Subject | Request Revision to CAR Forest Project Protocol 3.2 Re: Definition of Project Area Boundar |
Comment |
The California Department of Parks and Recreation (California State Parks) requests changes to the FPP 3.2 language in order to allow a Forest Owner to finalize the geographic boundaries of the Project Area at the second site verification. This would apply to Reforestation Projects that have elected to defer initial inventory until the second site verification (FPP 3.2, Section 6.1.1). The Forest Owner would be required to submit a “draft” set of geographic boundaries for the Project Area that met all eligibility requirements at the initial project verification. However, these Project Area boundaries could be revised and finalized at the second site verification as long as the finalized boundaries are the same, or a subset of, the original “draft” boundaries submitted and verified for eligibility at the initial verification. The reason for this proposed revision is the need for flexibility to define acres to be planted over first 10-12 years of the project that will ensure maximum success and survivability of the reforestation, protect resources, and avoid unneeded costs. See Attached Letter for further Explanation of Request for Revision |
Attachment |
www.arb.ca.gov/lists/sb375-general-ws/1320-proposed_revision_to_fpp3_2_to_carb_2011-02-16.pdf Original File Name: Proposed Revision to FPP3 2 to CARB 2011-02-16.pdf
Date and Time Comment Was Submitted: 2011-02-18 12:39:47 |
If you have any questions or comments please contact Office of the Ombudsman at (916) 327-1266.