arbcombo -- Transport Refrigeration Unit and Operator Report Registration

Posted: 12 Mar 2009 14:51:30
System Down Time for ARB Equipment Registration (ARBER) and
filing of Operator Reports. If you are registering or plan to
register your Transport Refrigeration Units (TRUs) or TRU
Generator Sets (gensets) on the ARB Equipment Registration
(ARBER) system, please note:  The system will be down for several
minutes tonight at 7 pm Pacific Standard Time.  

Operator Reports:

If you have a California-based facility from which you operate
TRUs owned by yourself or by another party, you must comply with
the Operator Report requirements of the TRU ATCM by March 16,
2009.  

Currently the ARBER system does not accept facility
registrations without inputting an IDN.  Due to the delay
experienced by some equipment owners in registering their TRUs or
TRU generator sets, some California-based Operators will not have
all, or any, of the IDNs needed to complete their Operator
Reports by the March 16 deadline.  

If you are a California-based Operator and do not have the IDNs
you need for your Operator Report, please log on to the TRU
website (http://www.arb.ca.gov/diesel/tru.htm) for special
instructions at the top of the page.  

Thank you for your cooperation and patience.

ARBER Project Coordinator

 



You are receiving this single arbcombo email because you are a